Search Results

Search found 11541 results on 462 pages for 'personal projects'.

Page 418/462 | < Previous Page | 414 415 416 417 418 419 420 421 422 423 424 425  | Next Page >

  • SQL SERVER – ASYNC_IO_COMPLETION – Wait Type – Day 11 of 28

    - by pinaldave
    For any good system three things are vital: CPU, Memory and IO (disk). Among these three, IO is the most crucial factor of SQL Server. Looking at real-world cases, I do not see IT people upgrading CPU and Memory frequently. However, the disk is often upgraded for either improving the space, speed or throughput. Today we will look at another IO-related wait type. From Book On-Line: Occurs when a task is waiting for I/Os to finish. ASYNC_IO_COMPLETION Explanation: Any tasks are waiting for I/O to finish. If by any means your application that’s connected to SQL Server is processing the data very slowly, this type of wait can occur. Several long-running database operations like BACKUP, CREATE DATABASE, ALTER DATABASE or other operations can also create this wait type. Reducing ASYNC_IO_COMPLETION wait: When it is an issue related to IO, one should check for the following things associated to IO subsystem: Look at the programming and see if there is any application code which processes the data slowly (like inefficient loop, etc.). Note that it should be re-written to avoid this  wait type. Proper placing of the files is very important. We should check the file system for proper placement of the files – LDF and MDF on separate drive, TempDB on another separate drive, hot spot tables on separate filegroup (and on separate disk), etc. Check the File Statistics and see if there is a higher IO Read and IO Write Stall SQL SERVER – Get File Statistics Using fn_virtualfilestats. Check event log and error log for any errors or warnings related to IO. If you are using SAN (Storage Area Network), check the throughput of the SAN system as well as configuration of the HBA Queue Depth. In one of my recent projects, the SAN was performing really badly and so the SAN administrator did not accept it. After some investigations, he agreed to change the HBA Queue Depth on the development setup (test environment). As soon as we changed the HBA Queue Depth to quite a higher value, there was a sudden big improvement in the performance. It is very likely to happen that there are no proper indexes on the system and yet there are lots of table scans and heap scans. Creating proper index can reduce the IO bandwidth considerably. If SQL Server can use appropriate cover index instead of clustered index, it can effectively reduce lots of CPU, Memory and IO (considering cover index has lesser columns than cluster table and all other; it depends upon the situation). You can refer to the following two articles I wrote that talk about how to optimize indexes: Create Missing Indexes Drop Unused Indexes Checking Memory Related Perfmon Counters SQLServer: Memory Manager\Memory Grants Pending (Consistent higher value than 0-2) SQLServer: Memory Manager\Memory Grants Outstanding (Consistent higher value, Benchmark) SQLServer: Buffer Manager\Buffer Hit Cache Ratio (Higher is better, greater than 90% for usually smooth running system) SQLServer: Buffer Manager\Page Life Expectancy (Consistent lower value than 300 seconds) Memory: Available Mbytes (Information only) Memory: Page Faults/sec (Benchmark only) Memory: Pages/sec (Benchmark only) Checking Disk Related Perfmon Counters Average Disk sec/Read (Consistent higher value than 4-8 millisecond is not good) Average Disk sec/Write (Consistent higher value than 4-8 millisecond is not good) Average Disk Read/Write Queue Length (Consistent higher value than benchmark is not good) Read all the post in the Wait Types and Queue series. Note: The information presented here is from my experience and there is no way that I claim it to be accurate. I suggest reading Book OnLine for further clarification. All the discussions of Wait Stats in this blog are generic and vary from system to system. It is recommended that you test this on a development server before implementing it to a production server. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: Pinal Dave, PostADay, SQL, SQL Authority, SQL Query, SQL Scripts, SQL Server, SQL Tips and Tricks, SQL Wait Stats, SQL Wait Types, T SQL, Technology

    Read the article

  • Changes in licence in forked project what are my rights?

    - by Wes
    Hi I'm intrested in using the apparently now defunct app-mdi libray in a flex application for a paying customer. http://sourceforge.net/projects/appmdi/ It appears that the app-mdi project has been forked from flex-mdi and indeed the code has so much in common it would appear almost identical to the origional code. Now in the original source flex-mdi the following licence appears in the source code /* Copyright (c) 2007 FlexMDI Contributors. See: http://code.google.com/p/flexmdi/wiki/ProjectContributors Permission is hereby granted, free of charge, to any person obtaining a copy of this software and associated documentation files (the "Software"), to deal in the Software without restriction, including without limitation the rights to use, copy, modify, merge, publish, distribute, sublicense, and/or sell copies of the Software, and to permit persons to whom the Software is furnished to do so, subject to the following conditions: The above copyright notice and this permission notice shall be included in all copies or substantial portions of the Software. THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE. */ However in the app-mdi library on the same file the following licence appears. Copyright (c) 2010, TRUEAGILE All rights reserved. Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. Neither the name of the TRUEAGILE nor the names of its contributors may be used to endorse or promote products derived from this software without specific prior written permission. THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT HOLDER OR CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. */ Now I've no problem with the licence except for the line. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. The copyright notice in its entireity makes no sense in binary material. Specifically talking about redistobutions in the binary form. Finally the question is what exactly has to be shown on web clients who access softare that utilises this library? Also is changing the licence in this manner actually allowed?

    Read the article

  • Developing an Implementation Plan with Iterations by Russ Pitts

    - by user535886
    Developing an Implementation Plan with Iterations by Russ Pitts  Ok, so you have come to grips with understanding that applying the iterative concept, as defined by OUM is simply breaking up the project effort you have estimated for each phase into one or more six week calendar duration blocks of work. Idea being the business user(s) or key recipient(s) of work product(s) being developed never go longer than six weeks without having some sort of review or prototyping of the work results for an iteration…”think-a-little”, “do-a-little”, and “show-a-little” in a six week or less timeframe…ideally the business user(s) or key recipients(s) are involved throughout. You also understand the OUM concept that you only plan for that which you have knowledge of. The concept further defined, a project plan initially is developed at a high-level, and becomes more detailed as project knowledge grows. Agreeing to this concept means you also have to admit to the fallacy that one can plan with precision beyond six weeks into a project…Anything beyond six weeks is a best guess in most cases when dealing with software implementation projects. Project planning, as defined by OUM begins with the Implementation Plan view, which is a very high-level perspective of the effort estimated for each of the five OUM phases, as well as the number of iterations within each phase. You might wonder how can you predict the number of iterations for each phase at this early point in the project. Remember project planning is not an exact science, and initially is high-level and abstract in nature, and then becomes more detailed and precise as the project proceeds. So where do you start in defining iterations for each phase for a project? The following are three easy steps to initially define the number of iterations for each phase: Step 1 => Start with identifying the known factors… …Prior to starting a project you should know: · The agreed upon time-period for an iteration (e.g 6 weeks, or 4 weeks, or…) within a phase (recommend keeping iteration time-period consistent within a phase, if not for the entire project) · The number of resources available for the project · The number of total number of man-day (effort) you have estimated for each of the five OUM phases of the project · The number of work days for a week Step 2 => Calculate the man-days of effort required for an iteration within a phase… Lets assume for the sake of this example there are 10 project resources, and you have estimated 2,536 man-days of work effort which will need to occur for the elaboration phase of the project. Let’s also assume a week for this project is defined as 5 business days, and that each iteration in the elaboration phase will last a calendar duration of 6 weeks. A simple calculation is performed to calculate the daily burn rate for a single iteration, which produces a result of… ((Number of resources * days per week) * duration of iteration) = Number of days required per iteration ((10 resources * 5 days/week) * 6 weeks) = 300 man days of effort required per iteration Step 3 => Calculate the number of iterations that can occur within a phase Next calculate the number of iterations that can occur for the amount of man-days of effort estimated for the phase being considered… (number of man-days of effort estimated / number of man-days required per iteration) = # of iterations for phase (2,536 man-days of estimated effort for phase / 300 man days of effort required per iteration) = 8.45 iterations, which should be rounded to a whole number such as 9 iterations* *Note - It is important to note this is an approximate calculation, not an exact science. This particular example is a simple one, which assumes all resources are utilized throughout the phase, including tech resources, etc. (rounding down or up to a whole number based on project factor considerations). It is also best in many cases to round up to higher number, as this provides some calendar scheduling contingency.

    Read the article

  • Save the Date - Oracle Partner Community Forum: Exadata, Exalogic and Manageability, Vienna, 23-24 April 2013

