Search Results

Search found 25521 results on 1021 pages for 'microsoft word 2007'.

Page 240/1021 | < Previous Page | 236 237 238 239 240 241 242 243 244 245 246 247  | Next Page >

  • Best way to export powerpoint slides into pngs with different resoltuions?

    - by Henrik
    I am trying to convert powerpoint slides into a png. I know that there are several ways that allow to do this by allowing for changing the resolution (e.g., within powerpoint by changing the registry, or using pdf printers as proposed here and here). However, always changing the registry is cumbersome and using the pdf printer (bullzip printer and pdfforge) is not working as expected. Does anyone know of easy, free and reliable way to export powerpoint (2010) slides into png pictures while allowing to easily change the resoltuion?

    Read the article

  • Pivot Table grand total across columns

    - by Jon
    I'm using Excel 2010 and Power Pivot. I'm trying to calculate confidence and velocity for a development team. I'm extracting some information from our time and defect system each day and building a data set. What I need to do with Excel is do the calculations. So each day I add to my data set 1 row per task in the current project, estimate for that task and the time spent on that task. What I want to calculate is the estimate/actual for each task but also for each person. The trouble is that each day the actual is cumulative so I need to pick out the maximum value for each task. The estimate should remain unchanged. I can make this work at the task level with a calculated measure (=MAX(worked)/MAX(estimate)) but I don't know how to total this up for a person. I need the sum of the max worked for each task. So a dataset might look like: Name Task Estimate Worked N1 T1 3 1 N2 T2 3 1 N3 T3 4 1 N1 T1 3 2 N2 T4 5 1 N3 T3 4 2 N1 T5 1 2 N2 T6 2 3 N3 T7 3 2 What I want to see is for task T1 2 days were worked against an estimate of 3 days - so 2/3. For person N1 I want to see that they worked a total of 4 days against an estimate of 4 days so 4/4. For person N2 they worked 5 days for an estimate of 10 days. Any ideas on how I can achieve this?

    Read the article

  • IPv6 Addresses causing Exchange Relay whitelists to fail

    - by makerofthings7
    Several of our new Exchange servers are failing to relay messages because it is communicating over IPv6 and not matching any receive connector I previously set up. I'm not sure how we are using IP6 since we only have a IPv4 network and we are routing across subnets. I discovered this by typing helo in from the source to the server that is confused by my IP6 address. I saw the IPv6 message and the custom message I gave this receive connector. (connectors with more permission have a different helo) 220 HUB01 client helo asdf 250 HUB01.nfp.com Hello [fe80::cd8:6087:7b1e:99d4%11] More info about my environment: I have two dedicated Exchange forests each with a distinct purpose. They have no trust and only communicate by SMTP. They both share the same DNS infrastructure via stub zones. What are my options? This is my guess, but I'm no IPv6 expert so I don't know which one is the best option Disable IPv6 Add the IPv6 address to the whitelist (isn't that IP dynamic?) Tell Exchange to use IPv4 instead Figure out why we are using IPv6 instead of IP4

    Read the article

  • Excel transpose via paste

    - by David Oneill
    I want to transpose data in Excel. Normally, I cut the cells I need, and use paste special - transpose. However, sometimes when I do paste special, a box comes up asking me if I want to use unicode text vs normal text. How do I transpose this text? Is there a way to get past the unicode dialog box and get to the normal Paste special dialog box (that has the 'transpose' option)? Or, is there another simple way to transpose cells? transpose = flip rows and columns IE 1, 2, 3 becomes: 1 2 3

