Search Results

Search found 27239 results on 1090 pages for 'microsoft extension frame'.

Page 203/1090 | < Previous Page | 199 200 201 202 203 204 205 206 207 208 209 210  | Next Page >

  • Data capture from other sheet into Summary sheet

    - by Hemant
    an Excel workbook which has Summary sheet, Pending and Master Sheet. My requirement is below and try to develop a Macro or VB logic for excel • I want to control this workbook from Summary sheet. o Generate Fault Summary – ? I have set logic but if doesn’t give warning if sheet name is exists , so need to add this logic . ? When we press the Fault Report Summary command button then it copy the master sheet with cell “A6” Name and will hide the Master sheet. Again when you select the another Month name then it will generate the sheet for that month name. o Generate Toll System Uptime ? When I select the sheet name and “Week” then Press the “Enter “Command button then it should get the result from that sheet number . Each sheet number has Month detail in B2 Cell. ? To calculate the Uptime formula for Week wise is • Week-01 = (1680-SUMIFS(L5:L23,B5:B23,"="&B2,B5:B23,"<="&(B2+6)))/1680 • Week-02 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+7),B5:B23,"<="&(B2+13)))/1680 • Week-03 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+14),B5:B23,"<="&(B2+20)))/1680 • Week-04 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+21),B5:B23,"<="&(B2+27)))/1680 • Month =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2),B5:B23,"<="&(DATE(YEAR(B2),1+MONTH(B2),1)-1)))/1680 ? Result should reflect in Summary sheet at B18 cell . o Pending Fault Report Summary ? When segregate the report on its status like which one is open or Close . It is open then it is Pending Fault Report and when it is Close status it means it is closed. ? If any fault which has OPEN status in all sheets(Jan-13,Feb-13,Mar-13….etc) then it should be come as well as in Pending Sheet which ascending date order. ? When it’s status is changed then it should be moved in that month sheet or nearby fault created date. It status is close then it should not be available in pending sheet as it’s status is Closed. ? Each fault has Reported date and we monitor all fault according reported date. ? When we press the Update Fault Report Summary command button then it should update as above logic. ? Some time we export the Pending fault report , so date calendar should be present in Start and End date to Choose the date. When we press the Export command line then it should export the Pending fault report and able to save in Excel,PDF.

    Read the article

  • How to make project auto-estimate duration based on work?

    - by Bruno Brant
    This one has bothered me for a long while. I like to do estimates thinking on how much time a certain task will take (I'm in TI business), so, let's say, it takes 12 hours to build a program. Now, let's say I tell Project that my beginning date is today. If I allocate one resource to this task, it means that the task will last 1,5 days, implying that it will end tomorrow. But right now, that is not what it's doing. I say that the task will take 1 hour, and when I add a resource to it, it allocate the resource at [13%] basis, which means that the duration is still fixed... project is trying to make the task last for a day. I have, on many occasions, accomplished this. What I do is build a plan based on these rough estimates for effort, then I allocate tasks to resources. Times conflict, so I level resources and then Project magically tells me how long, in days, will it take. But every time I have to start estimating again, I end up having trouble on how to make project work like that.

    Read the article

  • How to sum cells depending on the content of a neighbor cell

    - by dannymcc
    I have an Excel document with the following columns; Date | Reference | Amount 23/01/11 | 111111111 | £20.00 25/09/11 | 222222222 | £30.00 11/11/11 | 111111111 | £40.00 01/04/11 | 333333333 | £10.00 31/03/11 | 333333333 | £33.00 20/03/11 | 111111111 | £667.00 21/11/11 | 222222222 | £564.00 I am trying to find a way of summarising the content in the following way; Reference : 111111111 Total: £727 So far the only way I have been able to achieve this is to filter the list by each reference number (manually) and then add a simple SUM formula to the bottom of the list of amounts. Are there any tricks that anyone knows that may speed this up? What I am trying to achieve is a spreadsheet that highlights each reference number that collectively exceeds over £2,000.

