Search Results

Search found 10731 results on 430 pages for 'k day'.

Page 106/430 | < Previous Page | 102 103 104 105 106 107 108 109 110 111 112 113  | Next Page >

  • Extracting Data Daily from MySQL to a Local MySQL DB

    - by Sunny Juneja
    I'm doing some experiments locally that require some data from a production MySQL DB that I only have read access to. The schemas are nearly identical with the exception of the omission of one column. My goal is to write a script that I can run everyday that extracts the previous day's data and imports it into my local table. The part that I'm most confused about is how to download the data. I've seen names like mysqldump be tossed around but that seems a way to replicate the entire database. I would love to avoid using php seeing as I have no experience with it. I've been creating CSVs but I'm worried about having the data integrity (what if there is a comma in a field or a \n) as well as the size of the CSV (there are several hundred thousand rows per day).

    Read the article

  • Jsoup to get data on <b> block

    - by Poh Sun
    I'm new to JSoup on Java and would like to enquire few questions. Given the HTML code of the page I would like to get is this <td width="70%" class="row1"> <b>4</b> <br />( 0 posts per day / 0.00% of total forum posts ) </td> My question here is I want to get the data 4 but the output I get is 4 ( 0 posts per day / 0.00% of total forum posts ) Here is my Java code Iterator <Element> element = totalPost.select("td[width=70%][class=row1]").iterator(); System.out.println(element.next().text()); Sorry if my question is not clear enough.

    Read the article

  • Is this possible with Sql 2005 CTE?

    - by aenima1982
    I have been working on a query that will return a suggested start date for a manufacturing line based on due date and the number of minutes needed to complete the task. There is a calendar table(LINE_ID, CALENDAR_DATE, SCHEDULED_MINUTES) that displays per manufacturing line, the number of minutes scheduled for that day. Example: (Usually 3 shifts worth of time scheduled per day, no weekends but can vary) 1, 06/8/2010 00:00:00.000, 1440 1, 06/7/2010 00:00:00.000, 1440 1, 06/6/2010 00:00:00.000, 0 1, 06/5/2010 00:00:00.000, 0 1, 06/4/2010 00:00:00.000, 1440 In order to get the suggested start date, I need to start with the due date and iterate downward through the days until i have accumulated enough time to complete the task. My Question can something like this be done with CTE, or is this something that should be handled by a cursor. Or... am i just going about this the wrong way completely??

    Read the article

  • importing data using get or create - identity error 1062

    - by hamackey
    I am importing data from a mssql database into mysql. Works except when it encounters the id of a previous entry. id is unique. I need to get entries that already exist so that they can be placed in the work of the day. Error is IntegrityError: (1062, "Duplicate entry '001355338' for key 2") This entry is already in the database. I need it entered for that day, but can not have it added to the table. It is already there. def handle(self, *args, **options): 59 #patients_local = Patient.objects.all() 60 #attendings_local = Attending.objects.all() 61 connection = pyodbc.connect("XXXXXXXXXXX") 62 cursor = connection.cursor() 63 cursor.execute(COMMAND) 64 rows = cursor.fetchall() 65 for row in rows: 66 # get_or_create returns (object, boolean) 67 p, created = Patient.objects.get_or_create( 68 first_name = row.Firstname, 69 middle_name = '', 70 last_name = row.Lastname, 71 id = row.id, 72 )

    Read the article

  • Cloud HUGE data storage options?

    - by ToughPal
    Hi, Does anyone have a good suggestion on how to do video recording? We have a camera that can record and then stream live video to a server. So this means we can have 1000's of cameras sending data 24X7 for recording. We will store data for over 7 / 14 / 30 days depending on the package. Per day if a camera is sending data to the server then it will store 1.5GB. So that means there is a traffic of 1.5GB / day / camera Total monthly 45GB / month / camera (Data + bandwidth for one camera) Please let me know the most cost effective way to get this data stored? Thanks!

    Read the article

  • Can't fill a column of NULLs with actual values by making an association to the proper values in the

    - by UkraineTrain
    I have a table with separate columns for months, days and a varchar column for 6 hour increments for each day ('12AM', '6AM', '12PM', '6PM'). There's also a column that's supposed to have calculated numeric values for each of those 6 hour increments. These calculated values come from some reference table. This reference table contains values for each day for several months broken down by hour where each hour has its own column. So, basically, I have to add the values for each 6 hour increment. I have no idea how to associate the correct values in the reference table to those 6 hour increments. I will really appreciate any help on this.

