Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 113/1407 | < Previous Page | 109 110 111 112 113 114 115 116 117 118 119 120  | Next Page >

  • spring security filter-chain regex pattern

    - by lewap
    In my application which uses spring security I want to define two different areas both using their own spring security filter-chain. My question is: is it possible to define two regex expressions as follows: every path starting with /foobar/* every other path not starting with /foobar The important part here is that the second path should also match if somewhere within it, but not in the beginning, it cotains the /foobar/ string. Thanks

    Read the article

  • Term for releasing software with time dependant portions still unfinished.

    - by Jeremy French
    I remember a while a go on a SO podcast Jeff was talking about the bounty system and he said that they released the bounty offering code before the bounty awarding code was written as the code would not be needed for a couple of weeks. Is there a standard term for this? Agile can work in this way but it doesn’t have to. I am thinking of suggesting it to a client for something and would like to use the correct terminology along with any information backing it up as a method. Essentially the method is to release code with some functionality incomplete as the time until the incomplete functionality is needed is less that the time it will take to develop.

    Read the article

  • Hard Coded Paths in a .NET Program

    - by maya
    I am developing an application in C#. I have a folder called myfolder it contains a file called mypoints.bmp. The folder myfolder is in my project folder it is in D drive. The path is D:\Myproject\myfolder\mypoints.bmp. Now, in my program, whereever I need mypoints.bmp I have hardcoded the whole path. When my project is copied in to a different system under C drive, I am not able to run my project because of the hardcoded path. How can I give the path so that there will not be any problem even if it is loaded in to a different system under a different drive.

    Read the article

  • What's the smallest DirectX installer I can distribute in my Software?

    - by John
    My application uses DirectX 9.0c. There are many installers for the end-user run-times, ranging from 400Kb to 100Mb+ and obviously I don't want to bloat my installer file. However, I believe there are potentially legal restrictions which mean I can't just distribute whichever MS installers I might choose. This is the one I'd ideally like to include, is it the best /correct one?

    Read the article

  • Paths when both including and requesting AJAX

    - by Cristian
    I was wondering if there is a way of making a relative path to the main folder (where the index.php lies) from every file that needs to be included or requested by AJAX. I want to combine both AJAX and PHP include so first time the page loads with PHP, and then to be able to refresh parts of the page with AJAX, but the files are the same and lie in subfolders. I'm having problems with the path and although I can set an absolute path, then I have to change it every time the server changes. I want a relative path to where my project is, but not DOCUMENT_ROOT, because that one doesn't work with aliases. (or do you know how to make it work with aliases? ) Thanks !

    Read the article

  • Is a commercial licensing tool better than a home grown solution for licensing a software product.

    - by Kalpak
    Hi, We are developing a product in C#.Net. We would definately not like our product to be copied easily across machines (in short pirated). For that purpose can anybody suggest using a 3rd party tool or a home grown solution. What are the pros and cons of each. One negative about home grown solution is that the cost involved in creating one from scratch. Can somebody comment on the technology to be used for licensing as .Net can be decompiled.

    Read the article

  • Bash script to find a directory, list it's contents and sub-folders info

    - by lithiumion
    Hi I want to write a script that will: 1- locate folder "store" on a *nix filesystem 2- move into that folder 3- print list of contents with last modification date 4- calculate sub-folders size This folder's absolute path changes from server to server, but the folder name remains the same always. There is a config file that contains the correct path to that folder though, but it doesn't give absolute bath to it. Sample Config: Account ON DIR-Store /hdd1 Scheduled YES ?According to the config file the absolute path would be "/hdd1/backup/store/" I need the script to grep the "/hdd1" or anything beyond the word "Config-Store", add "/backup/store/" to it, move into folder "store", print list of it's contents, and calculate sub-folders size. Until now I manually edit the script on each server to reflect the path to the "store" folder. Here is a sample script: #!/bin/bash echo " " echo " " echo "Moving Into Directory" cd /hdd1/backup/store/ echo "Listing Directory Content" echo " " ls -alh echo "*******************************" sleep 2 echo " " echo "Calculating Backup Size" echo " " du -sh store/* echo "********** Done! **********" I know I could use grep cat /etc/store.conf | grep DIR-Store Just don't know how to get around selecting the path, adding the "/backup/store/" and moving ahead. Any help will be appreciated

    Read the article

  • C# (non-abstract) class to represent paths

    - by user289770
    I'm looking for a C# class that represents a file system path. I would like to use it (instead of strings) as the data type of variables and method arguments (top reasons: type safety, concat-proof, logical comparisons). System.IO.Path provides most of the functionality I want, but it is abstract. System.IO.FileInfo, as I understand, performs IO operations to do its job. I only want a wrapper for the path string. Thanks!

