Search Results

Search found 5830 results on 234 pages for 'nuclear power plant'.

Page 12/234 | < Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >

  • Power supply issue? New Radeon5850's fan runs at full speed and PC doesn't boot.

    - by Kris
    I recently bought a new ASUS EAH5850 graphics board. I installed it a custom PC which had an ASUS p5n-e SLI mobo along with a 500w Thermaltake W0093RU power supply. Sometimes when doing a cold boot the 5850's fan will run at full speed and the PC will not boot. Powering off by holding down the power button and powering back on sometimes remedies the situation and everything boots normally. Warm reboots also never seem to have problems. For some reason though cold boots almost always do. Another issue I notice is that when the PC does boot normally it takes longer (+30 secs) to POST than with my last video card. I flashed the mobo with the latest available BIOS but it had no effect. Is my problem a power issue or incompatible motherboard or something else I'm missing?

    Read the article

  • How can I guess if a USB cable will power my devices?

    - by rsanchez
    I've had problems with one long (4 meter) USB Mini-B to USB Type-A cable not being able to boot a 2.5'' external hard disc due to not supplying enough current. On top of that, the cable used a Type-A to Mini-B adapter for the Mini-B part, which probably made things worse. Three different shorter cables I got around made the hard disk work without extra current, so it was definitively the cable's fault. However, if I plugged the hard disk to the power, and used the long cable just for data it worked. Here is some related information on powering through USB cables: http://www.girr.org/mac_stuff/usb_stuff.html I have not any long cables that don't have an intermediary Type-A to Mini-B adapter to try them out. My question is: is there a way to guess if a cable will provide enough power for charge/disk drive power? Is it related to the length of the cable, to the build quality of the cable, or the fact that uses intermediary adapters?

    Read the article

  • Power outage during disk wipe. What do I do now?

    - by Mark Trexler
    I was using Roadkil Diskwipe on an external hard drive and the power went out. I had removed it from any outlet connection by the time power was restored to prevent power-spike damage (it's on a surge protector, but I didn't want to rely on that). My question is, where do I go from here? Obviously I don't care about preserving any data currently on it, I just want to make sure the drive itself is not terminally damaged. I'm running chkdsk (full), but I don't know if that's the correct step to assessing any damage. If it makes any difference, the hard drive was unallocated at the time of the outage, as Diskwipe requires that for it to run. Also, could something like this cause latent problems with the drive itself (i.e. serious issues that I won't be aware of when testing it now). I'd appreciate any program recommendations if chkdsk is not the most appropriate diagnostic route. Thank you.

    Read the article

  • Suspend only works once after full power cycle with ASUS P7P55D-E Pro

    - by John Chadwick
    This one is strange. I can't seem to get suspend working more than once per power cycle. When I say "power cycle," I mean the only way to get one proper suspend is to cut power from the power supply and boot back up cold. After the proper suspend, I get a failed suspend, and after all reboots or cold boots until power is cut, suspends fail. I'm using an ASUS P7P55D-E Pro with a Sandy Bridge Core i7, running on Ubuntu Precise repositories and UEFI. I'm running Nouveau from repository (And Gallium3d compiled from git, but that does not come into this since I can avoid OpenGL and it still happens the same way) with a GTX 285 (nv50.) I had to build a custom kernel (3.3) in order for ACPI 5.0 to be supported and make suspend work at all. I compiled it using the latest Ubuntu kernel's config file with the additional entries set to the default options. All packages are up to date. I know these are relatively exotic settings, but I'm hoping maybe I can get some help anyways. The behavior when suspend fails is strange. Upon a proper suspend, all fans turn off and the only led left on, the power led, is blinking. Upon a failed suspend, 1. USB power remains. 2. The power led stays on solid. 3. All fans seem to still be on. 4. I can hear what I believe is the primary harddrive shutting off. 5. Despite USB power remaining, the USB powered keyboard does not respond to anything, and the indicator leds on it shut off. Pressing the power button does nothing, and of course I have not to date found a way to wake it up. When trouble shooting the first round of issues I got with suspend not too long ago, I ended up building a list of modules to disable upon sleeping. Here's my config file for them: In /etc/pm/config.d/01modules: SUSPEND_MODULES="uhci_hd ehci_hd button" All of my other pm configuration files are stock. In case it's any help, here are my relevant BIOS settings. Thanks.

    Read the article

  • Hard Disk Spins Down as long as Battery is in Laptop

    - by Brock Dute
    Hi, I just figured out today that as long as the battery is in my laptop, it doesn't matter if it's fully charged while plugged in, Ubuntu always spins down my hard drive. I noticed this because there was a huge difference in speed when I removed the batteries. My settings for power management is basically: on AC power, don't spin down harddrive, dont suspend or anything on battery power, basically save as much power as possible I assumed that if I plug in my laptop, it'll use the On AC Power settings no matter what but apparently, this isn't so. Is there a way to "fix" this?

    Read the article

  • Power button missing

    - by Christophe De Troyer
    An almost clean install of Ubuntu 13.10 keeps hiding the power button. I noticed before that my clock and power button were missing in the right top corner. I rebooted my system and they were back. Now I see my power button only is missing. How do I go about fixing this? I can't keep rebooting, can I? The latest thing I did was removing Ubuntu One: Removing Ubuntu One I don't think I did something that might've tinkered with these settings though.