    - by Javier Puerta
    Hardware and Software Engineered to Work Together .Ritu { font-family: Arial, Helvetica, sans-serif; } .Ritu { font-family: Arial, Helvetica, sans-serif; } .Ritu { font-family: Arial, Helvetica, sans-serif; } body,td,th { font-family: Arial, Helvetica, sans-serif; font-size: x-small; } .color { color: #F00; } .c { color: #F00; } .c { color: #F00; } .c { color: #000; font-size: xx-small; } .c a { color: #F00; } .c { color: #F00; } .cl { color: #F00; } .b { color: #000; font-size: xx-small; } .i { font-style: italic; } .i { font-style: italic; } .i { font-style: italic; } .i { font-style: italic; } .i { font-style: italic; } .c { color: #F00; font-size: small; } .b { font-weight: bold; font-size: x-small; } .c { color: #F00; font-size: x-small; } .clr { color: #F00; } .c { color: #F00; } inside the Click Here The order you must follow to make the colored link appear in browsers. If not the default window link will appear 1. Select the word you want to use for the link 2. Select the desired color, Red, Black, etc 3. Select bold if necessary ___________________________________________________________________________________________________________________ Templates use two sizes of fonts and the sans-serif font tag for the email. All Fonts should be (Arial, Helvetica, sans-serif) tags Normal size reading body fonts should be set to the size of 2. Small font sizes should be set to 1 !!!!!!!DO NOT USE ANY OTHER SIZE FONT FOR THE EMAILS!!!!!!!! ___________________________________________________________________________________________________________________ -- Oracle PartnerNetwork | Account | Feedback SAVE THE DATE ORACLE PARTNER COMMUNITY FORUM: EXADATA, EXALOGIC AND MANAGEABILITY 23-24 APRIL 2013, VIENNA, AUSTRIA The 2013 event expands its scope to cover all the building blocks of the Cloud infrastructure: Exadata, Exalogic and Manageability! Dear partner I am delighted to announce the 2013 edition of the Exadata, Exalogic and Manageability Partner Community Forum for EMEA partners which will take place in Vienna, Austria, on April 23-24, 2013. After the experience of last year where we ran a joint Exadata and Manageability event, we received requests from many of you to add also Exalogic to the scope of the forum, and this way to cover the complete infrastructure architecture on the Exa platform. The continued market adoption of Exadata and Exalogic is being paralleled by a growth in the rate of projects sold and implemented by partners. Sharing customer cases and best-practices presented by other partners constitutes the core of this event. If you want to present an experience of your company around Exadata, Exalogic or Manageability that can be a learning experience for other partners, we still have some slots in the agenda. (Please contact Javier Puerta if you want to present.) Attending the Community Forum you will also have the opportunity to get Oracle’s insight on new products and market trends. And, of course, interact with the Oracle executives responsible for the Exadata, Exalogic and Manageability business. The atmosphere of beautiful Vienna will be the scenario of the event. Detailed venue and hotel booking information will be sent to you in January. Don't miss out on attending this key event! Save the date now - 23 & 24 April 2013, and watch out for your formal invitation coming soon. Kind regards, Javier Puerta Core Technology Partner Programs, Oracle EMEA E-Mail: [email protected] Jürgen Kress SOA Partner Adoption Oracle EMEA E-Mail: [email protected] Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Contact PBC | Legal Notices and Terms of Use | Privacy Oracle Corporation - Worldwide Headquarters, 500 Oracle Parkway, OPL - E-mail Services, Redwood Shores, CA 94065, United States

    Read the article

  • Save the Date - Oracle Partner Community Forum: Exadata, Exalogic and Manageability, Vienna, 23-24 April 2013

    - by Javier Puerta
    Hardware and Software Engineered to Work Together .Ritu { font-family: Arial, Helvetica, sans-serif; } .Ritu { font-family: Arial, Helvetica, sans-serif; } .Ritu { font-family: Arial, Helvetica, sans-serif; } body,td,th { font-family: Arial, Helvetica, sans-serif; font-size: x-small; } .color { color: #F00; } .c { color: #F00; } .c { color: #F00; } .c { color: #000; font-size: xx-small; } .c a { color: #F00; } .c { color: #F00; } .cl { color: #F00; } .b { color: #000; font-size: xx-small; } .i { font-style: italic; } .i { font-style: italic; } .i { font-style: italic; } .i { font-style: italic; } .i { font-style: italic; } .c { color: #F00; font-size: small; } .b { font-weight: bold; font-size: x-small; } .c { color: #F00; font-size: x-small; } .clr { color: #F00; } .c { color: #F00; } inside the Click Here The order you must follow to make the colored link appear in browsers. If not the default window link will appear 1. Select the word you want to use for the link 2. Select the desired color, Red, Black, etc 3. Select bold if necessary ___________________________________________________________________________________________________________________ Templates use two sizes of fonts and the sans-serif font tag for the email. All Fonts should be (Arial, Helvetica, sans-serif) tags Normal size reading body fonts should be set to the size of 2. Small font sizes should be set to 1 !!!!!!!DO NOT USE ANY OTHER SIZE FONT FOR THE EMAILS!!!!!!!! ___________________________________________________________________________________________________________________ -- Oracle PartnerNetwork | Account | Feedback SAVE THE DATE ORACLE PARTNER COMMUNITY FORUM: EXADATA, EXALOGIC AND MANAGEABILITY 23-24 APRIL 2013, VIENNA, AUSTRIA The 2013 event expands its scope to cover all the building blocks of the Cloud infrastructure: Exadata, Exalogic and Manageability! Dear partner I am delighted to announce the 2013 edition of the Exadata, Exalogic and Manageability Partner Community Forum for EMEA partners which will take place in Vienna, Austria, on April 23-24, 2013. After the experience of last year where we ran a joint Exadata and Manageability event, we received requests from many of you to add also Exalogic to the scope of the forum, and this way to cover the complete infrastructure architecture on the Exa platform. The continued market adoption of Exadata and Exalogic is being paralleled by a growth in the rate of projects sold and implemented by partners. Sharing customer cases and best-practices presented by other partners constitutes the core of this event. If you want to present an experience of your company around Exadata, Exalogic or Manageability that can be a learning experience for other partners, we still have some slots in the agenda. (Please contact Javier Puerta if you want to present.) Attending the Community Forum you will also have the opportunity to get Oracle’s insight on new products and market trends. And, of course, interact with the Oracle executives responsible for the Exadata, Exalogic and Manageability business. The atmosphere of beautiful Vienna will be the scenario of the event. Detailed venue and hotel booking information will be sent to you in January. Don't miss out on attending this key event! Save the date now - 23 & 24 April 2013, and watch out for your formal invitation coming soon. Kind regards, Javier Puerta Core Technology Partner Programs, Oracle EMEA E-Mail: [email protected] Jürgen Kress SOA Partner Adoption Oracle EMEA E-Mail: [email protected] Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Contact PBC | Legal Notices and Terms of Use | Privacy Oracle Corporation - Worldwide Headquarters, 500 Oracle Parkway, OPL - E-mail Services, Redwood Shores, CA 94065, United States

    Read the article

  • The Java Community Process: What's Broken and How to Fix It

    - by Tori Wieldt
    In a panel discussion today at TheServerSide Java Symposium, Patrick Curran, Head of the Java Community Process, James Gosling, and ?Reza Rahman, member, Java EE 6 and EJB 3.1 expert groups, discussed the state of the JCP. Moderated by Cameron McKenzie, Editor of TheServerSide.com, they discussed what's wrong with JCP and ways to fix it.What's wrong with the JCP? Reza Rahman was quite supportive of the JCP. "I work as a consultant, and it's much better than getting a decision made a large company," Reza commented. He gave the JCP "Five stars" and explained that as an individual, he was able to have an impact on things that mattered to him. Cameron asked, "Now all these JCP problems came after Oracle acquired Sun, right?" To which the crowd had a good laugh, and the panel all agreed many of the JCP problems existed under Sun. How is the JCP handled differently under Oracle than Sun? "Pretty similar," said James. Oracle "tends more towards practicality" said Reza. "I'm glad to see things moving again, we've got several new JSRs filed," Patrick commented.How to Fix It?They all agreed greater transparency is a top issue. Without it, people assume sinister behavior whether it's there or not. Patrick said that currently spec leads are "encouraged" to be transparent, and the JCP office is planning to submit JSRs to change the JCP process so transparency is mandated, both for mailing lists and issue tracking. Shining a light on problems is the best way to fix them.Reza said the biggest problem is lack of a participation from the community. If more people are involved, a lot of the problems go away. "Developers are too non-chalant, they should realize what happens in the JCP has an direct impact on their career and they need to get involved." Reza commented.Got Involved!During Q&A, someone asked how a developer could get involved. They answered: Pick a JSR you are interested in and follow it. To start, you could read an article about the JSR and comment on the article (expert group members do read the comments). Or read the spec, discuss it with others and post a blog about it. Read the Expert Group proceedings. Join the JCP (free for individuals). Open source projects have code that you can download and play with, download it and provide feedback. Patrick mentioned that the JCP really wants more participation. "One way we are working on it is that we are encouraging JUGs to join the JCP as a group, and that makes all members of the JUG JCP members," Patrick said.They commented that most spec leads are desperate for feedback. "And, please get involved BEFORE the spec is finalized!" James declared. Someone from the audience said it's hard to put valuable time into something before it's baked. Patrick explained that Post Final Draft (PFD) is the time in the JCP process when the spec is mature enough to review but before the spec is finalized. The panel agreed the worst thing that could happen is that most people in the Java community just complain about the JCP without getting involved. Developer Sumit Goyal, conference attendee, thought it was a healthy discussion. "I got insights into how JSRs are worked on and finalized," he said.Key LinksThe Java Community Process Website  http://jcp.org/en/home/indexArticle: A Conversation with JCP Chair Patrick Curran Oracle Technology Network http://www.oracle.com/technetwork/java/index.htmlTheServerSide Java Symposium  http://javasymposium.techtarget.com/