    Read the article

  • How do you calculate expanding mean on time series using pandas?

    - by mlo
    How would you create a column(s) in the below pandas DataFrame where the new columns are the expanding mean/median of 'val' for each 'Mod_ID_x'. Imagine this as if were time series data and 'ID' 1-2 was on Day 1 and 'ID' 3-4 was on Day 2. I have tried every way I could think of but just can't seem to get it right. left4 = pd.DataFrame({'ID': [1,2,3,4],'val': [10000, 25000, 20000, 40000],'Mod_ID': [15, 35, 15, 42], 'car': ['ford','honda', 'ford', 'lexus']}) right4 = pd.DataFrame({'ID': [3,1,2,4],'color': ['red', 'green', 'blue', 'grey'], 'wheel': ['4wheel','4wheel', '2wheel', '2wheel'], 'Mod_ID': [15, 15, 35, 42]}) df1 = pd.merge(left4, right4, on='ID').drop('Mod_ID_y', axis=1)

    Read the article

  • Oracle: delete suddenly taking a long time

    - by Damo
    Hi We have a feed process which runs every day of the year. As part of that we delete every row from a table (approx 1 million rows) every day, repopulate it using 5 different stored procedures and then commit the transaction. This is the only commit statement that we call. All of a sudden the delete has started takign about 2 hours to complete. The delete is also very simple (delete from T_PROFILE_WORK) This has worked perfectly well for the past year, but in the past week i have noticed this issue. Any help on this is greatly appreciated Thanks Damien

    Read the article

  • Running applictions via ruby and multi-core support? (OSX)

    - by Nick Faraday
    Hi All, I'm looking for some tutorials/resources/tips that will show me how to run applications via a ruby script. I have several small tools that we use in our day to day operations that I want to manage their tasks in one ruby script. Basically what I'm trying to do is: run app via ruby script. (wait for result) get result code (success, or error msg) if ok, start the app on its next task. Also each of the tasks are independent so I'd like to take advantage of the 8 cores on my MacPro and run 8 instances at a time. Any resources you could point me towards would be greatly appreciated!

    Read the article

  • R graphics plotting a linegraph with date/time horizontally along x-axis

    - by user2978586
    I want to get a linegraph in R which has Time along x and temperature along y. Originally I had the data in dd/mm/yyyy hh:mm format, with a time point every 30 minutes. https://www.dropbox.com/s/q35y1rfila0va1h/Data_logger_S65a_Ania.csv Since I couldn't find a way of reading this into R, I formatted the data to make it into dd/mm/yyyy and added a column 'time' with 1-48 for all the time points for each day https://www.dropbox.com/s/65ogxzyvuzteqxv/temp.csv This is what I have so far: temp<-read.csv("temp.csv",as.is=T) temp$date<-as.Date(temp$date, format="%d/%m/%Y") #inputting date in correct format plot(temperature ~ date, temp, type="n") #drawing a blank plot with axes, but without data lines(temp$date, temp$temperature,type="o") #type o is a line overlaid on top of points. This stacks the points up vertically, which is not what I want, and stacks all the time points (1-48) for each day all together on the same date. Any advice would be much appreciated on how to get this horizontal, and ordered by time as well as date.

    Read the article

  • How to change the date format in JavaScript?

    - by Nitz
    Hey Guys I am using one jquery date picker, with using picker i am getting date in like this format Friday, May 21, 2010 Now i want to add one day in this date so i think, i can only do if i change the date in exact format like 21/5/2010 I want to only convert that bcz i want to add one day to the particular date. So what do u suggest me? How can I do that? Can i do without converting it ? thanks in advance....

    Read the article

  • Does deleting temporary symlinks interrupt current downloads/access to that symlink?

    - by Joe
    I am using symlinks generated in PHP. They are generated when someone requests a download, and I want them to expire at the end of each day. The problem is, what if someone starts downloading a symlink 1 minute before the end of the day and then I delete the symlink while they are downloading it... My question is, to your knowledge will that individual downloading the symlink, right before I delete it, still be able to "download" the file? I am not worried about "resumable download" capability.. but will it make their download stop or break in some way?