    Read the article

  • Outlook / Gmail 'too many simultaneous connections' error

    - by sam
    I'm just setting up Outlook for Mac, and I'm trying to add a Google Apps application for business email (Gmail). I've set it up correctly (same details worked in Mac mail). But I keep getting two errors, either or just a error asking for the username and password again. Just to confirm the user name and password are correct, although when I go into menu command Tools - Account and look in the password field for that account it's blank. But if I just click cancel on the popup asking for my username password it just continues to get mail in the background for about 30 seconds, before again asking again for the password, or showing the above error which I can click 'yes' to and again it will get the mail. But after 30 seconds it does the same thing. I've got two other accounts set up fine, one a horde account (hosted webmail using POP3) and the other a iCloud .me account running on IMAP. What might be causing this and how I can remedy it? A bit more background: the machine is a MacBook Pro running Mac OS X v10.7 (Lion). Update 2013-11-02 I've updated Outlook to SP3, but I still get the same error.

    Read the article

  • How to sum cells depending on the content of a neighbor cell

    - by dannymcc
    I have an Excel document with the following columns; Date | Reference | Amount 23/01/11 | 111111111 | £20.00 25/09/11 | 222222222 | £30.00 11/11/11 | 111111111 | £40.00 01/04/11 | 333333333 | £10.00 31/03/11 | 333333333 | £33.00 20/03/11 | 111111111 | £667.00 21/11/11 | 222222222 | £564.00 I am trying to find a way of summarising the content in the following way; Reference : 111111111 Total: £727 So far the only way I have been able to achieve this is to filter the list by each reference number (manually) and then add a simple SUM formula to the bottom of the list of amounts. Are there any tricks that anyone knows that may speed this up? What I am trying to achieve is a spreadsheet that highlights each reference number that collectively exceeds over £2,000.

    Read the article

  • How to make project auto-estimate duration based on work?

    - by Bruno Brant
    This one has bothered me for a long while. I like to do estimates thinking on how much time a certain task will take (I'm in TI business), so, let's say, it takes 12 hours to build a program. Now, let's say I tell Project that my beginning date is today. If I allocate one resource to this task, it means that the task will last 1,5 days, implying that it will end tomorrow. But right now, that is not what it's doing. I say that the task will take 1 hour, and when I add a resource to it, it allocate the resource at [13%] basis, which means that the duration is still fixed... project is trying to make the task last for a day. I have, on many occasions, accomplished this. What I do is build a plan based on these rough estimates for effort, then I allocate tasks to resources. Times conflict, so I level resources and then Project magically tells me how long, in days, will it take. But every time I have to start estimating again, I end up having trouble on how to make project work like that.

    Read the article

  • Spreadsheet application that can handle big data OS X

    - by Peter
    I've been working with Excel for quite a while for some statistical analysis that I do regularly. The size of the data that I'm working with has gotten much larger as of late, however. The layout of the databases in question is quite simple, usually just three rows which includes a UNIX timestamp, and EST value, a proprietary numeric value and finally an average of the rows that have a timestamp +/- 1000 that row's timestamp (little AVERAGEIFS() formula). That formula and the EST conversion are the only formulas in the sheet. I'm beginning to work with files with 500,000+ rows. Running the average formula down the entire row takes forever. The end result is the production of print-worthy graphs. I'm looking for either a UNIX CL utility or separate spreadsheet/database application that can handle this amount of data without melting my CPU or making me wait an hour. Is there anything out there? TL;DR: Simple excel sheet with over half a million rows is getting too slow to work with. OS X alternatives?

    Read the article

  • Is there a way to sort digits within a cell?

    - by Iszi
    I'd like to know if there's an Excel Function, or a formula, that can be used to sort digits within a cell. For example, if the value of A1 is 6193254807 and B1 has our formula with parameters set to sort ascending then B1 should equal 0123456789 (leading zero included). Of course, if the parameters were set so that it would sort descending then B1 should equal 9876543210. Is there a way to do this, without wandering into VBScript, or macros, or something similarly exotic?