    Read the article

  • How to Setting Non-scrolling Rows/Columns

    - by joe
    Here things i want to do .. I am having Colum A...Z I am having data in Row 1..10 A - is Title From B ..Z . I am having differnet values . When i scroll into Z colum is hided . I want to show my A ( title ) all times even if i scrolled . How to acheive this in Excel 2007

    Read the article

  • Data Validation of a Comma Delimited List

    - by Brad
    I need a simple way of taking a comma seperated list in a cell, and providing a drop down box to select one of them. For Example, the cell could contain: 24, 32, 40, 48, 56, 64 And in a further cell, using Data Validation, I want to provide a drop-down list to select ONE of those values I need to do this without VBA or Macros please. Apolgies, I want this to work with Excel 2010 and later. I have been playing around with counting the number of commas in the list and then trying to split this into a number of rows of single numbers etc with no joy yet.

    Read the article

  • Is there a way to sort digits within a cell?

    - by Iszi
    I'd like to know if there's an Excel Function, or a formula, that can be used to sort digits within a cell. For example, if the value of A1 is 6193254807 and B1 has our formula with parameters set to sort ascending then B1 should equal 0123456789 (leading zero included). Of course, if the parameters were set so that it would sort descending then B1 should equal 9876543210. Is there a way to do this, without wandering into VBScript, or macros, or something similarly exotic?

    Read the article

  • Spreadsheet application that can handle big data OS X

    - by Peter
    I've been working with Excel for quite a while for some statistical analysis that I do regularly. The size of the data that I'm working with has gotten much larger as of late, however. The layout of the databases in question is quite simple, usually just three rows which includes a UNIX timestamp, and EST value, a proprietary numeric value and finally an average of the rows that have a timestamp +/- 1000 that row's timestamp (little AVERAGEIFS() formula). That formula and the EST conversion are the only formulas in the sheet. I'm beginning to work with files with 500,000+ rows. Running the average formula down the entire row takes forever. The end result is the production of print-worthy graphs. I'm looking for either a UNIX CL utility or separate spreadsheet/database application that can handle this amount of data without melting my CPU or making me wait an hour. Is there anything out there? TL;DR: Simple excel sheet with over half a million rows is getting too slow to work with. OS X alternatives?

    Read the article

  • How do I stop track changes from turning on automatically in Word 2007

    - by Benj
    Whenever I open an existing document in Word 2007 (on Windows XP), word turns on track changes, and changes the display mode to "Final" (that is, not "Final Showing Markup" -- so I often don't even notice track changes is on if I don't remember to pay attention. This happens for ALL existing documents, and doesn't happen for new documents. I can't find any option in the configuration that would control this behavior. I would like to restore the original/default behavior where documents are opening with Track Changes off, and in "Final showing markup" display. Steps to Reproduce Open Word 2007. Create a new document. Verify that track changes is off. Save the document and close Word. Open the document (either directly or through Word). Track changes is now on. Any ideas?

    Read the article

  • Problems when pasting Outlook 2010 signature logo into message body

    - by Austin ''Danger'' Powers
    Whenever I paste my company logo into a message in Outlook 2010, I run into a variety of complications and anomalies. The dimensions of my original logo image are 315x174 (source image is a PNG file). I am scaling this image down in Photoshop CS6 to a variety of smaller sizes for testing my Outlook signature (300x166, 250x138, 200x110,150x83 and 100x55 pixels). 300x166 = no distortion. This looks the same as in Photoshop (but far too large to use in my signature). 250x130 = distorted (gets stretched much wider by Outlook when pasting into message body). 200x110 = looks reasonable, but seems to have been scaled to a different size (smaller) by Outlook for no obvious reason. 150x83 = for some reason, this is scaled by Outlook to the exact same size that 200x110 was scaled to. In fact, a large range of similar dimensions are scaled to the exact same image size by Outlook. This is very frustrating. Why is this happening and what can be done to prevent it? 100x55 = when pasting my logo from Photoshop to Outlook with these dimensions all that happens is the cursor jumps forwards about an inch on the screen, leaving a blank space where the image was supposed to go. Any advice would be much appreciated.

    Read the article

  • Labels mail merge repeats on subsequent pages?

    - by leeand00
    I'm trying to do a mail merge to print to labels. The first field in the document does not contain a { NEXT } field code, and because of this the records repeat between label pages for example: Notice how the records shift to the left as the next page is displayed? But how they start over again in an off by one manner? Now I've tried to fix this by using the first record displayed on a page to see if the page number is 1. If it not on page 1 of the mail merge then it should just move to the next record; otherwise it should just display the first record: This doesn't work however, because when I do the preview and display the {page} field code, it reports that I am always on page 1 and thus the same behavior continues instead of just moving to the next record on the next page.