    Read the article

  • SOA Community Newsletter June 2013

    - by JuergenKress
    Dear SOA partner community member Thanks for showing us your interest to rerun the Fusion Middleware Summer Camps! After knowing your suggestions we are happy to announce the 3rd edition of our advanced Fusion Middleware training. The camps will take place from August 26th - 30th 2013 in Lisbon Portugal. Topics will include Adaptive Case Management (ACM) as part of BPM Suite, b2b, Advanced SOA and SOA Governance. Please make sure you plan and book your seat in advance - (Booking is on the basis of first come first seat!). Thanks for all your efforts to become certified and Specialized. For all the experts who achieved the SOA Suite 11g Essentials or BPM Suite 11g Certified Implementation Specialist, you can download a logo for your blog or business card at the Competence Center. For all the companies who achieved a SOA or BPM specialization you can request a nice Plaques for your office. As part of our Industrial SOA article services we published “Canonizing a Language for Architecture” in the Service Technology Magazine and on Oracle Technology Network. If you write books or a blog - make sure you share it with us! Cloud Computing is the hottest topic in IT, specially as an architect you should be aware of the concepts and technology, therefore I highly recommend you Thomas Erl’s latest book named “Cloud Computing”. In the BPM space, Adaptive Case Management (ACM) is the hottest topic, with BPM PS6 the backend ACM functionality and an ACM sample application are available. You can even combine this hype with Customer Experience. The BPM section in this newsletter reflects the high importance of the topic and includes BPM PS6 video showing process lifecycle,BPM Resource Kit, Functional Testing, Introduction to Web Forms, Customized Workspace Application and Instance Patching Demo. B2B also become more and more popular in the Oracle SOA Suite. If you could not attend the training organized in the month May, we offer you an additional B2B training as a part of the Summer Camps or you can download the B2B training material from our SOA Community Workspace (SOA Community membership required). Thanks to all for sharing the valuable SOA content with our community! Special thanks to ec4u for the new reference of SOA Suite and AIA Foundation Pack at a Swiss insurance company. It is time to submit a SOA and BPM  reference request today! In this edition of the newsletter you will see Guido and Ronald's second part of OSB article series and Kathiravan Udayakumar's published an exclusive article on SOA Suite best practice. If you want to submit your content for the next edition of the Newsletter then please feel free to submit it to myself. The A-Team is an excellent contributor to the best practice - make sure you visit the new A-Team page and read their articles such as Getting to know Maven. Also on the SOA side, we have published many new articles from the community Oracle SOA Suite for the Busy IT Professional by Frank Munz, SOA Suite Knowledge - Polyglot Service Implementation with Groovy by Alexander Suchier, QA82 Analyzer - Automated Quality Assurance for Oracle SOA Suite Projects, Verifying the Target by Anthony Reynolds and a new book called Oracle SOA Governance 11g Implementation book by Luis Augusto Weir. Two new SOA on-demand training courses NEW - Oracle Business Rules Self-Study Course & Introduction Human Workflow online course are available now! Make use of the Summer Time and get trained - hope to see you in Lisbon for the Summer Camps! Jürgen Kress Oracle SOA & BPM Partner Adoption EMEA To read the newsletter please visit http://tinyurl.com/soanewsJune2013 (OPN Account required) To become a member of the SOA Partner Community please register at http://www.oracle.com/goto/emea/soa (OPN account required) If you need support with your account please contact the Oracle Partner Business Center. Blog Twitter LinkedIn Mix Forum Technorati Tags: SOA Community newsletter,SOA Community,Oracle,OPN,Jürgen Kress,SOA,BPM

    Read the article

  • Exploring packages in code

    In my previous post Searching for tasks with code you can see how to explore the control flow side of packages, drilling down through containers, task, and event handlers, but it didn’t cover the data flow. I recently saw a post on the MSDN forum asking how to edit an existing package programmatically, and the sticking point was how to find the the data flow and the components inside. This post builds on some of the previous code and shows how you can explore all objects inside a package. I took the sample Task Search application I’d written previously, and came up with a totally pointless little console application that just walks through the package and writes out the basic type and name of every object it finds, starting with the package itself e.g. Package – MyPackage . The sample package we used last time showed nested objects as well an event handler; a OnPreExecute event tucked away on the task SQL In FEL. The output of this sample tool would look like this: PackageObjects v1.0.0.0 (1.0.0.26627) Copyright (C) 2009 Konesans Ltd Processing File - Z:\Users\Darren Green\Documents\Visual Studio 2005\Projects\SSISTestProject\EventsAndContainersWithExe cSQLForSearch.dtsx Package - EventsAndContainersWithExecSQLForSearch For Loop - FOR Counter Loop Task - SQL In Counter Loop Sequence Container - SEQ For Each Loop Wrapper For Each Loop - FEL Simple Loop Task - SQL In FEL Task - SQL On Pre Execute for FEL SQL Task Sequence Container - SEQ Top Level Sequence Container - SEQ Nested Lvl 1 Sequence Container - SEQ Nested Lvl 2 Task - SQL In Nested Lvl 2 Task - SQL In Nested Lvl 1 #1 Task - SQL In Nested Lvl 1 #2 Connection Manager – LocalHost The code is very similar to what we had previously, but there are a couple of extra bits to deal with connections and to look more closely at a task and see if it is a Data Flow task. For connections your just examine the package's Connections collection as shown in the abridged snippets below. First you can see the call to the ProcessConnections method, followed by the method itself. // Load the package file Application application = new Application(); using (Package package = application.LoadPackage(filename, null)) { // Write out the package name Console.WriteLine("Package - {0}", package.Name); ... More ... // Look and the connections ProcessConnections(package.Connections); } private static void ProcessConnections(Connections connections) { foreach (ConnectionManager connectionManager in connections) { Console.WriteLine("Connection Manager - {0}", connectionManager.Name); } } What we didn’t see in the sample output above was anything to do with the Data Flow, but rest assured the code now handles it too. The following snippet shows how each task is examined to see if it is a Data Flow task, and if so we can then loop through all of the components inside the data flow. private static void ProcessTaskHost(TaskHost taskHost) { if (taskHost == null) { return; } Console.WriteLine("Task - {0}", taskHost.Name); // Check if the task is a Data Flow task MainPipe pipeline = taskHost.InnerObject as MainPipe; if (pipeline != null) { ProcessPipeline(pipeline); } } private static void ProcessPipeline(MainPipe pipeline) { foreach (IDTSComponentMetaData90 componentMetadata in pipeline.ComponentMetaDataCollection) { Console.WriteLine("Pipeline Component - {0}", componentMetadata.Name); // If you wish to make changes to the component then you should really use the managed wrapper. // CManagedComponentWrapper wrapper = componentMetadata.Instantiate(); // wrapper.SetComponentProperty("PropertyName", "Value"); } } Hopefully you can see how we get a reference to the Data Flow task, and then use the ComponentMetaDataCollection to find out what components we have inside the pipeline. If you wanted to know more about the component you could look at the ObjectType or ComponentClassID properties. After that it gets a bit harder and you should get a reference to the wrapper object as the comment suggest and start using the properties, just like you would in the create packages samples, see our Code Development category for some for these examples. Download Sample code project PackageObjects.zip (5KB)

    Read the article

  • Failure Sucks, But Does It Have To?

    - by steve.diamond
    Hey Folks--It's "elephant in the room" time. Imagine a representative from a CRM VENDOR discussing CRM FAILURES. Well. I recently saw this blog post from Michael Krigsman on "six ways CRM projects go wrong." Now, I know this may come off defensive, but my comments apply to ALL CRM vendors, not just Oracle. As I perused the list, I couldn't find any failures related to technology. They all seemed related to people or process. Now, this isn't about finger pointing, or impugning customers. I love customers! And when they fail, WE fail. Although I sit in the cheap seats, i.e., I haven't funded any multi-million dollar CRM initiatives lately, I kept wondering how to convert the perception of failure as something that ends and is never to be mentioned again (see Michael's reason #4), to something that one learns from and builds upon. So to continue my tradition of speaking in platitudes, let me propose the following three tenets: 1) Try and get ahead of your failures while they're very very small. 2) Immediately assess what you can learn from those failures. 3) With more than 15 years of CRM deployments, seek out those vendors that have a track record both in learning from "misses" and in supporting MANY THOUSANDS of CRM successes at companies of all types and sizes. Now let me digress briefly with an unpleasant (for me, anyway) analogy. I really don't like flying. Call it 'fear of dying' or 'fear of no control.' Whatever! I've spoken with quite a few commercial pilots over the years, and they reassure me that there are multiple failures on most every flight. We as passengers just don't know about them. Most of them are too miniscule to make a difference, and most of them are "caught" before they become LARGER failures. It's typically the mid-sized to colossal failures we hear about, and a significant percentage of those are due to human error. What's the point? I'd propose that organizations consider the topic of FAILURE in five grades. On one end, FAILURE Grade 1 is a minor/miniscule failure. On the other end, FAILURE Grade 5 is a colossal failure A Grade 1 CRM FAILURE could be that a particular interim milestone was missed. Why? What can we learn from that? How can we prevent that from happening as we proceed through the project? Individual organizations will need to define their own Grade 2 and Grade 3 failures. The opportunity is to keep those Grade 3 failures from escalating any further. Because honestly, a GRADE 5 failure may not be recoverable. It could result in a project being pulled, countless amounts of hours and dollars lost, and jobs lost. We don't want to go there. In closing, I want to thank Michael for opening my eyes up to the world of "color," versus thinking of failure as both "black and white" and a dead end road that organizations can't learn from and avoid discussing like the plague.

