Daily Archives

Articles indexed Friday April 9 2010

Page 40/128 | < Previous Page | 36 37 38 39 40 41 42 43 44 45 46 47  | Next Page >

  • delete key on linux does not work

    - by Gauthier Fleutot
    Hi! My delete key does not work in ubuntu, it does nothing. I understand that this is a common problem, but I could solve it with the information I found elsewhere. I ran xev. Pressing the 'a' key gives: KeyRelease event, serial 30, synthetic NO, window 0x2c00001, root 0x1a6, subw 0x0, time 7255643, (-113,-107), root:(425,300), state 0x2010, keycode 38 (keysym 0x61, a), same_screen YES, XLookupString gives 1 bytes: (61) "a" XFilterEvent returns: False Pressing 'Delete' gives: FocusOut event, serial 30, synthetic NO, window 0x2c00001, mode NotifyGrab, detail NotifyAncestor FocusIn event, serial 30, synthetic NO, window 0x2c00001, mode NotifyUngrab, detail NotifyAncestor KeymapNotify event, serial 30, synthetic NO, window 0x0, keys: 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 From there I don't know what to do. Help?

    Read the article

  • How to reserve a set of primary key identifiers for preloading bootstrap data

    - by Joshua
    We would like to reserve a set of primary key identifiers for all tables (e.g. 1-1000) so that we can bootstrap the system with pre-loaded system data. All our JPA entity classes have the following definition for the primary key. @Id @GeneratedValue(strategy = IDENTITY) @Column(name = "id", unique = true, nullable = false, insertable = false, updatable = false) private Integer id; is there a way to tell the database that increments should start happening from 1000 (i.e. customer specific data will start from 1000 onwards). We support (h2, mysql, postgres) in our environment and I would prefer a solution which can be driven via JPA and reverse engineering DDL tools from Hibernate. Let me know if this is the correct approach

    Read the article

  • Installer for asp.net web application

    - by Thurein
    Hi I am trying to implement a installer which is going to perform following tasks.1. Check and install .net 3.52. check and install SQL server 2008 (standard edition)3. create the databases4. create a virtual directory and deploy published resources5. Deploy SSIS and package for the datawarehousing and to run the SSAS package.Right now I am using wix, to deal with some of the task, its working for me for now, but I just want to know other options and better way to do this (is there any) .Thanks and regardsThurein I am trying to implement an installer, which I m gonna hand it to the end user as a product. Check and install .net 3.5 check and install SQL server 2008 (standard edition) create the databases create a virtual directory and deploy published resources Deploy SSIS and package for the datawarehousing and to run the SSAS package. Right now I am using wix, to deal with some of the task, it works for me, but I am just curious about other options and better ways to do this (is there any) . My main intension is, I would like to distribute my product (asp.net web application) to the end user for a trial, and end user with the limited IT knowledge could install and use that web application with in a group of user. After the end of trial period the user could ask for the activation key for further usages. Thanks Thurein

    Read the article

  • How do I debug a crash when I run my garbage-collected app in Rosetta?

    - by Rob Keniger
    I have a Universal app which is targeting 10.5 and which uses garbage collection. I am building for ppc, i386 and x86_64. I don't have access to a physical PowerPC machine so I am trying to use Rosetta to confirm that the PowerPC portion of the app works correctly. However, as soon as the app is launched in Rosetta it immediately crashes with the following crash log: Process: FooApp [91567] Path: /Users/rob/Development/src/FooApp/build/Release 64-bit/FooApp.app/Contents/MacOS/FooApp Identifier: com.companyX.FooApp Version: 0.9 (build d540e05) (2) Code Type: PPC (Translated) Parent Process: launchd [708] Date/Time: 2010-04-09 18:32:23.962 +1000 OS Version: Mac OS X 10.6.3 (10D573) Report Version: 6 Exception Type: EXC_CRASH (SIGTRAP) Exception Codes: 0x0000000000000000, 0x0000000000000000 Crashed Thread: 5 ...snip non-relevant threads... Thread 5 Crashed: 0 libSystem.B.dylib 0x8023656a __pthread_kill + 10 1 libSystem.B.dylib 0x80235e17 pthread_kill + 95 2 com.companyX.FooApp 0xb80bfb30 0xb8000000 + 785200 3 com.companyX.FooApp 0xb80c0037 0xb8000000 + 786487 4 com.companyX.FooApp 0xb80dd8e8 0xb8000000 + 907496 5 com.companyX.FooApp 0xb8145397 spin_lock_wrapper + 1791 6 com.companyX.FooApp 0xb801ceb7 0xb8000000 + 118455 I have used the Apple docs on debugging translated apps and the information on this page to attach gdb to the app when it's running in Rosetta. The app immediately breaks into the debugger upon launch: Program received signal SIGTRAP, Trace/breakpoint trap. [Switching to thread 15107] 0x9151fdd4 in auto_fatal () (gdb) bt #0 0x9151fdd4 in auto_fatal () #1 0x91536d84 in Auto::Thread::get_register_state () #2 0x915372f8 in Auto::Thread::scan_other_thread () #3 0x91529be4 in Auto::Zone::scan_registered_threads () #4 0x91539114 in Auto::MemoryScanner::scan_thread_ranges () #5 0x9153b000 in Auto::MemoryScanner::scan () #6 0x9153049c in Auto::Zone::collect () #7 0x915198f4 in auto_collect_internal () #8 0x9151a094 in auto_collection_work () #9 0x96687434 in _dispatch_call_block_and_release () #10 0x9668912c in _dispatch_queue_drain () #11 0x96689350 in _dispatch_queue_invoke () #12 0x966895c0 in _dispatch_worker_thread2 () #13 0x966896fc in _dispatch_worker_thread () #14 0x965a97e8 in _pthread_body () (gdb) I have no idea where to start with this. It looks like the Garbage Collector is failing very badly. Are garbage-collected PowerPC apps not supported in Rosetta? I can't see any mention of this limitation in the docs if so. Does anyone have any ideas?

