Search Results

Search found 19947 results on 798 pages for 'microsoft smtp'.

Page 165/798 | < Previous Page | 161 162 163 164 165 166 167 168 169 170 171 172  | Next Page >

  • Excel CSV import treating quoted strings of numbers as numeric values, not strings

    - by MichaelOryl
    I've got a web application that is exporting its data to a CSV file. Here's one example row of the CSV file in question: 28,"65154",02/21/2013 00:00,"false","0316295","8316012,8315844","MALE" Since I can't post an image, I'll have to explain the results in Excel. The "0316295" field gets turned into a number and the leading 0 goes away. The "8316012,8315844" gets interpreted as one single number: 83,160,128,315,844. That is, most obviously, not the intended result. I've seen people recommend a leading single quote for such cases, but that doesn't really work either. 28,"65154",02/21/2013 00:00,"false","'0316295","'8316012,8315844","MALE" The single quote is visible at all times in the cell in Excel, though if I enter a number with a leading single quote myself, it shows just the intended string and not the single quote with the string. Importing is not the same as typing, it seems. Anybody have a solution here?

    Read the article

  • Positive result, negative result and current balance. How do you make starting balance show current result?

    - by Tine
    I have 3 columns. Column A shows positive result and if the result is negative then it is in a column B. Column B shows negative result and if the result is positive then it is in a column A. (meaning that either columns can have 0.00 in the cell (empty zero cells)). Column C has starting assets and it also shows the current balance that while result A or B are adding up and current balance is showing the current result. What is the proper formula for this I hope I was clear with my problem. Please help. Thanks in advance!

    Read the article

  • Can't edit a specific document in Word 2007

    - by Benjotron
    I have a document in Word 2007 that seems to be read only. There are forms in the document that I can type in, but I can't edit or reformat the rest of the document. There is probably a setting somewhere I can flip to make it editable again but I can't find it for the life of me. FOLLOW UP: The "Protect Document" button only had "Unrestricted Access" checked, this was one of the first things I checked. However, when I tried checking "Restrict Formatting and Editing" it brought up the Restrict Formatting and Editing sidebar, which stated: This document is protected from unintentional editing. You may only fill in forms in this region. With a stop protection button on the bottom, which of course solved the problem. I think that menu item just has a bad name, it should be "Restrict Formatting and Editing Options or Settings"

    Read the article

  • PowerPoint slide resolution? (Optimizing video playback)

    - by Dan
    In PowerPoint 2007, there seems to be no way of changing the resolution slide (only the aspect ratio and the output resolution can be chnaged?). If this is the case, then how do I optimize an inserted video for playback using an HD projector? Can I simply insert a video at high resolution and scale it down to fit the slide? Will these extra pixels come to use if the output resolution is high? Thanks!

    Read the article

  • Best way to export powerpoint slides into pngs with different resoltuions?

    - by Henrik
    I am trying to convert powerpoint slides into a png. I know that there are several ways that allow to do this by allowing for changing the resolution (e.g., within powerpoint by changing the registry, or using pdf printers as proposed here and here). However, always changing the registry is cumbersome and using the pdf printer (bullzip printer and pdfforge) is not working as expected. Does anyone know of easy, free and reliable way to export powerpoint (2010) slides into png pictures while allowing to easily change the resoltuion?

    Read the article

  • How to make project auto-estimate duration based on work?

    - by Bruno Brant
    This one has bothered me for a long while. I like to do estimates thinking on how much time a certain task will take (I'm in TI business), so, let's say, it takes 12 hours to build a program. Now, let's say I tell Project that my beginning date is today. If I allocate one resource to this task, it means that the task will last 1,5 days, implying that it will end tomorrow. But right now, that is not what it's doing. I say that the task will take 1 hour, and when I add a resource to it, it allocate the resource at [13%] basis, which means that the duration is still fixed... project is trying to make the task last for a day. I have, on many occasions, accomplished this. What I do is build a plan based on these rough estimates for effort, then I allocate tasks to resources. Times conflict, so I level resources and then Project magically tells me how long, in days, will it take. But every time I have to start estimating again, I end up having trouble on how to make project work like that.

    Read the article

  • Excel annoyance: How to maintain formulas in a ledger?

    - by davidcl
    A common use of Excel is to create a spreadsheet which functions as a transaction ledger of some kind, where one or more fields in each row is calculated by adding a value or values from the current row to a value from the previous row. For example, if column C holds the value of a transaction and column D holds the balance, then the formula in row D3 might be =D2+C3. This formula would be repeated for every row in the ledger. A common annoyance when maintaining this type of spreadsheet is that if you insert a row into the middle of such a ledger, that row may be skipped when calculating the balance-- the formulas in the subsequent row have to be updated along with the formulas in the inserted row. Do you have any techniques for avoiding these problems?