    Read the article

  • SPARC T5-8 Servers EMEA Acceleration Promotion for Partners

    - by mseika
    Dear all We are pleased to announce the EMEA T5-8 Acceleration Promotion, a price promotion that, for a limited time, makes the T5-8 server available to our EMEA partners at a very attractive discount. Why the SPARC T5-8 server Oracle's SPARC servers running Oracle Solaris are ideal for mission-critical applications requiring high performance, best-in-class availability, and unmatched scalability on all application tiers. SPARC servers include built-in virtualization, systems management, and security at no additional cost. Designed for applications that demand the highest performance and 24x7 availability. Oracle's SPARC T5-8 server is the fastest and the most advanced, scalable midrange server in the Oracle portfolio. The Oracle SPARC T5-8 server is in the sweet spot of the UNIX midrange, and directly competing with IBM P770(+) and P780(+) systems, with a 7x price advantage (see official Oracle press release) over a similarly configured P780 system! What are we offering Effective immediately, the fully-configured T5-8 server is available to VADs with a 38% discount off price list: this is 8 additional points on top of the standard 30% contractual discount. The promo will be communicated to VADs and VARs, and VADs are expected to pass the additional discount through to the VARs. Resellers will be encouraged to use this attractive price to position T5-8 versus the competition, accelerate T5-8 sales, and use the increased margin to offer additional services to their end users - thus expanding their footprint within their customers and making the T5-8 business proposition even more compelling. This is a unique opportunity for partners to expand their base and beat the competition with a 7x price advantage over a similarly configured IBM P780. This price promotion is only available to OPN Partners, and is valid until November 30, 2013. What's in it for Partners  More competitive price More customer budget available for more projects: attach migration services, training, ... Opportunity to attach Storage, and additional Software Higher win rate Additional Details The promotion is valid for the existing configurations of T5-8 with 8 CPU and different memory configurations, including all X-options that are part of the system and ordered at the same time. 8% additional discount to the VAD on full T5-8 - Including X-Options: Cat V (30% + 8% additional): System, CPU, Memory, Disks, Ethernet Cat U (22% + 8% additional): Infiniband HCA Cat W (30% + 8% additional): FC/SAS HBA / FCoE CNA Partner eligibilty criteria Standard requirements apply. Partners must: be an OPN member in good standing, at Gold level or above meet the Resale criteria in the SPARC T-Series servers Knowledge Zone have a right to distribute hardware via the Full Use Distribution Agreement, with Hardware Addendum if applicable. Order process The promotion is available until November 30, 2013. VADs place the order via Oracle Partner Store. A request for extra-discount has to be raised in advance using the standard process for available configs: input the configuration apply the suggested discounts submit the request in the request documentation, please refer to EMEA T5-8 FY14H1 Channel Promotion as approved in GDMT GT-EB2-Q413-107C This promotion is only valid for the T5-8 configurations stated in this announcement. Any change, or additional products / items not listed explicitly, can be ordered at the same time and will follow standard approval process. Key contacts Your local A&C organization For questions on EMEA Partner Programs for Servers: Giuseppe Facchetti For questions on the T5-8 product: Martin de Jong Best regards, Olivier Tordo Senior Director, Sales & Strategy, Hardware SolutionsEMEA Alliances & Channels Paul Flannery Senior Director, EMEA Servers Product Management

    Read the article

  • SPARC T5-8 Servers EMEA Acceleration Promotion for Partners

    - by mseika
    Dear all We are pleased to announce the EMEA T5-8 Acceleration Promotion, a price promotion that, for a limited time, makes the T5-8 server available to our EMEA partners at a very attractive discount. Why the SPARC T5-8 server Oracle's SPARC servers running Oracle Solaris are ideal for mission-critical applications requiring high performance, best-in-class availability, and unmatched scalability on all application tiers. SPARC servers include built-in virtualization, systems management, and security at no additional cost. Designed for applications that demand the highest performance and 24x7 availability. Oracle's SPARC T5-8 server is the fastest and the most advanced, scalable midrange server in the Oracle portfolio. The Oracle SPARC T5-8 server is in the sweet spot of the UNIX midrange, and directly competing with IBM P770(+) and P780(+) systems, with a 7x price advantage (see official Oracle press release) over a similarly configured P780 system! What are we offering Effective immediately, the fully-configured T5-8 server is available to VADs with a 38% discount off price list: this is 8 additional points on top of the standard 30% contractual discount. The promo will be communicated to VADs and VARs, and VADs are expected to pass the additional discount through to the VARs. Resellers will be encouraged to use this attractive price to position T5-8 versus the competition, accelerate T5-8 sales, and use the increased margin to offer additional services to their end users - thus expanding their footprint within their customers and making the T5-8 business proposition even more compelling. This is a unique opportunity for partners to expand their base and beat the competition with a 7x price advantage over a similarly configured IBM P780. This price promotion is only available to OPN Partners, and is valid until November 30, 2013. What's in it for Partners  More competitive price More customer budget available for more projects: attach migration services, training, ... Opportunity to attach Storage, and additional Software Higher win rate Additional Details The promotion is valid for the existing configurations of T5-8 with 8 CPU and different memory configurations, including all X-options that are part of the system and ordered at the same time. 8% additional discount to the VAD on full T5-8 - Including X-Options: Cat V (30% + 8% additional): System, CPU, Memory, Disks, Ethernet Cat U (22% + 8% additional): Infiniband HCA Cat W (30% + 8% additional): FC/SAS HBA / FCoE CNA Partner eligibilty criteria Standard requirements apply. Partners must: be an OPN member in good standing, at Gold level or above meet the Resale criteria in the SPARC T-Series servers Knowledge Zone have a right to distribute hardware via the Full Use Distribution Agreement, with Hardware Addendum if applicable. Order process The promotion is available until November 30, 2013. VADs place the order via Oracle Partner Store. A request for extra-discount has to be raised in advance using the standard process for available configs: input the configuration apply the suggested discounts submit the request in the request documentation, please refer to EMEA T5-8 FY14H1 Channel Promotion as approved in GDMT GT-EB2-Q413-107C This promotion is only valid for the T5-8 configurations stated in this announcement. Any change, or additional products / items not listed explicitly, can be ordered at the same time and will follow standard approval process. Key contacts Your local A&C organization For questions on EMEA Partner Programs for Servers: Giuseppe Facchetti For questions on the T5-8 product: Martin de Jong Best regards, Olivier Tordo Senior Director, Sales & Strategy, Hardware SolutionsEMEA Alliances & Channels Paul Flannery Senior Director, EMEA Servers Product Management

    Read the article

  • SPARC T5-8 Servers EMEA Acceleration Promotion for Partners

    - by mseika
    Dear all We are pleased to announce the EMEA T5-8 Acceleration Promotion, a price promotion that, for a limited time, makes the T5-8 server available to our EMEA partners at a very attractive discount. Why the SPARC T5-8 server Oracle's SPARC servers running Oracle Solaris are ideal for mission-critical applications requiring high performance, best-in-class availability, and unmatched scalability on all application tiers. SPARC servers include built-in virtualization, systems management, and security at no additional cost. Designed for applications that demand the highest performance and 24x7 availability. Oracle's SPARC T5-8 server is the fastest and the most advanced, scalable midrange server in the Oracle portfolio. The Oracle SPARC T5-8 server is in the sweet spot of the UNIX midrange, and directly competing with IBM P770(+) and P780(+) systems, with a 7x price advantage (see official Oracle press release) over a similarly configured P780 system! What are we offering Effective immediately, the fully-configured T5-8 server is available to VADs with a 38% discount off price list: this is 8 additional points on top of the standard 30% contractual discount. The promo will be communicated to VADs and VARs, and VADs are expected to pass the additional discount through to the VARs. Resellers will be encouraged to use this attractive price to position T5-8 versus the competition, accelerate T5-8 sales, and use the increased margin to offer additional services to their end users - thus expanding their footprint within their customers and making the T5-8 business proposition even more compelling. This is a unique opportunity for partners to expand their base and beat the competition with a 7x price advantage over a similarly configured IBM P780. This price promotion is only available to OPN Partners, and is valid until November 30, 2013. What's in it for Partners  More competitive price More customer budget available for more projects: attach migration services, training, ... Opportunity to attach Storage, and additional Software Higher win rate Additional Details The promotion is valid for the existing configurations of T5-8 with 8 CPU and different memory configurations, including all X-options that are part of the system and ordered at the same time. 8% additional discount to the VAD on full T5-8 - Including X-Options: Cat V (30% + 8% additional): System, CPU, Memory, Disks, Ethernet Cat U (22% + 8% additional): Infiniband HCA Cat W (30% + 8% additional): FC/SAS HBA / FCoE CNA Partner eligibilty criteria Standard requirements apply. Partners must: be an OPN member in good standing, at Gold level or above meet the Resale criteria in the SPARC T-Series servers Knowledge Zone have a right to distribute hardware via the Full Use Distribution Agreement, with Hardware Addendum if applicable. Order process The promotion is available until November 30, 2013. VADs place the order via Oracle Partner Store. A request for extra-discount has to be raised in advance using the standard process for available configs: input the configuration apply the suggested discounts submit the request in the request documentation, please refer to EMEA T5-8 FY14H1 Channel Promotion as approved in GDMT GT-EB2-Q413-107C This promotion is only valid for the T5-8 configurations stated in this announcement. Any change, or additional products / items not listed explicitly, can be ordered at the same time and will follow standard approval process. Key contacts Your local A&C organization For questions on EMEA Partner Programs for Servers: Giuseppe Facchetti For questions on the T5-8 product: Martin de Jong Best regards, Olivier Tordo Senior Director, Sales & Strategy, Hardware SolutionsEMEA Alliances & Channels Paul Flannery Senior Director, EMEA Servers Product Management