    Read the article

  • Data capture from other sheet into Summary sheet

    - by Hemant
    an Excel workbook which has Summary sheet, Pending and Master Sheet. My requirement is below and try to develop a Macro or VB logic for excel • I want to control this workbook from Summary sheet. o Generate Fault Summary – ? I have set logic but if doesn’t give warning if sheet name is exists , so need to add this logic . ? When we press the Fault Report Summary command button then it copy the master sheet with cell “A6” Name and will hide the Master sheet. Again when you select the another Month name then it will generate the sheet for that month name. o Generate Toll System Uptime ? When I select the sheet name and “Week” then Press the “Enter “Command button then it should get the result from that sheet number . Each sheet number has Month detail in B2 Cell. ? To calculate the Uptime formula for Week wise is • Week-01 = (1680-SUMIFS(L5:L23,B5:B23,"="&B2,B5:B23,"<="&(B2+6)))/1680 • Week-02 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+7),B5:B23,"<="&(B2+13)))/1680 • Week-03 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+14),B5:B23,"<="&(B2+20)))/1680 • Week-04 =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2+21),B5:B23,"<="&(B2+27)))/1680 • Month =(1680-SUMIFS(L5:L23,B5:B23,"="&(B2),B5:B23,"<="&(DATE(YEAR(B2),1+MONTH(B2),1)-1)))/1680 ? Result should reflect in Summary sheet at B18 cell . o Pending Fault Report Summary ? When segregate the report on its status like which one is open or Close . It is open then it is Pending Fault Report and when it is Close status it means it is closed. ? If any fault which has OPEN status in all sheets(Jan-13,Feb-13,Mar-13….etc) then it should be come as well as in Pending Sheet which ascending date order. ? When it’s status is changed then it should be moved in that month sheet or nearby fault created date. It status is close then it should not be available in pending sheet as it’s status is Closed. ? Each fault has Reported date and we monitor all fault according reported date. ? When we press the Update Fault Report Summary command button then it should update as above logic. ? Some time we export the Pending fault report , so date calendar should be present in Start and End date to Choose the date. When we press the Export command line then it should export the Pending fault report and able to save in Excel,PDF.

    Read the article

  • Data Validation of a Comma Delimited List

    - by Brad
    I need a simple way of taking a comma seperated list in a cell, and providing a drop down box to select one of them. For Example, the cell could contain: 24, 32, 40, 48, 56, 64 And in a further cell, using Data Validation, I want to provide a drop-down list to select ONE of those values I need to do this without VBA or Macros please. Apolgies, I want this to work with Excel 2010 and later. I have been playing around with counting the number of commas in the list and then trying to split this into a number of rows of single numbers etc with no joy yet.

    Read the article

  • clear contents from matched column of data in another sheet

    - by Peta
    I have a column of email addresses on sheet 2 col A (but I could put them on sheet 1 if it would make it easier / faster) that I want to remove from sheet 1 col D if matched (there may be 2 or more occurences of the same email to be removed/cleared). (1000s of rows in each sheet). After all day searching forums I’m getting more confused & can't find what I'm looking for. Not sure whether to use .match or .find & .ClearContents & the syntax for iterating through. Thanks very much in anticipation Peta

    Read the article

  • How do I create a dynamic formula on Excel?

    - by Mario Marinato -br-
    On Excel, I have a DDE formula on B1 which reads =server|info!someText.data I want to change the formula so that someText is written on A1 and then reference it on the DDE formula. Something like =server|info!A1.data. I have tried to concatenate "A1" directly on the formula, as it is above, with no success. Some other things I tried were =server|info!A1&".data" and =server|info!indirect(A1)&".data", but had no success. Is there a way to achieve this? How?