    Read the article

  • Cumulative average using data from multiple rows in an excel table

    - by Aaron E
    I am trying to calculate a cumulative average column on a table I'm making in excel. I use the totals row for the ending cumulative average, but I would like to add a column that gives a cumulative average for each row up to that point. So, if I have 3 rows I want each row to have a column giving the average up to that row and then the ending cumulative average in the totals row. Right now I can't figure this out because I'd be having to reference in a formula rows above and below the current row and I'm unsure about how to go about it because it's a table and not just cells. If it was just cells then I know how to do the formula and copy it down each row, but being that the formula I need depends on whether or not a new row in the table is added or not I keep thinking that my formula would be something like: (Completion rate row 1/n) where n is the number of rows up to that point, here row 1, then ((Completion rate row 1 + Completion rate row 2)/n) for row 2 so n=2, and so on for each new row added. Please advise.

    Read the article

  • Add Excel column without breaking equation

    - by CRAIG
    I have completed a very complex Excel spreadsheet with a lot of equations, except ... I forgot to include September I have Jan through Dec, all the months, except the calculations for September. Of course all the equations are currently perfect for the data that's here. How do I add a whole new column without ruining the previous equations? PS: tomorrow is my holidays and I have to go to work to finish this table, so bad

    Read the article

  • How to batch process files with word forms?

    - by Konrads
    Hello, I have a bunch of word forms filled in and I need to get that data to Excel / CSV / anything structured. I've seen solutions on web on how to do it one at a time but are there established methods on how to do it in batch? I wanted to ask before writing a powershell script.

    Read the article

  • How do I import Outlook 2007 accounts and rules and IE usernames and stored passwords from old HD?

    - by raya
    I had an older PC running Win7 and the motherboard died on me. I've since updated my PC to another Win7 machine running a RAID 0 along with my old HDD installed as an extra drive. The problem is, I need to somehow import my Outlook email accounts (10) and rules along with my IE usernames and adjacent stored passwords for all the sites I've visited. I don't want to have to recreate the wheel for all this data. What I've found is that I have to run regedit in order to do so, but I cannot seem to boot to the old drive in order to run regedit and export the files. Can someone please help me?

    Read the article

  • How to fore Word to recompute image numbers?

    - by Vojtech Ruzicka
    I have a word document containing images and tables. These have captions which are numbered, like "Image 1-Example of something". Later on I decided to rearrange some of chapters of my document. However numbering of objects remained the same, so the first image is image 8, the second is image 3, etc. I want to force Word to recompute image numbering so first image in document would be image 1, the second - image 2, etc. Is that possible? Will references (added through cross reference feature) to those objects be updated?

    Read the article

  • Is there a way to convert MS 2010 Equation to Object in MS Equation 3.0?

    - by Teodorescu
    I have a lot of equations (for faculty) written in MS Equation (button from right side) and saved it in .docx format. All good and the best until my professor told me that he has MS 2003 and I have to convert from docx to doc format and the equations must be editable. I don't have enough time to rewrite all the equations in MS Equation 3.0. Is there a way to convert from MS Equation to MS Equation 3.0 Object to be recognized and editable in Word 2003?

    Read the article

  • Excel transpose via paste

    - by David Oneill
    I want to transpose data in Excel. Normally, I cut the cells I need, and use paste special - transpose. However, sometimes when I do paste special, a box comes up asking me if I want to use unicode text vs normal text. How do I transpose this text? Is there a way to get past the unicode dialog box and get to the normal Paste special dialog box (that has the 'transpose' option)? Or, is there another simple way to transpose cells? transpose = flip rows and columns IE 1, 2, 3 becomes: 1 2 3

    Read the article

  • Excel VBA Function runtime error 1004: Application-defined or object-defined error

    - by music2myear
    I'm trying to learn functions for the purpose of simplifying and reusing code whenever necessary. I began by turning something I use pretty often into a function: Returning the integer value of the last non-blank row in a spreadsheet. Function FindLastDataLine(strColName As String) As Long FindLastDataLine = Range(strColName).Offset(Rows.Count - 1, 0).End(xlUp).Row End Function Sub PracticeMacro() intItemCount = FindLastDataLine("A:A") MsgBox ("There are " & intItemCount & " rows of data in column A.") End Sub When I run this I recieve the runtime error '1004' "Application-defined or object-defined error" which Help helpfully defines as "someone else's fault" to quote not quite verbatim. Where might I be going wrong?

