Search Results

Search found 26835 results on 1074 pages for 'microsoft ui automation'.

Page 249/1074 | < Previous Page | 245 246 247 248 249 250 251 252 253 254 255 256  | Next Page >

  • Best way to export powerpoint slides into pngs with different resoltuions?

    - by Henrik
    I am trying to convert powerpoint slides into a png. I know that there are several ways that allow to do this by allowing for changing the resolution (e.g., within powerpoint by changing the registry, or using pdf printers as proposed here and here). However, always changing the registry is cumbersome and using the pdf printer (bullzip printer and pdfforge) is not working as expected. Does anyone know of easy, free and reliable way to export powerpoint (2010) slides into png pictures while allowing to easily change the resoltuion?

    Read the article

  • How to copy paste images from / to OneNote web app from / to local PC?

    - by colinfang
    Does OneNote web app support paste image from clipboard (with ctrl+v)? I can manage to copy an image from web and directly paste into OneNote, but I cannot copy from my PC, and paste into OneNote. So, I tried copying an image from web and paste into desktop Word, and paste the image from Word but failing to paste into OneNote web app. Also, how can I copy an image from OneNote web app and paste into my desktop Word, or anywhere? It seems only paste a link to https://onenote.officeapps.live.com/o/GetImage.ashx?Fi=SD.....

    Read the article

  • IPv6 Addresses causing Exchange Relay whitelists to fail

    - by makerofthings7
    Several of our new Exchange servers are failing to relay messages because it is communicating over IPv6 and not matching any receive connector I previously set up. I'm not sure how we are using IP6 since we only have a IPv4 network and we are routing across subnets. I discovered this by typing helo in from the source to the server that is confused by my IP6 address. I saw the IPv6 message and the custom message I gave this receive connector. (connectors with more permission have a different helo) 220 HUB01 client helo asdf 250 HUB01.nfp.com Hello [fe80::cd8:6087:7b1e:99d4%11] More info about my environment: I have two dedicated Exchange forests each with a distinct purpose. They have no trust and only communicate by SMTP. They both share the same DNS infrastructure via stub zones. What are my options? This is my guess, but I'm no IPv6 expert so I don't know which one is the best option Disable IPv6 Add the IPv6 address to the whitelist (isn't that IP dynamic?) Tell Exchange to use IPv4 instead Figure out why we are using IPv6 instead of IP4

    Read the article

  • Positive result, negative result and current balance. How do you make starting balance show current result?

    - by Tine
    I have 3 columns. Column A shows positive result and if the result is negative then it is in a column B. Column B shows negative result and if the result is positive then it is in a column A. (meaning that either columns can have 0.00 in the cell (empty zero cells)). Column C has starting assets and it also shows the current balance that while result A or B are adding up and current balance is showing the current result. What is the proper formula for this I hope I was clear with my problem. Please help. Thanks in advance!

    Read the article

  • Virtual Server 2005 R2 kungfu

    - by AngryHacker
    Does Virtual Server 2005 R2 have a command line interface, that's versatile enough? Here is a situation. I run a Win2k VM on an old memory constrained machine. I allocate it 378MB of RAM and the VM runs just fine. Once a month, inside the VM, I backup the (a very large) database, compress it using 7Zip and ftp it to the backup site (all in a script). Unfortunately the compression part takes a massive amount of RAM (far exceeding the 378MB), it goes for the paging file and brings absolutely everything to a crawl and literally takes 2-3 days, if left unattended. So to fix this, I have to shutdown the VM, give it temporarily 768MB of RAM and then the whole thing finishes in 20 minutes. So, is there a way do the following automatically from the host machine in a script? Shutdown the guest OS (I think, I got this part) Change the RAM allocation from 378 to 768 Start the guest OS again then, 1 hour later, do everything in reverse.

    Read the article

  • Outlook / Gmail 'too many simultaneous connections' error

    - by sam
    I'm just setting up Outlook for Mac, and I'm trying to add a Google Apps application for business email (Gmail). I've set it up correctly (same details worked in Mac mail). But I keep getting two errors, either or just a error asking for the username and password again. Just to confirm the user name and password are correct, although when I go into menu command Tools - Account and look in the password field for that account it's blank. But if I just click cancel on the popup asking for my username password it just continues to get mail in the background for about 30 seconds, before again asking again for the password, or showing the above error which I can click 'yes' to and again it will get the mail. But after 30 seconds it does the same thing. I've got two other accounts set up fine, one a horde account (hosted webmail using POP3) and the other a iCloud .me account running on IMAP. What might be causing this and how I can remedy it? A bit more background: the machine is a MacBook Pro running Mac OS X v10.7 (Lion). Update 2013-11-02 I've updated Outlook to SP3, but I still get the same error.