    Read the article

  • Problems when pasting Outlook 2010 signature logo into message body

    - by Austin ''Danger'' Powers
    Whenever I paste my company logo into a message in Outlook 2010, I run into a variety of complications and anomalies. The dimensions of my original logo image are 315x174 (source image is a PNG file). I am scaling this image down in Photoshop CS6 to a variety of smaller sizes for testing my Outlook signature (300x166, 250x138, 200x110,150x83 and 100x55 pixels). 300x166 = no distortion. This looks the same as in Photoshop (but far too large to use in my signature). 250x130 = distorted (gets stretched much wider by Outlook when pasting into message body). 200x110 = looks reasonable, but seems to have been scaled to a different size (smaller) by Outlook for no obvious reason. 150x83 = for some reason, this is scaled by Outlook to the exact same size that 200x110 was scaled to. In fact, a large range of similar dimensions are scaled to the exact same image size by Outlook. This is very frustrating. Why is this happening and what can be done to prevent it? 100x55 = when pasting my logo from Photoshop to Outlook with these dimensions all that happens is the cursor jumps forwards about an inch on the screen, leaving a blank space where the image was supposed to go. Any advice would be much appreciated.

    Read the article

  • Add Excel column without breaking equation

    - by CRAIG
    I have completed a very complex Excel spreadsheet with a lot of equations, except ... I forgot to include September I have Jan through Dec, all the months, except the calculations for September. Of course all the equations are currently perfect for the data that's here. How do I add a whole new column without ruining the previous equations? PS: tomorrow is my holidays and I have to go to work to finish this table, so bad

    Read the article

  • Virtual Server 2005 R2 kungfu

    - by AngryHacker
    Does Virtual Server 2005 R2 have a command line interface, that's versatile enough? Here is a situation. I run a Win2k VM on an old memory constrained machine. I allocate it 378MB of RAM and the VM runs just fine. Once a month, inside the VM, I backup the (a very large) database, compress it using 7Zip and ftp it to the backup site (all in a script). Unfortunately the compression part takes a massive amount of RAM (far exceeding the 378MB), it goes for the paging file and brings absolutely everything to a crawl and literally takes 2-3 days, if left unattended. So to fix this, I have to shutdown the VM, give it temporarily 768MB of RAM and then the whole thing finishes in 20 minutes. So, is there a way do the following automatically from the host machine in a script? Shutdown the guest OS (I think, I got this part) Change the RAM allocation from 378 to 768 Start the guest OS again then, 1 hour later, do everything in reverse.

    Read the article

  • Expression Web 3 - Set Thesaurus

    - by Guy Thomas
    I have recently upgraded from Expression 2 to 3. It's much better, but I cannot get the Thesaurus to work. It worked fine before the upgrade. Precise error message 'No thesaurus is available for English (United Kingkdom)' I am indeed, in the UK. I have set Tools Page Editor Options to first UK and then USA - no joy. In truth I don't mind the US thesaurus, it would certainly beat 'No thesaurus'

    Read the article

  • Specifying Multiplicity in a Visio Database (ERD) Diagram

    - by Nitrodist
    Is there a way to manually edit the cardinality/multiplicity symbols on the end of a database ERD made in Visio? The category I'm using is in Visio 2003 under Database -> Database Model Diagram I want to be able to go from something like this: To this: The second graphic was done by manually adding the numbers, but I would prefer to just do it in Visio. Is there any way of accomplishing this?

    Read the article

  • Cannot view dates of emails(no date field), in my CSV file exported from MS Outlook

    - by barlop
    I am using Outlook 2010 - I have my emails showing in there. and exported my emails, into a csv file. (file..options..advanced...export..export to a file.. I have opened that csv file in excel Here is a list of the fields it shows. I see "Date" doesn't appear among them. Subject Body From: (Name) From: (Address) From: (Type) To: (Name) To: (Address) To: (Type) CC: (Name) CC: (Address) CC: (Type) BCC: (Name) BCC: (Address) BCC: (Type) Billing Information Categories Importance Mileage Sensitivity Any idea why "Date" isn't included, and how to include it? Also, (and less importantly, and as a very secondary issue) is there a convenient way to read the csv file? reading an email with a long body, in excel, is not convenient, I need to select all of the body from the cell and copy/paste it into notepad.

