Change order of monitors without changing fullscreen"size"
Posted
by
user171489
on Ask Ubuntu
See other posts from Ask Ubuntu
or by user171489
Published on 2013-06-30T14:26:55Z
Indexed on
2013/07/02
11:15 UTC
Read the original article
Hit count: 456
I have a dual monitor setup. My primary monitor is a 22" with a max resolution of 1680x1050 and my secondary is a 19" with a max resolution of 1280x1024. The secondary is standing on the left side of the primary one.
My problem now is, that, if I change the order of the monitors in my nvidia x-server settings, so that my secondary is the first one (or the one on the left), the fullscreen mode in flash in scaled up to my secondary monitor, even if it´s displayed on my primary one. Meaning that i get a 1280x1024 "fullscreen" window on my bigger primary monitor. When I configure my x-server settings so the secondary monitor is the one on the right, I don´t have this problem. The only thing then is, that I have to scroll out on the right to get to my monitor on the right.
I can´t move my secondary monitor on the right side of my primary due to lack of space and my belief that there must be a software solution. ;)
Thanks in advance.
© Ask Ubuntu or respective owner