    Read the article

  • ms access template where to find the vb code

    - by tintincutes
    I'm very new to this ms access 2007. I have a copy of a charitable contribution template charitablecontributions.accdb. I would like to know where I can find the code of it? I opened it by holding down the shift button and double click on it and it will open to a normal ms access where you can modify the table and so. But when I just click the file: charitablecontributions.accdb it will open to a formular view where the ribbon bars are gone. I wanted to know how, how is it possible to have this formular view? Because I have a Test.mdb from 2003 and I also would like it to be open like the formular view of charitablecontributions.accdb. I'll appreciate your help. Thanks

    Read the article

  • Problems when pasting Outlook 2010 signature logo into message body

    - by Austin ''Danger'' Powers
    Whenever I paste my company logo into a message in Outlook 2010, I run into a variety of complications and anomalies. The dimensions of my original logo image are 315x174 (source image is a PNG file). I am scaling this image down in Photoshop CS6 to a variety of smaller sizes for testing my Outlook signature (300x166, 250x138, 200x110,150x83 and 100x55 pixels). 300x166 = no distortion. This looks the same as in Photoshop (but far too large to use in my signature). 250x130 = distorted (gets stretched much wider by Outlook when pasting into message body). 200x110 = looks reasonable, but seems to have been scaled to a different size (smaller) by Outlook for no obvious reason. 150x83 = for some reason, this is scaled by Outlook to the exact same size that 200x110 was scaled to. In fact, a large range of similar dimensions are scaled to the exact same image size by Outlook. This is very frustrating. Why is this happening and what can be done to prevent it? 100x55 = when pasting my logo from Photoshop to Outlook with these dimensions all that happens is the cursor jumps forwards about an inch on the screen, leaving a blank space where the image was supposed to go. Any advice would be much appreciated.

    Read the article

  • Excel transpose via paste

    - by David Oneill
    I want to transpose data in Excel. Normally, I cut the cells I need, and use paste special - transpose. However, sometimes when I do paste special, a box comes up asking me if I want to use unicode text vs normal text. How do I transpose this text? Is there a way to get past the unicode dialog box and get to the normal Paste special dialog box (that has the 'transpose' option)? Or, is there another simple way to transpose cells? transpose = flip rows and columns IE 1, 2, 3 becomes: 1 2 3

    Read the article

  • Excel 2007 How To Reference A Seperate Cell In WS1 From A Common Cell In WS2

    - by Bob Sampson
    I have a simple file with two worksheets in. In the first worksheet (a product list) are a number of columns, including Product Code and Product Description. In the second worksheet (dispatches in January), I have Product Code. I need to insert a new column with the associated Product Description field completed based on the relevant line from the first worksheet. I'm sure this is very easy, but its not something I've done before. Thank you

    Read the article

  • clear contents from matched column of data in another sheet

    - by Peta
    I have a column of email addresses on sheet 2 col A (but I could put them on sheet 1 if it would make it easier / faster) that I want to remove from sheet 1 col D if matched (there may be 2 or more occurences of the same email to be removed/cleared). (1000s of rows in each sheet). After all day searching forums I’m getting more confused & can't find what I'm looking for. Not sure whether to use .match or .find & .ClearContents & the syntax for iterating through. Thanks very much in anticipation Peta

    Read the article

  • Cannot view dates of emails(no date field), in my CSV file exported from MS Outlook

    - by barlop
    I am using Outlook 2010 - I have my emails showing in there. and exported my emails, into a csv file. (file..options..advanced...export..export to a file.. I have opened that csv file in excel Here is a list of the fields it shows. I see "Date" doesn't appear among them. Subject Body From: (Name) From: (Address) From: (Type) To: (Name) To: (Address) To: (Type) CC: (Name) CC: (Address) CC: (Type) BCC: (Name) BCC: (Address) BCC: (Type) Billing Information Categories Importance Mileage Sensitivity Any idea why "Date" isn't included, and how to include it? Also, (and less importantly, and as a very secondary issue) is there a convenient way to read the csv file? reading an email with a long body, in excel, is not convenient, I need to select all of the body from the cell and copy/paste it into notepad.

    Read the article

  • Data Validation of a Comma Delimited List

    - by Brad
    I need a simple way of taking a comma seperated list in a cell, and providing a drop down box to select one of them. For Example, the cell could contain: 24, 32, 40, 48, 56, 64 And in a further cell, using Data Validation, I want to provide a drop-down list to select ONE of those values I need to do this without VBA or Macros please. Apolgies, I want this to work with Excel 2010 and later. I have been playing around with counting the number of commas in the list and then trying to split this into a number of rows of single numbers etc with no joy yet.