    Read the article

  • How to fore Word to recompute image numbers?

    - by Vojtech Ruzicka
    I have a word document containing images and tables. These have captions which are numbered, like "Image 1-Example of something". Later on I decided to rearrange some of chapters of my document. However numbering of objects remained the same, so the first image is image 8, the second is image 3, etc. I want to force Word to recompute image numbering so first image in document would be image 1, the second - image 2, etc. Is that possible? Will references (added through cross reference feature) to those objects be updated?

    Read the article

  • How do I create a dynamic formula on Excel?

    - by Mario Marinato -br-
    On Excel, I have a DDE formula on B1 which reads =server|info!someText.data I want to change the formula so that someText is written on A1 and then reference it on the DDE formula. Something like =server|info!A1.data. I have tried to concatenate "A1" directly on the formula, as it is above, with no success. Some other things I tried were =server|info!A1&".data" and =server|info!indirect(A1)&".data", but had no success. Is there a way to achieve this? How?

    Read the article

  • clear contents from matched column of data in another sheet

    - by Peta
    I have a column of email addresses on sheet 2 col A (but I could put them on sheet 1 if it would make it easier / faster) that I want to remove from sheet 1 col D if matched (there may be 2 or more occurences of the same email to be removed/cleared). (1000s of rows in each sheet). After all day searching forums I’m getting more confused & can't find what I'm looking for. Not sure whether to use .match or .find & .ClearContents & the syntax for iterating through. Thanks very much in anticipation Peta

    Read the article

  • Add Excel column without breaking equation

    - by CRAIG
    I have completed a very complex Excel spreadsheet with a lot of equations, except ... I forgot to include September I have Jan through Dec, all the months, except the calculations for September. Of course all the equations are currently perfect for the data that's here. How do I add a whole new column without ruining the previous equations? PS: tomorrow is my holidays and I have to go to work to finish this table, so bad

    Read the article

  • Access 2007: How can I make this EXPRESSION less complex?

    - by Mike
    Access is telling me that my new expression is to complex. It used to work when we had 10 service levels, but now we have 19! Great! My expression is checking the COST of our services in the [PriceCharged] field and then assigning the appropriate HOURS [Servicelevel] when I perform a calculation to work out how much REVENUE each colleague has made when working for a client. The [EstimatedTime] field stores the actual hours each colleague has worked. [EstimatedTime]/[ServiceLevel]*[PriceCharged] Great. Below is the breakdown of my COST to HOURS expression. I've put them on different lines to make it easier to read - please do not be put off by the length of this post, it's all the same info in the end. Many thanks,Mike ServiceLevel: IIf([pricecharged]=100(COST),6(HOURS), IIf([pricecharged]=200 Or [pricecharged]=210,12.5, IIf([pricecharged]=300,19, IIf([pricecharged]=400 Or [pricecharged]=410,25, IIf([pricecharged]=500,31, IIf([pricecharged]=600,37.5, IIf([pricecharged]=700,43, IIf([pricecharged]=800 Or [pricecharged]=810,50, IIf([pricecharged]=900,56, IIf([pricecharged]=1000,62.5, IIf([pricecharged]=1100,69, IIf([pricecharged]=1200 Or [pricecharged]=1210,75, IIf([pricecharged]=1300 Or [pricecharged]=1310,100, IIf([pricecharged]=1400,125, IIf([pricecharged]=1500,150, IIf([pricecharged]=1600,175, IIf([pricecharged]=1700,200, IIf([pricecharged]=1800,225, IIf([pricecharged]=1900,250,0)))))))))))))))))))

    Read the article

  • Expression Web 3 - Set Thesaurus

    - by Guy Thomas
    I have recently upgraded from Expression 2 to 3. It's much better, but I cannot get the Thesaurus to work. It worked fine before the upgrade. Precise error message 'No thesaurus is available for English (United Kingkdom)' I am indeed, in the UK. I have set Tools Page Editor Options to first UK and then USA - no joy. In truth I don't mind the US thesaurus, it would certainly beat 'No thesaurus'