    Read the article

  • SPARC T5-8 Servers EMEA Acceleration Promotion for Partners

    - by mseika
    Dear all We are pleased to announce the EMEA T5-8 Acceleration Promotion, a price promotion that, for a limited time, makes the T5-8 server available to our EMEA partners at a very attractive discount. Why the SPARC T5-8 server Oracle's SPARC servers running Oracle Solaris are ideal for mission-critical applications requiring high performance, best-in-class availability, and unmatched scalability on all application tiers. SPARC servers include built-in virtualization, systems management, and security at no additional cost. Designed for applications that demand the highest performance and 24x7 availability. Oracle's SPARC T5-8 server is the fastest and the most advanced, scalable midrange server in the Oracle portfolio. The Oracle SPARC T5-8 server is in the sweet spot of the UNIX midrange, and directly competing with IBM P770(+) and P780(+) systems, with a 7x price advantage (see official Oracle press release) over a similarly configured P780 system! What are we offering Effective immediately, the fully-configured T5-8 server is available to VADs with a 38% discount off price list: this is 8 additional points on top of the standard 30% contractual discount. The promo will be communicated to VADs and VARs, and VADs are expected to pass the additional discount through to the VARs. Resellers will be encouraged to use this attractive price to position T5-8 versus the competition, accelerate T5-8 sales, and use the increased margin to offer additional services to their end users - thus expanding their footprint within their customers and making the T5-8 business proposition even more compelling. This is a unique opportunity for partners to expand their base and beat the competition with a 7x price advantage over a similarly configured IBM P780. This price promotion is only available to OPN Partners, and is valid until November 30, 2013. What's in it for Partners  More competitive price More customer budget available for more projects: attach migration services, training, ... Opportunity to attach Storage, and additional Software Higher win rate Additional Details The promotion is valid for the existing configurations of T5-8 with 8 CPU and different memory configurations, including all X-options that are part of the system and ordered at the same time. 8% additional discount to the VAD on full T5-8 - Including X-Options: Cat V (30% + 8% additional): System, CPU, Memory, Disks, Ethernet Cat U (22% + 8% additional): Infiniband HCA Cat W (30% + 8% additional): FC/SAS HBA / FCoE CNA Partner eligibilty criteria Standard requirements apply. Partners must: be an OPN member in good standing, at Gold level or above meet the Resale criteria in the SPARC T-Series servers Knowledge Zone have a right to distribute hardware via the Full Use Distribution Agreement, with Hardware Addendum if applicable. Order process The promotion is available until November 30, 2013. VADs place the order via Oracle Partner Store. A request for extra-discount has to be raised in advance using the standard process for available configs: input the configuration apply the suggested discounts submit the request in the request documentation, please refer to EMEA T5-8 FY14H1 Channel Promotion as approved in GDMT GT-EB2-Q413-107C This promotion is only valid for the T5-8 configurations stated in this announcement. Any change, or additional products / items not listed explicitly, can be ordered at the same time and will follow standard approval process. Key contacts Your local A&C organization For questions on EMEA Partner Programs for Servers: Giuseppe Facchetti For questions on the T5-8 product: Martin de Jong Best regards, Olivier Tordo Senior Director, Sales & Strategy, Hardware SolutionsEMEA Alliances & Channels Paul Flannery Senior Director, EMEA Servers Product Management

    Read the article

  • SQL SERVER – IO_COMPLETION – Wait Type – Day 10 of 28

    - by pinaldave
    For any good system three things are vital: CPU, Memory and IO (disk). Among these three, IO is the most crucial factor of SQL Server. Looking at real-world cases, I do not see IT people upgrading CPU and Memory frequently. However, the disk is often upgraded for either improving the space, speed or throughput. Today we will look at an IO-related wait types. From Book On-Line: Occurs while waiting for I/O operations to complete. This wait type generally represents non-data page I/Os. Data page I/O completion waits appear as PAGEIOLATCH_* waits. IO_COMPLETION Explanation: Any tasks are waiting for I/O to finish. This is a good indication that IO needs to be looked over here. Reducing IO_COMPLETION wait: When it is an issue concerning the IO, one should look at the following things related to IO subsystem: Proper placing of the files is very important. We should check the file system for proper placement of files – LDF and MDF on a separate drive, TempDB on another separate drive, hot spot tables on separate filegroup (and on separate disk),etc. Check the File Statistics and see if there is higher IO Read and IO Write Stall SQL SERVER – Get File Statistics Using fn_virtualfilestats. Check event log and error log for any errors or warnings related to IO. If you are using SAN (Storage Area Network), check the throughput of the SAN system as well as the configuration of the HBA Queue Depth. In one of my recent projects, the SAN was performing really badly so the SAN administrator did not accept it. After some investigations, he agreed to change the HBA Queue Depth on development (test environment) set up and as soon as we changed the HBA Queue Depth to quite a higher value, there was a sudden big improvement in the performance. It is very possible that there are no proper indexes in the system and there are lots of table scans and heap scans. Creating proper index can reduce the IO bandwidth considerably. If SQL Server can use appropriate cover index instead of clustered index, it can effectively reduce lots of CPU, Memory and IO (considering cover index has lesser columns than cluster table and all other; it depends upon the situation). You can refer to the two articles that I wrote; they are about how to optimize indexes: Create Missing Indexes Drop Unused Indexes Checking Memory Related Perfmon Counters SQLServer: Memory Manager\Memory Grants Pending (Consistent higher value than 0-2) SQLServer: Memory Manager\Memory Grants Outstanding (Consistent higher value, Benchmark) SQLServer: Buffer Manager\Buffer Hit Cache Ratio (Higher is better, greater than 90% for usually smooth running system) SQLServer: Buffer Manager\Page Life Expectancy (Consistent lower value than 300 seconds) Memory: Available Mbytes (Information only) Memory: Page Faults/sec (Benchmark only) Memory: Pages/sec (Benchmark only) Checking Disk Related Perfmon Counters Average Disk sec/Read (Consistent higher value than 4-8 millisecond is not good) Average Disk sec/Write (Consistent higher value than 4-8 millisecond is not good) Average Disk Read/Write Queue Length (Consistent higher value than benchmark is not good) Note: The information presented here is from my experience and there is no way that I claim it to be accurate. I suggest reading Book OnLine for further clarification. All the discussions of Wait Stats in this blog are generic and vary from system to system. It is recommended that you test this on a development server before implementing it to a production server. Reference: Pinal Dave (http://blog.SQLAuthority.com) Filed under: Pinal Dave, PostADay, SQL, SQL Authority, SQL Query, SQL Scripts, SQL Server, SQL Tips and Tricks, SQL Wait Types, SQL White Papers, T SQL, Technology

    Read the article

  • How to convert from amateur web app developer to professional web apper?

    - by Nilesh
    This is more of a practical question on web app development and deployment process. Here is some background information. I use PHP for server side scripting, javascript for client side. I use Netbeans and notepad++. I user Firefox and firebug for debugging and testing. The process I use is very amateurish, I code something in netbeans, something in notepad++ and since there is nothing to compile, I just refresh the firefox browser and test it. This is convenient and faster compared to the Java development enviornment where you would have to atleast compile and deploy the jar files before you could run them. I have been thinking of putting a formal process in my development and find it hard putting it together. There are so many things to do before you can deploy your final web app. I keep hearing jslint, compression, unit testing (selenium), Ant, YUI compressor etc but I am now looking for some steps that I can take to make me more organized. For e.g I use netbeans but don't use any projects within it. I directly update the files. I don't use any source control but use my Iomega backup that saves each save into a different version and at the end of the day I backup the dev directory to my Amazon s3 account. For me development environment is just a DEV directory, TEST is my intermediate stage and PROD is the final directory that gets pushed out to the server. But all these directories are in the same apache home. I have few php scripts that just copies the needed files into the production directory. Thats about it for my development approach. I know I am missing the following - Regression testing (manual or automated ??) - automated testing (selenium ??) - automated deployment (ANT ??) - source control (svn ??) - quality control (jslint ??) Can someone explain what are the missing steps and how to go about filling those steps in order to have more professional approach. I am looking for tools with example tutorials in streamlining the whole development to deployment stage. For me just getting a hang of database, server side and client side development all in synchronization was itself a huge accomplishment. And now I feel there is lot missing before you can produce quality web application. For e.g I see lot of mention about using automated testing but how to put in use with respect to javascript and php. How to use ANT for the deployment etc. Is this all too much for a single or two person development team? Is there a way to automate all the above so that I just keep coding in netbeans and then run a batch file that is configured once and run it everytime to produce the code in the production directory? Lot of these information is scattered on the web and here, if someone can guide I would be happy to consolidate here. Thank you for your patience :)

    Read the article

  • Running Multiple WebLogic and OSB Domains

    - by jeff.x.davies
    I have any number of OSB domain created on my machine at any point in time. For example, I have different domains for different version of Oracle Service Bus and Oracle SOA Suite. I also have different domains for different purposes. I have a demo domain and another domain for the projects in my blog. Starting with OSB 11g and the Apache Derby server, there is a small "gotcha" if you want to create multiple domains on a devevelopment machine. When you create a new domain for OSB 11g it will use the same database info for all databases and this will cause an error when starting the admin server of the second domain (the first domain doesn't have to be running for this error to occur). Here is an example of the error message in the server console: ####<Mar 8, 2011 2:58:48 PM PST> <Critical> <JTA> <jeff-laptop> <AdminServer> <[ACTIVE] ExecuteThread: '0' for queue: 'weblogic.kernel.Default (self-tuning)'> <<WLS Kernel>> <> <> <1299625128464> <BEA-110482> <A logging last resource failed during initialization. The server cannot boot unless all configured logging last resources (LLRs) initialize. Failing reason: weblogic.transaction.loggingresource.LoggingResourceException: java.sql.SQLException: JDBC LLR, table verify failed for table 'WL_LLR_ADMINSERVER', row 'JDBC LLR Domain//Server' record had unexpected value 'osb11gR1PS3//AdminServer' expected 'OSBCIM//AdminServer'*** ONLY the original domain and server that creates an LLR table may access it *** The solution is to create a database instance for each of your domains and this is very simple to do. After you create a domain using the Configuration Wizard, locate the wlsbjmsrpDataSource-jdbc.xml file that is found under the DOMAIN_HOME/config/jdbc directory. Near the top of the file you will see the following entry: <url>jdbc:derby://localhost:1527/osbexamples;create=true;ServerName=localhost;databaseName=osbexamples</url> You need to modify this entry with a different and unique database name. The easiest way to do this is to substiture the name of your domain. For example: <url>jdbc:derby://localhost:1527/mydomain;create=true;ServerName=localhost;databaseName=mydomain</url> will create a database named mydomain . Now, when you restart the admin server for the domain, it will create the new database for you. Do this for each domain you create on your development machine and you'll have no troubles. The process is much simpler if you are creating a domain using the Configuration Wizard. Simply name the database when you get to the Configure JDBC Component Schema step of the Configuration Wizard, select the OSB JMS Reporting Provider and set the name in the DBMS/Service field to whatever name you like, as shown in Figure 1 below. Figure 1 – Configuring the JDBC Component Schema That is all there is to it. Now you can create as many domains on your leptop or development machine as you like and not have to worry about them conflicting with each other.