    Read the article

  • Detect iphone region

    - by camilo
    Hi. In my app, the user is supposed to insert a phone number, which is then displayed somewhere else. In the contacts application, when displaying a phone number, it automatically appears in the format of the language selected by the user. Is there a way to do this automatically, or a way to detect the region and then adapt the displayed string?

    Read the article

  • set position in a table

    - by Senthilkumar
    Hi can any one tell .. how to set position inside a table.. I have table inside which I have span and certain links .. I made as cetre alignment and span text s starting from centre but when i do the same for all links everthing displayed in centre if it own.. but i need to start all text at the same position/.. how to do this???

    Read the article

  • Can I suppress newlines with Django's template engine?

    - by ento
    In Rails ERB, you can suppress newlines by adding a trailing hyphen to tags: <ul> <% for @item in @items -%> <li><%= @item %></li> <% end -%> </ul> becomes: <ul> <li>apple</li> <li>banana</li> <li>cacao</li> </ul> Is there a way to do this in Django? (Disclosure: I'm generating a csv file with Django)

    Read the article

  • Objective C Object Functioning & Passing Arrays

    - by Patrick
    I apologise if this has been asked before but I can't find the info I need. Basically I want a UITableView to be populated using info from a server, similar to the SeismicXML example. I have the parser as a separate object, is it correct to alloc, init an instance of that parser & then tell RootViewController to make it's table data source a copy of the parser's array. I can't include code because I haven't written anything yet, I'm just trying to get the design right before I start. Perhaps something like: xmlParser = [[XMLParser alloc] init]; [xmlParser getXMLData]; // Assuming xmlParser stores results in an array called returnedArray self.tableDataSource = xmlParser.returnedArray Is this the best way of doing it?

    Read the article

  • CruiseControl failing view compilation with Asp.net MVC 2 RTM

    - by Robert Koritnik
    Tehnologies: - CruiseControlNet - Asp.net MVC 2 RTM - enabled view compilation The problem is UrlParameter.Optional setting. I can't seem to make it work when I use this setting inside a view. When I compile inside Visual Studio, everything works fine, but when CCNet uses MSBuild to compile it it fails with following error: errorCS0103: The name 'UrlParameter' does not exist in the current context pointing to the line inside my view where this parameter is set on: Html.RenderAction(...) that sets certain route parameter(s) to optional. I tried adding <%@ Assembly name="System.Web.Mvc" %> at the top of my view, but it didn't work either. It works of course when I disable view compilation, but that's not really an option. And I also don't want to set my optional parameters to string.Empty. Anyone has any hint on this?

    Read the article

  • Extract primary key from MySQL in PHP

    - by Parth
    I have created a PHP script and I am lacking to extract the primary key, I have given flow below, please help me in how can i modify to get primary key I am using MySQL DB, working for Joomla, My requirement is tracking the activity like insert/update/delete on any table and store it in another audit table using triggers, i.e. I am doing Auditing. DB's table structure: Few tables dont have any PK nor auto increment key Flow of my script is : I fetch out all table from DB. I check whether the table have any trigger or not. If yes then it moves to check nfor next table and so on. If it does'nt find any trigger then it creates the triggers for the table, such that, -it first checks if the table has any primary key or not(for inserting in Tracking audit table for every change made) if it has the primary key then it uses it further in creation of trigger. if it doesnt find any PK then it proceeds further in creating the trigger without inserting any id in audit table Now here, My problem is I need the PK every time so that I can record the id of any particular table in which the insert/update/delete is performed, so that further i can use this audit track table to replicate in production DB.. Now as I haave mentioned earlier that I am not available with PK/auto-incremented in some table, then what should I do get the particular id in which change is done? please guide me...GEEKS!!!