    Read the article

  • Ruby on Rails - Calendar Display

    - by user335725
    We want to create a calendar view in a room scheduling application. The outcome we want is to have hours open (variable depending on day) across the top of the grid and the names of the rooms down the left side of the grid. The body would be populated with bookings for that day. The visual we're seeking is similar to the "Weekly Builder" plugin for Rails (http://dmix.ca/2009/06/weeklybuilder-a-weekly-calendar-plugin-for-rails/). We've tried using CSS to create variably-sized images, but this isn't working out. Are there any plugins available or other ways anyone can think of to accomplish this kind of visual? Thanks

    Read the article

  • How to change a DateTime Format

    - by Carlo Adap
    List<DateTime> datetimerange = new List<DateTime>(); DateTime StartDate = Convert.ToDateTime(txtDate.Text); DateTime EndDate = Convert.ToDateTime(TextBox1.Text); foreach (DateTime day in EachDay(StartDate, EndDate)) { datetimerange.Add(day.Date); Session["SelectedDatess"] = datetimerange; } When I displays it to a list box the date looks like 8/28/2012 12:00:00 whereas I just want to display 8/28/2012. How can I change the format of the date to MM/dd/yyyy?

    Read the article

  • jquery datepicker - retrieve events and show on hover in dialog - allow the a href to be clicked to access individual event entries

    - by paul724
    Please see this jsfiddle - http://jsfiddle.net/paul724/HXb6v/ What is working: The datepicker displays correctly, picks up the css for todays date and on hover. The dialog box follows the mouse On click the dialog box "stops" and displays a link What I want to achieve When a table cell is hovered over the title of the dialog box shows the date e.g "Mon 8th Oct 2012" When a table cell is hovered over the html of the dialog box shows the events for that day in list format (there is code that succesfully retrieves the first row in function getSelectedDates() ) function getSelectedDates() needs to be called in the hover event - showing multiple events for that date in the dialog box I hope that if we can display the date being hovered over in the title of the dialog then we can use the same information to retrieve the rows from the database to populate the html of the dialog for that day

    Read the article

  • Why is 1942/4/3 00:00:00 an illegal date in java.util.Calendar?

    - by Aleksi
    Is there something special in the date 3rd of April 1942? For some reason the the hour of day 0 (12:00 am) is illegal for this specific date. The date is accepted when a lenient calendar is used but the hour of day is incremented to 1 (1:00 am). Relevant code java.util.Calendar calendar = java.util.Calendar.getInstance(); calendar.clear(); calendar.setLenient(false); calendar.set(1942, 3, 3, 0, 0, 0); calendar.getTimeInMillis(); Exception java.lang.IllegalArgumentException: HOUR_OF_DAY at java.util.GregorianCalendar.computeTime(Unknown Source) at java.util.Calendar.updateTime(Unknown Source) at java.util.Calendar.getTimeInMillis(Unknown Source) I'd really prefer is the dates were not lenient as I don't want to accept impossible dates.

    Read the article

  • Add Expansion Button to Stackpanel

    - by scientist
    I'd like to add Elements to a StackPanel (or Listbox / Listview if it would make that easier) and automatically add a Button (like "...") to indicate that there are more children than there is space for. Consider a calendar that has appointment items in each day. If there are more appointments than as much as can be displayed a button is displayed to go to a detailed view for that day. Can this be done automatically, or how do I calculate the positions of the stackpanel and its items. It's for windows store development in c#. Thanks in advance.

    Read the article

  • rspec mocking object property assignment

    - by charlielee
    I have a rspec mocked object, a value is assign to is property. I am struggleing to have that expectation met in my rspec test. Just wondering what the sytax is? The code: def create @new_campaign = AdCampaign.new(params[:new_campaign]) @new_campaign.creationDate = "#{Time.now.year}/#{Time.now.mon}/#{Time.now.day}" if @new_campaign.save flash[:status] = "Success" else flash[:status] = "Failed" end end The test it "should able to create new campaign when form is submitted" do campaign_model = mock_model(AdCampaign) AdCampaign.should_receive(:new).with(params[:new_campaign]).and_return(campaign_model) campaign_model.should_receive(:creationDate).with("#{Time.now.year}/#{Time.now.mon}/#{Time.now.day}")campaign_model.should_receive(:save).and_return(true) post :create flash[:status].should == 'Success' response.should render_template('create') end The problem is I am getting this error: Spec::Mocks::MockExpectationError in 'CampaignController new campaigns should able to create new campaign when form is submitted' Mock "AdCampaign_1002" received unexpected message :creationDate= with ("2010/5/7") So how do i set a expectation for object property assignment? Thanks

    Read the article

  • Store data in Ruby on Rails without Database

    - by snowmaninthesun
    I have a few data values that I need to store on my rails app and wanted to know if there are any alternatives to creating a database table just to do this simple task. Background: I'm writing some analytics and dashboard tools for my ruby on rails app and i'm hoping to speed up the dashboard by caching results that will never change. Right now I pull all users for the last 30 days, and re arange them so I can see the number of new users per day. It works great but takes quite a long time, in reality I should only need to calculate the most recent day and just store the rest of the array somewhere else. Where is the best way to store this array? Creating a database table seems a bit overkill, and i'm not sure that global variables are the correct answer. Is there a best practice for persisting data like this? If anyone has done anything like this before let me know what you did and how it turned out.