    Read the article

  • Simple (I hope) Excel question about

    - by Princess
    I am doing a directory for my neighborhood. We had most of the information from a previous directory. The information was entered: A1 name, B1 address and C1 phone number; B1 name, B2 address, C2 phone number etc. The publisher wants the information in a different format A1 name, A2 address, A3 phone number, A4 blank; A5 name, A6 address, A7 phone number, A8 blank etc... Is there an easy (or heck - a not so easy) way to have Excel change the format of the information without me having to hand type 1300 households information? I will also need to reformat the information a second time into a crisscross. The format for that one is: A1 Street name, A2 Address Number, B2 Resident Name and C2 Phone number.

    Read the article

  • Excel annoyance: How to maintain formulas in a ledger?

    - by davidcl
    A common use of Excel is to create a spreadsheet which functions as a transaction ledger of some kind, where one or more fields in each row is calculated by adding a value or values from the current row to a value from the previous row. For example, if column C holds the value of a transaction and column D holds the balance, then the formula in row D3 might be =D2+C3. This formula would be repeated for every row in the ledger. A common annoyance when maintaining this type of spreadsheet is that if you insert a row into the middle of such a ledger, that row may be skipped when calculating the balance-- the formulas in the subsequent row have to be updated along with the formulas in the inserted row. Do you have any techniques for avoiding these problems?

    Read the article

  • What's Excel formats are (most) compatible with LibreOffice and Google Docs?

    - by iconoclast
    I use Excel (and occasionally Numbers), but I want to be able to share with users of Google Docs and LibreOffice (and I may want to switch in the future). What's the most compatible format to save my Excel spreadsheets in? I'm asking as a question here rather than merely Googling for a list of formats that LibreOffice and GoogleDocs support (although I'm doing that too, and will post the answer if no one else does) because there are likely to be hidden "gotchas" that only someone who has experience using all of the above applications is going to know about. Answers that include personal experience will be preferred over those that only post a link to the relevant facts on google.com and libreoffice.com. Oh, and of course the other reason I'm asking the question is because it's good to have this info readily available on SuperUser.com for anyone else who wants to know the same thing.

    Read the article

  • Vacation scheduler/viewer

    - by Norfeldt
    I'm looking for a solution that allows multiple persons to put plan and notify their vacation by putting it in their electronic calendar and invite a dedicated "robot" email. On the other side I should be able to get a quick overview of the vacation for each person and do a print out that allows me to put it on a board. Example: John puts his winter vacation for week 7 into his calendar and invite [email protected]. Ben does the same thing for week 4 and 5 and invites [email protected]. Dilbert host the [email protected] and prints out and overview for the next 3 months. Each person's vacation is either stated by name or/and color on the print out. I would like to do the thing with standard business software like Outlook 2010 without installing too many softwares. But at the same time it should be easy and quick to make the print outs without too much fiddling Am I dreaming ?

    Read the article

  • How to delete specific columns from all excel workbooks in a particular folder

    - by Firee
    I have a folder in which I have about 30 excel files. In each of these files, I need to delete about 20 specific columns. Here are some details: I am using Excel 2013 The columns are in the first sheet of the excel file. each file can have several sheets, but the columns that need to be deleted are in the first sheet. Here are the names of the columns but please note, the columns are sometimes repeated: Heather National Light General Louisa Terruin Would love some help.

    Read the article

  • Pivot Table from data with merged cells

    - by Graeme
    I have a energy spreadsheet for multiple sites. the first row has month and year. the next row has columns for date invoice received, KW hours and cost. So there are three columns for each month. I have merged the month cell across the three columns. When i create a pivot table the date kw/h and costs are labled date1, date2, etc. Can I link the months headings to the subheadings to get meaningful headings in the pivot table????

    Read the article

< Previous Page | 236 237 238 239 240 241 242 243 244 245 246 247  | Next Page >