    Read the article

  • Excel 2010: Copy row conditionaly

    - by TimothyHeyden
    I've searched for a similar question here, but haven't been able to find something that answers my issue. I'm a mediocre user of Excel 2010 with no experience in macro's. I have a dataset where each row represents a data entry. Let's say each row can be for each of its values (the columns) the maximum or minimum of the entire dataset. How can I create a row at the top where the, for instance, maximum row is shown dynamicly? So when extra data is added to the bottom of the dataset, the new maximum (if applicable) is shown in that row at the top. Thank you in advance!

    Read the article

  • Highlighting duplicate column-pair and counting the rows Excel

    - by pleasehelpme
    Given the data below, the column-pair with the same values for at least 4 consecutive rows should be highlighted. image here for better visualization: http://i49.tinypic.com/2jeshtt.jpg 2 2 3 4 3 4 3 4 3 4 2 3 1 2 2 2 3 3 3 3 3 3 3 3 2 3 2 3 2 3 2 3 2 2 3 4 3 4 3 4 3 4 3 4 The output should be something like this, where the column-pair values that are the same for at least 4 consecutive rows are highlighted. image here for better visualization: http://i48.tinypic.com/i2lzc8.jpg 2 2 3 4 3 4 3 4 3 4 2 3 1 2 2 2 3 3 3 3 3 3 3 3 2 3 2 3 2 3 2 3 2 2 3 4 3 4 3 4 3 4 3 4 Then, I need to know the number of instances of the N-consecutive equal column-pair. Considering the data above, N=4 should be 3 and N=5 should be 1, where N is the number of rows that the column-pair is consecutively equal.

    Read the article

  • Preventing folders from being moved in Outlook folder list

    - by ipaulo
    In the Outlook "folder list", it is quite easy to accidentally pickup a folder and move that into another folder. There is no undo for this, and I have not found a way to prevent this. I thought it was just me, but I recently saw a coworker do the same thing while filing mail via drag and drop. We are using Exchange 2003 and Outlook 2007.

    Read the article

  • Find a Certain Cell based on other Cells in Excel/Calc

    - by user77325
    I have a spreadsheet: Beans B-kg Chips C-kg 1.4oz/12 0.47544 6.5oz/20 3.679 1.48oz/12 0.502608 7oz/12 2.3772 1.86oz/12 0.631656 8oz/20 4.528 and a second sheet: Category Name Case Kg Beans 1.4oz/12 ? Beans 1.48oz/12 ? Chips 6.5oz/20 ? I am trying to match the type of product with the correct weight. So I need a formula that will choose the correct column based on the Category and then choose the correct row based on the name and output the result next to it.

    Read the article

  • Is there a way to sort digits within a cell?

    - by Iszi
    I'd like to know if there's an Excel Function, or a formula, that can be used to sort digits within a cell. For example, if the value of A1 is 6193254807 and B1 has our formula with parameters set to sort ascending then B1 should equal 0123456789 (leading zero included). Of course, if the parameters were set so that it would sort descending then B1 should equal 9876543210. Is there a way to do this, without wandering into VBScript, or macros, or something similarly exotic?

    Read the article

  • Data Validation of a Comma Delimited List

    - by Brad
    I need a simple way of taking a comma seperated list in a cell, and providing a drop down box to select one of them. For Example, the cell could contain: 24, 32, 40, 48, 56, 64 And in a further cell, using Data Validation, I want to provide a drop-down list to select ONE of those values I need to do this without VBA or Macros please. Apolgies, I want this to work with Excel 2010 and later. I have been playing around with counting the number of commas in the list and then trying to split this into a number of rows of single numbers etc with no joy yet.

    Read the article

  • Pivot Table grand total across columns

    - by Jon
    I'm using Excel 2010 and Power Pivot. I'm trying to calculate confidence and velocity for a development team. I'm extracting some information from our time and defect system each day and building a data set. What I need to do with Excel is do the calculations. So each day I add to my data set 1 row per task in the current project, estimate for that task and the time spent on that task. What I want to calculate is the estimate/actual for each task but also for each person. The trouble is that each day the actual is cumulative so I need to pick out the maximum value for each task. The estimate should remain unchanged. I can make this work at the task level with a calculated measure (=MAX(worked)/MAX(estimate)) but I don't know how to total this up for a person. I need the sum of the max worked for each task. So a dataset might look like: Name Task Estimate Worked N1 T1 3 1 N2 T2 3 1 N3 T3 4 1 N1 T1 3 2 N2 T4 5 1 N3 T3 4 2 N1 T5 1 2 N2 T6 2 3 N3 T7 3 2 What I want to see is for task T1 2 days were worked against an estimate of 3 days - so 2/3. For person N1 I want to see that they worked a total of 4 days against an estimate of 4 days so 4/4. For person N2 they worked 5 days for an estimate of 10 days. Any ideas on how I can achieve this?

    Read the article

< Previous Page | 161 162 163 164 165 166 167 168 169 170 171 172  | Next Page >