    Read the article

  • PARTNER WEBCAST- ORACLE COMPETENCE - PROGRAM (COMPETENCE VIRTUAL)

    - by mseika
    I am pleased to invite you to join the second (Competence Virtual). In Competence - program we will present Oracle Applications' Product's new functions and features including sales positioning. The key objectives of these webcasts are to inspire System Integrator's implementation personnel to conduct successful after sales in their Customer projects. Competencewill be presented on 1st Monday of each quarter after the billable day (4:00 to 5:00 PM CET). The webcast is intended for System Integrator's Implementation Certified Specialists but Competence is open for other interested Oracle Applications system Integrator's personnel as well. At first, two Oracle representatives will discuss Oracle's contribution to Partners. Then you will see product breakout session followed by Q&A with Oracle Experts. Each session will last for maximum 1 hour. A Q&A Document covering all questions and answers will be made available two weeks after the webcast. What are the Benefits for Partners? Find out how Competence helps you to improve your after sales Discover new functions and features so you can enrich your Customer’s solution Learn more about Oracle Applications products, especially sales positioning Hear crucial questions raised by colleagues alike, learn from their interest Engage and present your questions to subject experts Be inspired of the richness of Oracle Applications portfolio – for your and your Customer’s benefit.   Note: Should you already be familiar with a specific Product, then choose another one. Doing so you would expand your knowledge of the overall Applications portfolio. Some presentations contain product demonstration, although these presentations are not intended to be extremely detailed technical presentations. Product breakout sessions:- Fusion CRM: Effective, Efficient and Easy- Fusion HCM: Talent management overview performance, goals, talent review- Distributed Order Management - Fusion SCM Solution- Oracle Transportation Management- Oracle Value Chain Planning: Demantra Sales & Operation Planning and Demantra Demand Management- Oracle CX (Customer Experience) - formerly CEM: Powering Great Customer Experiences- EPM 11.1.2.2 Overview- Oracle Hyperion Profitability and Cost Management, 11.1.2.1 For more details please visit and other breakout sessions on OPN page. Delivery FormatCompetence- program (Competence Virtual) is a series of FREE prerecorded Applications product presentations followed by Q&A. It will be delivered over the Web. Participants have the opportunity to submit questions during the cast via chat and subject matter experts will provide verbal answers live. Competence consists of several parallel prerecorded product breakout sessions, each lasting for max. 1 hour. At first, two Oracle representatives will discuss Oracle’s contribution to Partners. Then you’ll see the product breakout sessions followed by Q&A with Oracle Experts. A Q&A document covering all questions and answers will be made available two weeks after the webcast. You can also see Competence afterwards as its content will be available online for the next 6-12 months.The next Competence web casts will be presented as follows: June the 4th  2012 September the 3rd  2012 December the 3rd  2012 March the 4th  2013. Note: Depending on local network bandwidth please allow some seconds time the presentations to download. You might want to refresh your screen by pressing F5. DurationMaximum 1 hour For further information please contact me at [email protected]. Best regards Markku RouhiainenDirector, Applications Partner EnablementWestern Europe

    Read the article

  • PARTNER WEBCAST- ORACLE COMPETENCE - PROGRAM (COMPETENCE VIRTUAL)

    - by mseika
    I am pleased to invite you to join the second (Competence Virtual). In Competence - program we will present Oracle Applications' Product's new functions and features including sales positioning. The key objectives of these webcasts are to inspire System Integrator's implementation personnel to conduct successful after sales in their Customer projects. Competencewill be presented on 1st Monday of each quarter after the billable day (4:00 to 5:00 PM CET). The webcast is intended for System Integrator's Implementation Certified Specialists but Competence is open for other interested Oracle Applications system Integrator's personnel as well. At first, two Oracle representatives will discuss Oracle's contribution to Partners. Then you will see product breakout session followed by Q&A with Oracle Experts. Each session will last for maximum 1 hour. A Q&A Document covering all questions and answers will be made available two weeks after the webcast. What are the Benefits for Partners? Find out how Competence helps you to improve your after sales Discover new functions and features so you can enrich your Customer’s solution Learn more about Oracle Applications products, especially sales positioning Hear crucial questions raised by colleagues alike, learn from their interest Engage and present your questions to subject experts Be inspired of the richness of Oracle Applications portfolio – for your and your Customer’s benefit.   Note: Should you already be familiar with a specific Product, then choose another one. Doing so you would expand your knowledge of the overall Applications portfolio. Some presentations contain product demonstration, although these presentations are not intended to be extremely detailed technical presentations.   Product breakout sessions:- Fusion CRM: Effective, Efficient and Easy- Fusion HCM: Talent management overview performance, goals, talent review- Distributed Order Management - Fusion SCM Solution- Oracle Transportation Management- Oracle Value Chain Planning: Demantra Sales & Operation Planning and Demantra Demand Management- Oracle CX (Customer Experience) - formerly CEM: Powering Great Customer Experiences- EPM 11.1.2.2 Overview- Oracle Hyperion Profitability and Cost Management, 11.1.2.1 For more details please visit and other breakout sessions on OPN page. Delivery FormatCompetence- program (Competence Virtual) is a series of FREE prerecorded Applications product presentations followed by Q&A. It will be delivered over the Web. Participants have the opportunity to submit questions during the cast via chat and subject matter experts will provide verbal answers live. Competence consists of several parallel prerecorded product breakout sessions, each lasting for max. 1 hour. At first, two Oracle representatives will discuss Oracle’s contribution to Partners. Then you’ll see the product breakout sessions followed by Q&A with Oracle Experts. A Q&A document covering all questions and answers will be made available two weeks after the webcast. You can also see Competence afterwards as its content will be available online for the next 6-12 months.The next Competence web casts will be presented as follows: June the 4th  2012 September the 3rd  2012 December the 3rd  2012 March the 4th  2013. Note: Depending on local network bandwidth please allow some seconds time the presentations to download. You might want to refresh your screen by pressing F5. DurationMaximum 1 hour For further information please contact me at [email protected]. Best regards Markku RouhiainenDirector, Applications Partner EnablementWestern Europe

    Read the article

  • PARTNER WEBCAST- ORACLE COMPETENCE - PROGRAM (COMPETENCE VIRTUAL)

    - by mseika
    I am pleased to invite you to join the second (Competence Virtual). In Competence - program we will present Oracle Applications' Product's new functions and features including sales positioning. The key objectives of these webcasts are to inspire System Integrator's implementation personnel to conduct successful after sales in their Customer projects. Competencewill be presented on 1st Monday of each quarter after the billable day (4:00 to 5:00 PM CET). The webcast is intended for System Integrator's Implementation Certified Specialists but Competence is open for other interested Oracle Applications system Integrator's personnel as well. At first, two Oracle representatives will discuss Oracle's contribution to Partners. Then you will see product breakout session followed by Q&A with Oracle Experts. Each session will last for maximum 1 hour. A Q&A Document covering all questions and answers will be made available two weeks after the webcast. What are the Benefits for Partners? Find out how Competence helps you to improve your after sales Discover new functions and features so you can enrich your Customer’s solution Learn more about Oracle Applications products, especially sales positioning Hear crucial questions raised by colleagues alike, learn from their interest Engage and present your questions to subject experts Be inspired of the richness of Oracle Applications portfolio – for your and your Customer’s benefit.   Note: Should you already be familiar with a specific Product, then choose another one. Doing so you would expand your knowledge of the overall Applications portfolio. Some presentations contain product demonstration, although these presentations are not intended to be extremely detailed technical presentations.   Product breakout sessions:- Fusion CRM: Effective, Efficient and Easy- Fusion HCM: Talent management overview performance, goals, talent review- Distributed Order Management - Fusion SCM Solution- Oracle Transportation Management- Oracle Value Chain Planning: Demantra Sales & Operation Planning and Demantra Demand Management- Oracle CX (Customer Experience) - formerly CEM: Powering Great Customer Experiences- EPM 11.1.2.2 Overview- Oracle Hyperion Profitability and Cost Management, 11.1.2.1 For more details please visit and other breakout sessions on OPN page. Delivery FormatCompetence- program (Competence Virtual) is a series of FREE prerecorded Applications product presentations followed by Q&A. It will be delivered over the Web. Participants have the opportunity to submit questions during the cast via chat and subject matter experts will provide verbal answers live. Competence consists of several parallel prerecorded product breakout sessions, each lasting for max. 1 hour. At first, two Oracle representatives will discuss Oracle’s contribution to Partners. Then you’ll see the product breakout sessions followed by Q&A with Oracle Experts. A Q&A document covering all questions and answers will be made available two weeks after the webcast. You can also see Competence afterwards as its content will be available online for the next 6-12 months.The next Competence web casts will be presented as follows: June the 4th  2012 September the 3rd  2012 December the 3rd  2012 March the 4th  2013. Note: Depending on local network bandwidth please allow some seconds time the presentations to download. You might want to refresh your screen by pressing F5. DurationMaximum 1 hour For further information please contact me at [email protected]. Best regards Markku RouhiainenDirector, Applications Partner EnablementWestern Europe

    Read the article

  • PARTNER WEBCAST- ORACLE COMPETENCE - PROGRAM (COMPETENCE VIRTUAL)