    Read the article

  • Access 2007: How can I make this EXPRESSION less complex?

    - by Mike
    Access is telling me that my new expression is to complex. It used to work when we had 10 service levels, but now we have 19! Great! My expression is checking the COST of our services in the [PriceCharged] field and then assigning the appropriate HOURS [Servicelevel] when I perform a calculation to work out how much REVENUE each colleague has made when working for a client. The [EstimatedTime] field stores the actual hours each colleague has worked. [EstimatedTime]/[ServiceLevel]*[PriceCharged] Great. Below is the breakdown of my COST to HOURS expression. I've put them on different lines to make it easier to read - please do not be put off by the length of this post, it's all the same info in the end. Many thanks,Mike ServiceLevel: IIf([pricecharged]=100(COST),6(HOURS), IIf([pricecharged]=200 Or [pricecharged]=210,12.5, IIf([pricecharged]=300,19, IIf([pricecharged]=400 Or [pricecharged]=410,25, IIf([pricecharged]=500,31, IIf([pricecharged]=600,37.5, IIf([pricecharged]=700,43, IIf([pricecharged]=800 Or [pricecharged]=810,50, IIf([pricecharged]=900,56, IIf([pricecharged]=1000,62.5, IIf([pricecharged]=1100,69, IIf([pricecharged]=1200 Or [pricecharged]=1210,75, IIf([pricecharged]=1300 Or [pricecharged]=1310,100, IIf([pricecharged]=1400,125, IIf([pricecharged]=1500,150, IIf([pricecharged]=1600,175, IIf([pricecharged]=1700,200, IIf([pricecharged]=1800,225, IIf([pricecharged]=1900,250,0)))))))))))))))))))

    Read the article

  • How do I stop track changes from turning on automatically in Word 2007

    - by Benj
    Whenever I open an existing document in Word 2007 (on Windows XP), word turns on track changes, and changes the display mode to "Final" (that is, not "Final Showing Markup" -- so I often don't even notice track changes is on if I don't remember to pay attention. This happens for ALL existing documents, and doesn't happen for new documents. I can't find any option in the configuration that would control this behavior. I would like to restore the original/default behavior where documents are opening with Track Changes off, and in "Final showing markup" display. Steps to Reproduce Open Word 2007. Create a new document. Verify that track changes is off. Save the document and close Word. Open the document (either directly or through Word). Track changes is now on. Any ideas?

    Read the article

  • Data capture from other sheet into Summary sheet

    - by Hemant
    an Excel workbook which has Summary sheet, Pending and Master Sheet. My requirement is below and try to develop a Macro or VB logic for excel • I want to control this workbook from Summary sheet. o Generate Fault Summary – ? I have set logic but if doesn’t give warning if sheet name is exists , so need to add this logic . ? When we press the Fault Report Summary command button then it copy the master sheet with cell “A6” Name and will hide the Master sheet. Again when you select the another Month name then it will generate the sheet for that month name. o Generate Toll System Uptime ? When I select the sheet name and “Week” then Press the “Enter “Command button then it should get the result from that sheet number . Each sheet number has Month detail in B2 Cell. ? To calculate the Uptime formula for Week wise is • Week-01 = (1680-SUMIFS(L5:L23,B5:B23,"="&B2,B5:B23,"<="&(B2+6)))/1680 • Week-02 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+7),B5:B23,"<="&(B2+13)))/1680 • Week-03 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+14),B5:B23,"<="&(B2+20)))/1680 • Week-04 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+21),B5:B23,"<="&(B2+27)))/1680 • Month =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2),B5:B23,"<="&(DATE(YEAR(B2),1+MONTH(B2),1)-1)))/1680 ? Result should reflect in Summary sheet at B18 cell . o Pending Fault Report Summary ? When segregate the report on its status like which one is open or Close . It is open then it is Pending Fault Report and when it is Close status it means it is closed. ? If any fault which has OPEN status in all sheets(Jan-13,Feb-13,Mar-13….etc) then it should be come as well as in Pending Sheet which ascending date order. ? When it’s status is changed then it should be moved in that month sheet or nearby fault created date. It status is close then it should not be available in pending sheet as it’s status is Closed. ? Each fault has Reported date and we monitor all fault according reported date. ? When we press the Update Fault Report Summary command button then it should update as above logic. ? Some time we export the Pending fault report , so date calendar should be present in Start and End date to Choose the date. When we press the Export command line then it should export the Pending fault report and able to save in Excel,PDF.