    Read the article

  • Garbage collection - manually wiping EVERYTHING!

    - by Glycerine
    I have been building a game for a while (nearly done) - But the game needs a replay button and its a big task. I know the GC is dreadful in flash, but I wanted to know if there is a way to wipe EVERYTHING as if the flash app has just begun. Clearing memory, game data - I haven't to worry about game loading as its not really heavy on data. Everything pretty much lives in a DataModel - but I fear if I just clear the all variables, I'll have pockets of orphaned memory. Any forwarding idea would be great. cheers guys.

    Read the article

  • How to Cache image when src is some action which returns image?

    - by Bipul
    There are lots of questions about how to force the browser to cache or not to cache any image. But, I am facing slightly different situation. In several places of my web page, I am using following code for the images. <img title="<%= Html.Encode(Model.title)%>" src="<%= Url.Action(MVC.FrontEnd.Actions.RetrieveImage(Model.SystemId))%>"/> So, in the generated HTML it is like <img title="blahblah" src="http://xyz.com/FrontEnd/Actions/RetrieveImage?imageId=X"> Where X is some integer. I have seen that though the browser (IE or Mozilla) caches images by default, it is not caching images generated by above method. Is there any way I can tell browser to cache images of above type? Thanks in advance.

    Read the article

  • Getting your bearings and defining the project objective

    - by johndoucette
    I wrote this two years ago and thought it was worth posting… Some may think this is a daunting task and some may even say “what a waste of time” and want to open MS Project and start typing out tasks because someone asked for an estimate and a task list. Hell, maybe you even use Excel and pump out a spreadsheet with some real scientific formula for guessing how long it will take to code a bunch of classes. However, this short exercise will provide the basis for the entire project, whether small or large and be a great friend when communicating to anyone on your team or even your client. I call this the Project Brief. If you find yourself going beyond a single page, then you must decompose the sections and summarize your findings so there is a complete and clear picture of the project you are working on in a relatively short statement. Here is a great quote from the PMBOK (Project Management Body of Knowledge) relative to what a project is;   A project is a temporary endeavor undertaken to create a unique product, service or result. With this in mind, the project brief should encompass the entirety (objective) of the endeavor in its explanation and what it will take (goals) to create the product, service or result (deliverables). Normally the process of identifying the project objective is done during the first stage of a project called the Project Kickoff, but you can perform this very important step anytime to help you get a bearing. There are many more parts to helping a project stay on course, but this is usually the foundation where it can be grounded on. Through a series of 3 exercises, you should be able to come up with the objective, goals and deliverables on your project. Follow these steps, and in no time (about &frac12; hour), you will have the foundation of your project plan. (See examples below) Exercise 1 – Objectives Begin with the end in mind. Think about your project in business terms with a couple things to help you understand the objective; Reference the business benefit in terms of cost, speed and / or quality, Provide a higher level of what the outcome will look like (future sense) It should be non-measurable, that’s what the goals are all about The output should be a single paragraph with three sentences and take 10 minutes to write. *Typically, agreement must be reached on the objectives of the project before you would proceed to the next steps of the project. Exercise 2 – Goals A project goal is a statement that answers questions about who, what, why, where and when. A good project goal statement; Answers the five “W” questions for the project Is measurable in each of its parts Is published and agreed on by all the owners This helps the Project Manager receive confirmation on defining the project target. Using the established project objective done in the first exercise, think about the things it will take to get the job done. Think about tangible activities which are the top level tasks in a typical Work Breakdown Structure (WBS). The overall goal statement plus all the deliverables (next exercise) can be seen as the project team’s contract with the project owners. Write 3 - 5 goals in about 10 minutes. You should not write the words “Who, what, why, where and when, but merely be able to answer the questions when you read a goal. Exercise 3 – Deliverables Every project creates some type of output and these outputs are called deliverables. There are two classes of deliverables; Internal – produced for project team members to meet their goals External – produced for project owners to meet their expectations The list you enter here provides a checklist for the team’s delivery and/or is a statement of all the expectations of the project owners. Here are some typical project deliverables; Product and product documentation End product/system Requirements/feature documents Installation guides Demo/prototype System design documents User guides/help files Plans Project plan Training plan Conversion/installation/delivery plan Test plans Documentation plan Communication plan Reports and general documentation Progress reports System acceptance tests Outstanding bug list Procedures Risk and issue logs Project history Deliverables should go with each of the goals. Have 3-5 deliverables for each goal. When you are done, you will have established a great foundation for the clarity of your project. This exercise can take some time, but with practice, you should be able to whip this one out in 10 minutes as well, especially if you are intimate with an ongoing project. Samples  Objective [Client] is implementing a series of MOSS sites to support external public (Internet), internal employee (Intranet) and an external secure (password protected Internet) applications. This project will focus on the public-facing web site and will provide [Client] with architectural recommendations based on the current design being done by their design partner [Partner] and the internal Content Team. In addition, it will provide [Client] with a development plan and confidence they need to deploy a world class public Internet website. Goals 1.  [Consultant] will provide technical guidance and set project team expectations for the implementation of the MOSS Internet site based on provided features/functions within three weeks. 2.  [Consultant] will understand phase 2 secure password-protected Internet site design and provide recommendations.   Deliverables 1.1  Public Internet (unsecure) Architectural Recommendation Plan 1.2  Physical Site construction Work Breakdown Structure and plan (Time, cost and resources needed) 2.1  Two Factor authentication recommendation document   Objective [Client] is currently using an application developed by [Consultant] many years ago called "XXX". This application, although functional, does not meet their new updated business requirements and contains a few defects which [Client] has developed work-around processes. [Client] would like to have a "new and improved" system to support their membership management needs by expanding membership and subscription capabilities, provide accounting integration with internal (GL) and external (VeriSign) systems, and implement hooks to the current CRM solution. This effort will take place through a series of phases, beginning with envisioning. Goals 1. Through discussions with users, [Consultant] will discover current issues/bugs which need to be resolved which must meet the current functionality requirements within three weeks. 2. [Consultant] will gather requirements from the users about what is "needed" vs. "what they have" for enhancements and provide a high level document supporting their needs. 3. [Consultant] will meet with the team members through a series of meetings and help define the overall project plan to deliver a new and improved solution. Deliverables 1.1 Prioritized list of Current application issues/bugs that need to be resolved 1.2 Provide a resolution plan on the issues/bugs identified in the current application 1.3 Risk Assessment Document 2.1 Deliver a Requirements Document showing high-level [Client] needs for the new XXX application. · New feature functionality not in the application today · Existing functionality that will remain in the new functionality 2.2 Reporting Requirements Document 3.1 A Project Plan showing the deliverables and cost for the next (second) phase of this project. 3.2 A Statement of Work for the next (second) phase of this project. 3.3 An Estimate of any work that would need to follow the second phase.