    Read the article

  • IntegrationTests - A potentially dangerous Request.Path value was detected from the client

    - by stacker
    I get this error: A potentially dangerous Request.Path value was detected from the client (?). when this URI: http://www.site.com/%3f. How can I write a integration test for this type of errors. I want to test against all this erros: A potentially dangerous Request.Path value was detected from the client A potentially dangerous Request.Cookies value was detected from the client A potentially dangerous Request.Form value was detected from the client A potentially dangerous Request.QueryString value was detected from the client

    Read the article

  • qt qmake mkspecs relative path

    - by Fabien Bernede
    Hello, when I compile Qt with Windows SDK 7.0, I use : configure.exe -shared -platform win32-msvc2008 -ltcg -no-dsp -no-vcproj nmake ...no error occured. But when I move or change name of my Qt folder, qmake.exe said me makespec is not defined, so I configure my QMAKESPEC to win32-msvc2008, I try again, but now it said me it cannot find mkspecs folder, it try to find this folder only where I compiled Qt (absolute path), I want qmake.exe use relative path : ../mkspecs/ not C:\qt-4.6.2\mkspecs. How can I solve this issue ?

    Read the article

  • C# - Shortest path map finding

    - by nXqd
    I try to write a simple program in C#, it's like map finding . I've a picture of city / or district ( it's const ) and I'll add a database to this program to store variables, points . I use floyd to find the shortest path and I'll draw the path in the image ( by coordinates I think ) . This is the first time I write a real program in C# so how should I implement this one ;) Thanks so much for reading !

    Read the article

  • Which career path to take to get hired by big companies like Google and Microsoft

    - by Wonder
    I am in second year computer science program. This summer I am starting a quality database developer position at RIM for 8 months. My goal is to work as a software developer (architect or consultant eventually) at Google. After this 8 months, I am still going to do 12 months of co-op. In which direction should I be trying to steer my career in? Is there any certain positions (other than software developer) or companies I should work for?

    Read the article

  • [python]: path between two nodes

    - by www.yegorov-p.ru
    I'm using networkx to work with graphs. I have pretty large graph (it's near 200 nodes in it) and I try to find all possible paths between two nodes. But, as I understand, networkx can find only shortest path. How can I get not just shortest path, but all possible paths?

    Read the article

  • How retrive full path with file name or folder name in Delphi 2010

    - by Dev
    Sir, I create a project, where I use ShellTreeView, ShellListView, ListView. Now I drag folder from ShellTreeView and files from ShellListView. Now I want to retrieve file name including full path (like: c:\abc\file.txt) or folder (like C:\abc). For retrieving the path I use a command button and a text box. What will the code? Dev

    Read the article

  • Getting the relative path

    - by Brigadier Jigar
    I have to fetch all the files from a folder and i am using the function GetFiles() like string[] dirImages = Directory.GetFiles(strPathYearImages + intYear , "*.png"); where strPathYearImages="Images\Holiday\2010\" but when i write the whole path like string[] dirImages = Directory.GetFiles(@"E:\IWP\Images\Holiday\"+ intYear , "*.png"); i get the required result. How to solve this problem? I dont want to use the whole path. Help me out. Regards, Jigar <3

    Read the article

  • how to locate path (mobile) c#

    - by tike
    hi, i was trying to locate specific path for a picture (that i want to include) in mobile application (web server). and in terms of doing that i did this.. image src= \\program files\myprogram\a.jpg is that how it works is mobile device? to sum up, i was stuck being unable to display picture from specific path. any help appreciated thanks

    Read the article

< Previous Page | 109 110 111 112 113 114 115 116 117 118 119 120  | Next Page >