    Read the article

  • How to make project auto-estimate duration based on work?

    - by Bruno Brant
    This one has bothered me for a long while. I like to do estimates thinking on how much time a certain task will take (I'm in TI business), so, let's say, it takes 12 hours to build a program. Now, let's say I tell Project that my beginning date is today. If I allocate one resource to this task, it means that the task will last 1,5 days, implying that it will end tomorrow. But right now, that is not what it's doing. I say that the task will take 1 hour, and when I add a resource to it, it allocate the resource at [13%] basis, which means that the duration is still fixed... project is trying to make the task last for a day. I have, on many occasions, accomplished this. What I do is build a plan based on these rough estimates for effort, then I allocate tasks to resources. Times conflict, so I level resources and then Project magically tells me how long, in days, will it take. But every time I have to start estimating again, I end up having trouble on how to make project work like that.

    Read the article

  • How to fore Word to recompute image numbers?

    - by Vojtech Ruzicka
    I have a word document containing images and tables. These have captions which are numbered, like "Image 1-Example of something". Later on I decided to rearrange some of chapters of my document. However numbering of objects remained the same, so the first image is image 8, the second is image 3, etc. I want to force Word to recompute image numbering so first image in document would be image 1, the second - image 2, etc. Is that possible? Will references (added through cross reference feature) to those objects be updated?

    Read the article

  • How do I create a dynamic formula on Excel?

    - by Mario Marinato -br-
    On Excel, I have a DDE formula on B1 which reads =server|info!someText.data I want to change the formula so that someText is written on A1 and then reference it on the DDE formula. Something like =server|info!A1.data. I have tried to concatenate "A1" directly on the formula, as it is above, with no success. Some other things I tried were =server|info!A1&".data" and =server|info!indirect(A1)&".data", but had no success. Is there a way to achieve this? How?

    Read the article

  • Vacation scheduler/viewer

    - by Norfeldt
    I'm looking for a solution that allows multiple persons to put plan and notify their vacation by putting it in their electronic calendar and invite a dedicated "robot" email. On the other side I should be able to get a quick overview of the vacation for each person and do a print out that allows me to put it on a board. Example: John puts his winter vacation for week 7 into his calendar and invite [email protected]. Ben does the same thing for week 4 and 5 and invites [email protected]. Dilbert host the [email protected] and prints out and overview for the next 3 months. Each person's vacation is either stated by name or/and color on the print out. I would like to do the thing with standard business software like Outlook 2010 without installing too many softwares. But at the same time it should be easy and quick to make the print outs without too much fiddling Am I dreaming ?

    Read the article

  • Specifying Multiplicity in a Visio Database (ERD) Diagram

    - by Nitrodist
    Is there a way to manually edit the cardinality/multiplicity symbols on the end of a database ERD made in Visio? The category I'm using is in Visio 2003 under Database -> Database Model Diagram I want to be able to go from something like this: To this: The second graphic was done by manually adding the numbers, but I would prefer to just do it in Visio. Is there any way of accomplishing this?

    Read the article

  • Add Excel column without breaking equation

    - by CRAIG
    I have completed a very complex Excel spreadsheet with a lot of equations, except ... I forgot to include September I have Jan through Dec, all the months, except the calculations for September. Of course all the equations are currently perfect for the data that's here. How do I add a whole new column without ruining the previous equations? PS: tomorrow is my holidays and I have to go to work to finish this table, so bad

    Read the article

  • Labels mail merge repeats on subsequent pages?

    - by leeand00
    I'm trying to do a mail merge to print to labels. The first field in the document does not contain a { NEXT } field code, and because of this the records repeat between label pages for example: Notice how the records shift to the left as the next page is displayed? But how they start over again in an off by one manner? Now I've tried to fix this by using the first record displayed on a page to see if the page number is 1. If it not on page 1 of the mail merge then it should just move to the next record; otherwise it should just display the first record: This doesn't work however, because when I do the preview and display the {page} field code, it reports that I am always on page 1 and thus the same behavior continues instead of just moving to the next record on the next page.

    Read the article

  • How can I read password protected Word files on OS X ?

    - by Ohad
    I receive Word documents by mail and read them using the built-in Gmail reader. Sometimes the documents are password protected and I need to obtain access to a Windows machine with Office installed in order to read them. Is there a quicker / less hassle requiring method ? I don't want to have to install Vmware / Parallels nor Office on my fresh and sterile macbook.

    Read the article

< Previous Page | 245 246 247 248 249 250 251 252 253 254 255 256  | Next Page >