    Read the article

  • Adobe automatise l'installation de ses mises à jour de sécurité à partir de jeudi pour Acrobat et Re

    Mise à jour du 09/04/10 NB : Les commentaires sur cette mise à jour commencent ici dans le topic Adobe automatise l'installation de ses mises à jour de sécurité Pour Acrobat et Reader Adobe va délivrer ses prochaines mises à jour de sécurité pour Reader et Acrobat de manière automatique. Autrement dit, les patchs seront téléchargés et installés de manière transparente pour l'utilisateur, sans que celui-ci ait la moindre manipulation à effectuer. Ce nouveau processus automatisé entre...

    Read the article

  • Too much I/O in the morning ?

    - by steveh99999
    Interesting little improvement on a SQL 2005 system I encountered recently….. Some background - this system had a fairly ‘traditional OLTP’ workload ie  heavily used during day – till around 9pm, then had a batch window for several hours, then not much activity in the early hours of the day, until normal workload resumed the following morning. Using perfmon, I noticed that every morning, we would see a big spike in SQL Server I/O when the application started to be used... As it was 2005 I decided to look at what tables were in cache before and after the overnight batch processing ran… ( using DMV equivalent of dbcc memusage that I posted earlier). Here’s what I saw :-     So, contents of data cache split fairly evenly between my 'important/heavily used' tables.   After this:- some application batch processing,backups, DBCC checks and reindexes were run.  A fairly standard batch I'd suggest. Cache contents then looked like this :- Hmmmm – most of cache is now being used by a table I’ve described as ‘unimportant’. Why ? Well, that table was the last to be reindexed…. purely due to luck, as  the reindexing stored procedure performing a loop in alphabetical order through all application tables...  When the application starts to be used again – all this ‘unimportant’ data has to be replaced in cache by data that is heavily used… So, we changed the overnight reindex scripts –  the most heavily accessed tables are now the last to be reindexed. Obvious really, but we did see a significant reduction in early-morning I/O after changing the order of our reindexing.  

    Read the article

  • Sending SMS using free gateway

    - by ush
    I just wanted to develop one web application which allows users to send an SMS to any mobile free of charge . I searched on the net and found many codes and articles and through those articles i came to know that for that kind of application, i required either of the following things: Web service (Third party web services that are free but not working or not delivering the sms) GSM Modem ( I don't have any idea about this) SMS Gateway ( I don't have any idea about plz suggest me a idea

    Read the article

< Previous Page | 36 37 38 39 40 41 42 43 44 45 46 47  | Next Page >