    Read the article

  • Cannot view dates of emails(no date field), in my CSV file exported from MS Outlook

    - by barlop
    I am using Outlook 2010 - I have my emails showing in there. and exported my emails, into a csv file. (file..options..advanced...export..export to a file.. I have opened that csv file in excel Here is a list of the fields it shows. I see "Date" doesn't appear among them. Subject Body From: (Name) From: (Address) From: (Type) To: (Name) To: (Address) To: (Type) CC: (Name) CC: (Address) CC: (Type) BCC: (Name) BCC: (Address) BCC: (Type) Billing Information Categories Importance Mileage Sensitivity Any idea why "Date" isn't included, and how to include it? Also, (and less importantly, and as a very secondary issue) is there a convenient way to read the csv file? reading an email with a long body, in excel, is not convenient, I need to select all of the body from the cell and copy/paste it into notepad.

    Read the article

  • How can I read password protected Word files on OS X ?

    - by Ohad
    I receive Word documents by mail and read them using the built-in Gmail reader. Sometimes the documents are password protected and I need to obtain access to a Windows machine with Office installed in order to read them. Is there a quicker / less hassle requiring method ? I don't want to have to install Vmware / Parallels nor Office on my fresh and sterile macbook.

    Read the article

  • Specifying Multiplicity in a Visio Database (ERD) Diagram

    - by Nitrodist
    Is there a way to manually edit the cardinality/multiplicity symbols on the end of a database ERD made in Visio? The category I'm using is in Visio 2003 under Database -> Database Model Diagram I want to be able to go from something like this: To this: The second graphic was done by manually adding the numbers, but I would prefer to just do it in Visio. Is there any way of accomplishing this?

    Read the article

  • Identifying .doc/.docx files that contain images

    - by rev
    I'm moving my notes to evernote. To this end I need to convert .doc/.docx files to rtf. The reason for this is that I have a script to import rtf into evernote. However, some of my .doc/.docx files contain images. Is there any way to identify which .doc/.docx files contain images without viewing them all? I have thousands. This way I can simply open the few that have images and copy/paste the entire content straight into evernote. Should say that I'm using OS X 10.6.8.

    Read the article

  • Simple (I hope) Excel question about

    - by Princess
    I am doing a directory for my neighborhood. We had most of the information from a previous directory. The information was entered: A1 name, B1 address and C1 phone number; B1 name, B2 address, C2 phone number etc. The publisher wants the information in a different format A1 name, A2 address, A3 phone number, A4 blank; A5 name, A6 address, A7 phone number, A8 blank etc... Is there an easy (or heck - a not so easy) way to have Excel change the format of the information without me having to hand type 1300 households information? I will also need to reformat the information a second time into a crisscross. The format for that one is: A1 Street name, A2 Address Number, B2 Resident Name and C2 Phone number.

    Read the article

  • Virtual Server 2005 R2 kungfu

    - by AngryHacker
    Does Virtual Server 2005 R2 have a command line interface, that's versatile enough? Here is a situation. I run a Win2k VM on an old memory constrained machine. I allocate it 378MB of RAM and the VM runs just fine. Once a month, inside the VM, I backup the (a very large) database, compress it using 7Zip and ftp it to the backup site (all in a script). Unfortunately the compression part takes a massive amount of RAM (far exceeding the 378MB), it goes for the paging file and brings absolutely everything to a crawl and literally takes 2-3 days, if left unattended. So to fix this, I have to shutdown the VM, give it temporarily 768MB of RAM and then the whole thing finishes in 20 minutes. So, is there a way do the following automatically from the host machine in a script? Shutdown the guest OS (I think, I got this part) Change the RAM allocation from 378 to 768 Start the guest OS again then, 1 hour later, do everything in reverse.

    Read the article

  • Excel 2007 How To Reference A Seperate Cell In WS1 From A Common Cell In WS2

    - by Bob Sampson
    I have a simple file with two worksheets in. In the first worksheet (a product list) are a number of columns, including Product Code and Product Description. In the second worksheet (dispatches in January), I have Product Code. I need to insert a new column with the associated Product Description field completed based on the relevant line from the first worksheet. I'm sure this is very easy, but its not something I've done before. Thank you

    Read the article

< Previous Page | 199 200 201 202 203 204 205 206 207 208 209 210  | Next Page >