    - by mseika
    I am pleased to invite you to join the second (Competence Virtual). In Competence - program we will present Oracle Applications' Product's new functions and features including sales positioning. The key objectives of these webcasts are to inspire System Integrator's implementation personnel to conduct successful after sales in their Customer projects. Competencewill be presented on 1st Monday of each quarter after the billable day (4:00 to 5:00 PM CET). The webcast is intended for System Integrator's Implementation Certified Specialists but Competence is open for other interested Oracle Applications system Integrator's personnel as well. At first, two Oracle representatives will discuss Oracle's contribution to Partners. Then you will see product breakout session followed by Q&A with Oracle Experts. Each session will last for maximum 1 hour. A Q&A Document covering all questions and answers will be made available two weeks after the webcast. What are the Benefits for Partners? Find out how Competence helps you to improve your after sales Discover new functions and features so you can enrich your Customer’s solution Learn more about Oracle Applications products, especially sales positioning Hear crucial questions raised by colleagues alike, learn from their interest Engage and present your questions to subject experts Be inspired of the richness of Oracle Applications portfolio – for your and your Customer’s benefit.   Note: Should you already be familiar with a specific Product, then choose another one. Doing so you would expand your knowledge of the overall Applications portfolio. Some presentations contain product demonstration, although these presentations are not intended to be extremely detailed technical presentations. Product breakout sessions:- Fusion CRM: Effective, Efficient and Easy- Fusion HCM: Talent management overview performance, goals, talent review- Distributed Order Management - Fusion SCM Solution- Oracle Transportation Management- Oracle Value Chain Planning: Demantra Sales & Operation Planning and Demantra Demand Management- Oracle CX (Customer Experience) - formerly CEM: Powering Great Customer Experiences- EPM 11.1.2.2 Overview- Oracle Hyperion Profitability and Cost Management, 11.1.2.1 For more details please visit and other breakout sessions on OPN page. Delivery FormatCompetence- program (Competence Virtual) is a series of FREE prerecorded Applications product presentations followed by Q&A. It will be delivered over the Web. Participants have the opportunity to submit questions during the cast via chat and subject matter experts will provide verbal answers live. Competence consists of several parallel prerecorded product breakout sessions, each lasting for max. 1 hour. At first, two Oracle representatives will discuss Oracle’s contribution to Partners. Then you’ll see the product breakout sessions followed by Q&A with Oracle Experts. A Q&A document covering all questions and answers will be made available two weeks after the webcast. You can also see Competence afterwards as its content will be available online for the next 6-12 months.The next Competence web casts will be presented as follows: June the 4th  2012 September the 3rd  2012 December the 3rd  2012 March the 4th  2013. Note: Depending on local network bandwidth please allow some seconds time the presentations to download. You might want to refresh your screen by pressing F5. DurationMaximum 1 hour For further information please contact me at [email protected]. Best regards Markku RouhiainenDirector, Applications Partner EnablementWestern Europe

    Read the article

  • Silverlight Cream for December 13, 2010 -- #1010

    - by Dave Campbell
    In this Issue: Rénald Nollet, Benjamin Gavin, Dennis Doomen, Tim Greenfield, Mike Taulty, Jeff Blankenburg, Michael Crump, Laurent Duveau, Dragos Manolescu, KeyboardP, Yochay Kiriaty. Above the Fold: Silverlight: "Silverlight RIA Services and Basic, Anonymous Authentication" Benjamin Gavin WP7: "lving Circular Navigation in Windows Phone Silverlight Applications" Yochay Kiriaty SQL Azure: "SQL Azure Database Manager – Part 1 : How to connect to your SQL Azure DB" Rénald Nollet Shoutouts: Yochay Kiriaty has a post up on the Windows Phone Devloper Blog about open source (MSPL) projects helping WP7 devs: Windows Phone Recipes – Helping the Community Jesse Liberty's latest Yet Another Podcast is up and thie time it's Joe Stagner: Yet Another Podcast #18 – Joe Stagner Josh Schwartzberg sent me this link to what is apparently his yearly web-only rock Christmas album: MetalXmas... done in Silverlight and RIA Services From SilverlightCream.com: SQL Azure Database Manager – Part 1 : How to connect to your SQL Azure DB Rénald Nollet posted Part 1 of a series on a SQL Azure database manager all in Silverlight... has a live demo running, some description, and is making us wait for the next part! Silverlight RIA Services and Basic, Anonymous Authentication Benjamin Gavin has a quick post up resolving a basic RIA Services problem that I bet a lot of folks are looking for the answer on... like 500 series errors... cool little find he ferreted out... A night of Silverlight, WPF, unit testing and Caliburn Micro Dennis Doomen in concert with his employer gave a couple talks at the local DotNED user group, and covered literally a cornucopia of topics... slides, and example code for both talks... lotsa material here... Tim Greenfield on PuzzleTouch WP7 Application Tim Greenfield is the latest WP7 app developer to be interviewed by the SilverlightShow crew... lots of interesting comments and insight from Tim. Rebuilding the PDC 2010 Silverlight Application (Part 4) Mike Taulty has part 4 of his PDC 2010 Silverlight app construction project up and is taking the app into Blend, and the considerations that brought to the table. What I Learned In WP7 – Issue #2 Jeff Blankenburg continues his "What I Learned" series with this discussion about fonts, the Non-Linear Navigation service I mention below, and possible WP7 jobs. Part 3 of 4 : Tips/Tricks for Silverlight Developers Michael Crump has Part 3 of his Tips/Tricks up today. Lots of goodies this time: underlining in a TextBlock, getting browser info, startup params, VisualTreeHelper, and child windows. My Windows Phone 7 presentation in Montreal Laurent Duveau gave a WP7 presentation in Montreal as part of the Microsoft Windows Phone 7 Developer's Briefing, and has posted his materials and slide deck WP7 Code: Mocking Event Streams with IEnumerable Dragos Manolescu has a very cool post up on using IEnumerable to Mock event streams by leveraging the IObservable/IEnumerable duality, and uses the 2D bubble app that you can run and test in the emulator without needing an accelerometer Transparent Wallpapers – Video Tutorial KeyboardP has had so many queries about his Transparent wallpaper for WP7 that he produced a video tutorial for it... Solving Circular Navigation in Windows Phone Silverlight Applications Yochay Kiriaty discusses the first recipe they are releasing ... see the shoutout above, a Nonlinear Navigation Service ... to help with apps that have loops in navigation. Stay in the 'Light! Twitter SilverlightNews | Twitter WynApse | WynApse.com | Tagged Posts | SilverlightCream Join me @ SilverlightCream | Phoenix Silverlight User Group Technorati Tags: Silverlight    Silverlight 3    Silverlight 4    Windows Phone MIX10

    Read the article

  • Application Performance Episode 2: Announcing the Judges!

    - by Michaela Murray
    The story so far… We’re writing a new book for ASP.NET developers, and we want you to be a part of it! If you work with ASP.NET applications, and have top tips, hard-won lessons, or sage advice for avoiding, finding, and fixing performance problems, we want to hear from you! And if your app uses SQL Server, even better – interaction with the database is critical to application performance, so we’re looking for database top tips too. There’s a Microsoft Surface apiece for the person who comes up with the best tip for SQL Server and the best tip for .NET. Of course, if your suggestion is selected for the book, you’ll get full credit, by name, Twitter handle, GitHub repository, or whatever you like. To get involved, just email your nuggets of performance wisdom to [email protected] – there are examples of what we’re looking for and full competition details at Application Performance: The Best of the Web. Enter the judges… As mentioned in my last blogpost, we have a mystery panel of celebrity judges lined up to select the prize-winning performance pointers. We’re now ready to reveal their secret identities! Judging your ASP.NET  tips will be: Jean-Phillippe Gouigoux, MCTS/MCPD Enterprise Architect and MVP Connected System Developer. He’s a board member at French software company MGDIS, and teaches algorithms, security, software tests, and ALM at the Université de Bretagne Sud. Jean-Philippe also lectures at IT conferences and writes articles for programming magazines. His book Practical Performance Profiling is published by Simple-Talk. Nik Molnar,  a New Yorker, ASP Insider, and co-founder of Glimpse, an open source ASP.NET diagnostics and debugging tool. Originally from Florida, Nik specializes in web development, building scalable, client-centric solutions. In his spare time, Nik can be found cooking up a storm in the kitchen, hanging with his wife, speaking at conferences, and working on other open source projects. Mitchel Sellers, Microsoft C# and DotNetNuke MVP. Mitchel is an experienced software architect, business leader, public speaker, and educator. He works with companies across the globe, as CEO of IowaComputerGurus Inc. Mitchel writes technical articles for online and print publications and is the author of Professional DotNetNuke Module Programming. He frequently answers questions on StackOverflow and MSDN and is an active participant in the .NET and DotNetNuke communities. Clive Tong, Software Engineer at Red Gate. In previous roles, Clive spent a lot of time working with Common LISP and enthusing about functional languages, and he’s worked with managed languages since before his first real job (which was a long time ago). Long convinced of the productivity benefits of managed languages, Clive is very interested in getting good runtime performance to keep managed languages practical for real-world development. And our trio of SQL Server specialists, ready to select your top suggestion, are (drumroll): Rodney Landrum, a SQL Server MVP who writes regularly about Integration Services, Analysis Services, and Reporting Services. He’s authored SQL Server Tacklebox, three Reporting Services books, and contributes regularly to SQLServerCentral, SQL Server Magazine, and Simple–Talk. His day job involves overseeing a large SQL Server infrastructure in Orlando. Grant Fritchey, Product Evangelist at Red Gate and SQL Server MVP. In an IT career spanning more than 20 years, Grant has written VB, VB.NET, C#, and Java. He’s been working with SQL Server since version 6.0. Grant volunteers with the Editorial Committee at PASS and has written books for Apress and Simple-Talk. Jonathan Allen, leader and founder of the PASS SQL South West user group. He’s been working with SQL Server since 1999 and enjoys performance tuning, development, and using SQL Server for business solutions. He’s spoken at SQLBits and SQL in the City, as well as local user groups across the UK. He’s also a moderator at ask.sqlservercentral.com.