    Read the article

  • C# Replace two specific commas in a string with many commas

    - by Hal
    I am trying to change the date format in each line from commas to hyphens. The index of the comma separating the month and day day and year varies. lines_in_List[i] = lines_in_List[i].Insert(0, cnt + ","); // Insert Draw # in 1st column string one_line = lines_in_List[i]; // 0,5,1,2012,1,10,19,16,6,36,,, // 1,11,5,2012,49,35,23,37,38,28,,, // 2,12,10,2012,8,52,53,54,47,15,,, // ^-^--^ replace the ',' with a '-'. StringBuilder changed = new StringBuilder(one_line); changed[3] = '-'; changed[5] = '-'; changed[3] = '-'; lines_in_List[i] = changed.ToString(); }

    Read the article

  • Memcached - how to deal with adding/deploying servers

    - by Industrial
    Hi everybody, How do you handle replacing/adding/removing memcached nodes in your production applications? I will have a number of applications that are cloned and customized due to each customers need running on one and same webserver, so i'll guess that there will be a day when some of the nodes will be changed. Here's how memcached is populated by normal: $m = new Memcached(); $servers = array( array('mem1.domain.com', 11211, 33), array('mem2.domain.com', 11211, 67) ); $m->addServers($servers); My initial idea, is to make the $servers array to be populated from the database, also cached, but file-based, done once a day or something, with the option to force an update on next run of the function that holds the $addservers call. However, I am guessing that this might add some additional overhead since disks are quite slow storage... What do you think?

    Read the article

  • Setting a ViewController's properties after instantiation

    - by Craig
    I'm creating an instance of a viewController, and then trying to set the text on of it's properties, a UILabel. BoyController *boyViewController = [[BoyController alloc] initWithNibName:@"BoyView" bundle:nil]; NSString *newText = [astrology getSignWithMonth:month withDay:day]; boyViewController.sign.text = newText; NSLog(@" the boyviewcontroller.sign.text is now set to: %@", boyViewController.sign.text); [newText release]; I tried this, but it didn't work... So I tried the following: BoyController *boyViewController = [[BoyController alloc] initWithNibName:@"BoyView" bundle:nil]; UILabel *newUILabel = [[UILabel alloc] init]; newUILabel.text = [astrology getSignWithMonth:month withDay:day]; boyViewController.sign = newUILabel; NSLog(@" the boyviewcontroller.sign.text is now set to: %@", newUILabel.text); [newUILabel release]; But no avail.. I'm not sure why I can't set the text property of the UILabel "sign" in boyViewController..

    Read the article

  • Eclipse + CVS use custom commit

    - by WizKiranPuttur
    Hi All, My admin has set up the "cvs commit" in a very non traditional way, instead of typing "cvs commit" I use the admin provided "scriptname modified file" to checkin the file to CVS. I am using Eclipse to my day to day work and till now I am using the Eclipse CVS Plugin to checkout the repo,update,compare,etc and use the command line to checkin. I am getting annoyed by having to go to command line to do the commit, is there any way I can make Eclipse accept when I say commit it invokes the admin script instead of "cvs commit" ? I spoke to Admin and moving the under the cvs pre-commit hooks is not an option. What can I do ? I know fair amount of "Java" I am willing to do some changes to CVS plugin if I know how and where. Thanks

    Read the article

  • user specific persistent cck types in drupal

    - by Fion
    Is there a way to do the following. We need to have a few basic cck types that will allow users to track their chosen parameters over a length of time. For example, one cck type may be called "numeric tracker" It would have a field for labeling the type and a field for entering a number. User A might label one numeric tracker "miles driven". Then each day user A would use this type to enter a number. User B might label a numeric tracker "hours slept". Each day user B would enter a number. Is there a way to use cck in this way?

    Read the article

< Previous Page | 102 103 104 105 106 107 108 109 110 111 112 113  | Next Page >