    Read the article

  • Silverlight Cream for May 08, 2010 -- #858

    - by Dave Campbell
    In this Issue: Phil Middlemiss, Jaime Rodriguez, Senthil Kumar, Mike Snow, DaveDev, Gergely Orosz, Kirupa, Cheryl Simmons, András Velvárt, Dan Wahlin, Michael D. Brown, and Ben Rush. Shoutouts: Erik Mork and crew have their latest up: This Week In Silverlight – Where’s the Tablet? Chris Rouw has a good link post and instructions on WCF RIA services: Deploying and Configuring Silverlight 4 and WCF RIA Services From SilverlightCream.com: Quick and Easy Sscalable Rounded Bevels Phil Middlemiss duplicates some bevel-edged rectangles in Blend, and they look great. Now you don't have to import all the other PhotoShop bits to get those things looking the way you want! A transparent Windows PHONE FAQ Jaime Rodriguez combined a bunch of information into a WP7 FAQ that he's going to keep up to date, so bookmark the page. He also has links to the Training Kit, on and offline versions. Windows Phone Developer Training Kit April Refresh is now available for Download Thanks to Senthil Kumar, I found out there is an April refresh of the WP7 Training kit at Channel 9 -- go get yours now --- I'll still be here when you get back! Silverlight Tip of the Day #16 – Working with IgnoreImageCache Mike Snow's Tip of the day #16 covers IgnoreImageCache and like many other things in life, until you read Mike's post you may be surprised at how it works. DoodlePad – A fun, free, sketching application for Windows Phone 7 DaveDev has a new WP7 App up that lets you or your kids 'Doodle' on the phone... could be a note, or could be a drawing... good post with all the links you need to get this cranked up on the emulator. Printing in Silverlight: Printing Charts and Auto Scaling Gergely Orosz's latest post is a very useful one on auto-scaling charts to fit a printed page and then getting them to print. Smoothly Scrolling a ListBox Check out the smooth scrolling Kirupa has on the ListBox near the top of his post... all good stuff... you wanna know how to do that! Plus... it's dead simple and all in Blend :) http://www.sparklingclient.com/wheres-the-silverlight-tablet/ Cheryl Simmons has a great tip up at the SilverlightSDK if you haven't burned through to figure it out yet ... changing the watermark on a DatePicker control... looks great! The story of a wicked bug András Velvárt tells a story of a bug that just defied logic or being found. Read how he tracked it down and what it actually was... could save you some time. Story learned: if I have a problem that bad, I'm calling András :) Text Trimming in Silverlight 4 Dan Wahlin gives a quick run-through of what TextBox trimming is, and then by a good real example... check it out and start using it in your projects. Enterprise Patterns with WCF RIA Services Michael D. Brown has an article in MSDN Magazine on RIA Services. Great information and link-packed article, with all the source avialable for download. Building Custom Players with the Silverlight Media Framework Ben Rush has a nice long tutorial on the Silverlight Media Framework up on the MSDN Magazine site ... lots of information in there. Stay in the 'Light! Twitter SilverlightNews | Twitter WynApse | WynApse.com | Tagged Posts | SilverlightCream Join me @ SilverlightCream | Phoenix Silverlight User Group Technorati Tags: Silverlight    Silverlight 3    Silverlight 4    Windows Phone MIX10

    Read the article

  • The busy developers guide to the Kinect SDK Beta

    - by mbcrump
    The Kinect is awesome. From day one, I’ve said this thing has got potential. After playing with several open-source Kinect projects, I am please to announce that Microsoft has released the official SDK beta on 6/16/2011. I’ve created this quick start guide to get you up to speed in no time flat. Let’s begin: What is it? The Kinect for Windows SDK beta is a starter kit for applications developers that includes APIs, sample code, and drivers. This SDK enables the academic research and enthusiast communities to create rich experiences by using Microsoft Xbox 360 Kinect sensor technology on computers running Windows 7. (defined by Microsoft) Links worth checking out: Download Kinect for Windows SDK beta – You can either download a 32 or 64 bit SDK depending on your OS. Readme for Kinect for Windows SDK Beta from Microsoft Research  Programming Guide: Getting Started with the Kinect for Windows SDK Beta Code Walkthroughs of the samples that ship with the Kinect for Windows SDK beta (Found in \Samples Folder) Coding4Fun Kinect Toolkit – Lots of extension methods and controls for WPF and WinForms. Kinect Mouse Cursor – Use your hands to control things like a mouse created by Brian Peek. Kinect Paint – Basically MS Paint but use your hands! Kinect for Windows SDK Quickstarts Installing and Using the Kinect Sensor Getting it installed: After downloading the Kinect SDK Beta, double click the installer to get the ball rolling. Hit the next button a few times and it should complete installing. Once you have everything installed then simply plug in your Kinect device into the USB Port on your computer and hopefully you will get the following screen: Once installed, you are going to want to check out the following folders: C:\Program Files (x86)\Microsoft Research KinectSDK – This contains the actual Kinect Sample Executables along with the documentation as a CHM file. Also check out the C:\Users\Public\Documents\Microsoft Research KinectSDK Samples directory: The main thing to note here is that these folders contain the source code to the applications where you can compile/build them yourself. Audio NUI DEMO Time Let’s get started with some demos. Navigate to the C:\Program Files (x86)\Microsoft Research KinectSDK folder and double click on ShapeGame.exe. Next up is SkeletalViewer.exe (image taken from http://www.i-programmer.info/news/91-hardware/2619-microsoft-launch-kinect-sdk-beta.html as I could not get a good image using SnagIt) At this point, you will have to download Kinect Mouse Cursor – This is really cool because you can use your hands to control the mouse cursor. I actually used this to resize itself. Last up is Kinect Paint – This is very cool, just make sure you read the instructions! MS Paint on steroids! A few tips for getting started building Kinect Applications. It appears WPF is the way to go with building Kinect Applications. You must also use a version of Visual Studio 2010.  Your going to need to reference Microsoft.Research.Kinect.dll when building a Kinect Application. Right click on References and then goto Browse and navigate to C:\Program Files (x86)\Microsoft Research KinectSDK and select Microsoft.Research.Kinect.dll. You are going to want to make sure your project has the Platform target set to x86. The Coding4Fun Kinect Toolkit really makes things easier with extension methods and controls. Just note that this is for WinForms or WPF. Conclusion It looks like we have a lot of fun in store with the Kinect SDK. I’m very excited about the release and have already been thinking about all the applications that I can begin building. It seems that development will be easier now that we have an official SDK and the great work from Coding4Fun. Please subscribe to my blog or follow me on twitter for more information about Kinect, Silverlight and other great technology.  Subscribe to my feed

    Read the article

  • Database – Beginning with Cloud Database As A Service

    - by Pinal Dave
    I love my weekend projects. Everybody does different activities in their weekend – like traveling, reading or just nothing. Every weekend I try to do something creative and different in the database world. The goal is I learn something new and if I enjoy my learning experience I share with the world. This weekend, I decided to explore Cloud Database As A Service – Morpheus. In my career I have managed many databases in the cloud and I have good experience in managing them. I should highlight that today’s applications use multiple databases from SQL for transactions and analytics, NoSQL for documents, In-Memory for caching to Indexing for search.  Provisioning and deploying these databases often require extensive expertise and time.  Often these databases are also not deployed on the same infrastructure and can create unnecessary latency between the application layer and the databases.  Not to mention the different quality of service based on the infrastructure and the service provider where they are deployed. Moreover, there are additional problems that I have experienced with traditional database setup when hosted in the cloud: Database provisioning & orchestration Slow speed due to hardware issues Poor Monitoring Tools High network latency Now if you have a great software and expert network engineer, you can continuously work on above problems and overcome them. However, not every organization have the luxury to have top notch experts in the field. Now above issues are related to infrastructure, but there are a few more problems which are related to software/application as well. Here are the top three things which can be problems if you do not have application expert: Replication and Clustering Simple provisioning of the hard drive space Automatic Sharding Well, Morpheus looks like a product build by experts who have faced similar situation in the past. The product pretty much addresses all the pain points of developers and database administrators. What is different about Morpheus is that it offers a variety of databases from MySQL, MongoDB, ElasticSearch to Reddis as a service.  Thus users can pick and chose any combination of these databases.  All of them can be provisioned in a matter of minutes with a simple and intuitive point and click user interface.  The Morpheus cloud is built on Solid State Drives (SSD) and is designed for high-speed database transactions.  In addition it offers a direct link to Amazon Web Services to minimize latency between the application layer and the databases. Here are the few steps on how one can get started with Morpheus. Follow along with me.  First go to http://www.gomorpheus.com and register for a new and free account. Step 1: Signup It is very simple to signup for Morpheus. Step 2: Select your database   I use MySQL for my daily routine, so I have selected MySQL. Upon clicking on the big red button to add Instance, it prompted a dialogue of creating a new instance.   Step 3: Create User Now we just have to create a user in our portal which we will use to connect to a database hosted at Morpheus. Click on your database instance and it will bring you to User Screen. Over here you will notice once again a big red button to create a new user. I created a user with my first name.   Step 4: Configure your MySQL client I used MySQL workbench and connected to MySQL instance, which I had created with an IP address and user.   That’s it! You are connecting to MySQL instance. Now you can create your objects just like you would create on your local box. You will have all the features of the Morpheus when you are working with your database. Dashboard While working with Morpheus, I was most impressed with its dashboard. In future blog posts, I will write more about this feature.  Also with Morpheus you use the same process for provisioning and connecting with other databases: MongoDB, ElasticSearch and Reddis. Reference: Pinal Dave (http://blog.sqlauthority.com)Filed under: MySQL, PostADay, SQL, SQL Authority, SQL Query, SQL Server, SQL Tips and Tricks, T SQL

    Read the article

< Previous Page | 414 415 416 417 418 419 420 421 422 423 424 425  | Next Page >