    Read the article

  • Sudo Non-Password access to /sys/power/state

    - by John
    On my computer, pm-hibernate appears to be broken, however using the command echo disk > /sys/power/state appears to work perfectly. Now I just need regular user access to it, using sudo. How do I do this? The command sudo echo disk > /sys/power/state simply returns bash: /sys/power/state: Permission denied. Also, I need this in a regularly used script, how can I make it so that I don't have to type in my password for it to work???

    Read the article

  • battery icon / power indicator not shown in menu bar after upgrade to 12.04

    - by user488728
    since the upgrade from 11.10 to 12.04 the battery icon / power indicator is not shown any more in the menu bar. I went to 'system settings'--'power' and tried to set 'show battery status in menu bar' to 'always', however the selection button seems to be corrupt. Strangely, when I open the power settings dialog, the 'show battery status in menu bar' field is set to an empty string instead of showing one of the three possible choices. When I click on the small arrow next to it, the three possible choices are shown. Whatever I select, upon closing the settings dialog and reopening it, the selection field is back to empty. Please help. Thanks! HF

    Read the article

  • Blinking power button

    - by Mike Ramsey
    A friend asked me to look at his Gateway DX4640 desktop. When he presses the power button, power goes to the mobo (NVIDIA nForce 630i MCP73PV, GeForce 7100 chipset) and the CPU fan starts spinning. The power button slowely blinks on and off (blue) and the screen briefly says no signal and then goes black. And nothing else; no post code beeps. My initial two conjectures were: 1. Vista was stuck in sleep/hibernation mode, or 2. A power off had left the mobo in a bad state. The fix for both is to: a) Unplug the AC power cord b) hold the power button for 30 second to fully discharge the mobo It didn't help. I left the system unplugged from AC power for an hour. No change. I am out of ideas. Has anybody seen anything like this before? What does a blinking blue power button mean? How can I get more data points to guide trouble shooting? --Thank you, --Mike

    Read the article

  • Is the difference between superuser and serverfault basically when you can do a power cycle?

    - by wag2639
    Generally speaking, aren't there a lot of problems that can be fixed with just a simple power cycle? Especially with Windows, a reboot will solve the problems (at least temporarily)? So, would this be the difference between serverfault and superuser? Generally, where as a superuser might just be annoyed by a restart/power cycle, a sysadmin cannot because its a critical system or otherwise production box?

    Read the article

  • Can a 300W power supply support two additional hard drives?

    - by Josh
    I am thinking of purchasing the Dell I580-5108NBC, but I want to add 2 1TB SATA drives in a RAID5 config. The system only has a 300W power supply, and already has a 1TB drive and a DVD burner. Is the 300W power supply sufficient to support two additional drives, or should I upgrade it? Or, can I simply unplug the DVD burner?

    Read the article

  • Integrating Oracle Hyperion Smart View Data Queries with MS Word and Power Point

    - by Andreea Vaduva
    Untitled Document table { border: thin solid; } Most Smart View users probably appreciate that they can use just one add-in to access data from the different sources they might work with, like Oracle Essbase, Oracle Hyperion Planning, Oracle Hyperion Financial Management and others. But not all of them are aware of the options to integrate data analyses not only in Excel, but also in MS Word or Power Point. While in the past, copying and pasting single numbers or tables from a recent analysis in Excel made the pasted content a static snapshot, copying so called Data Points now creates dynamic, updateable references to the data source. It also provides additional nice features, which can make life easier and less stressful for Smart View users. So, how does this option work: after building an ad-hoc analysis with Smart View as usual in an Excel worksheet, any area including data cells/numbers from the database can be highlighted in order to copy data points - even single data cells only.   TIP It is not necessary to highlight and copy the row or column descriptions   Next from the Smart View ribbon select Copy Data Point. Then transfer to the Word or Power Point document into which the selected content should be copied. Note that in these Office programs you will find a menu item Smart View;from it select the Paste Data Point icon. The copied details from the Excel report will be pasted, but showing #NEED_REFRESH in the data cells instead of the original numbers. =After clicking the Refresh icon on the Smart View menu the data will be retrieved and displayed. (Maybe at that moment a login window pops up and you need to provide your credentials.) It works in the same way if you just copy one single number without any row or column descriptions, for example in order to incorporate it into a continuous text: Before refresh: After refresh: From now on for any subsequent updates of the data shown in your documents you only need to refresh data by clicking the Refresh button on the Smart View menu, without copying and pasting the context or content again. As you might realize, trying out this feature on your own, there won’t be any Point of View shown in the Office document. Also you have seen in the example, where only a single data cell was copied, that there aren’t any member names or row/column descriptions copied, which are usually required in an ad-hoc report in order to exactly define where data comes from or how data is queried from the source. Well, these definitions are not visible, but they are transferred to the Word or Power Point document as well. They are stored in the background for each individual data cell copied and can be made visible by double-clicking the data cell as shown in the following screen shot (but which is taken from another context).   So for each cell/number the complete connection information is stored along with the exact member/cell intersection from the database. And that’s not all: you have the chance now to exchange the members originally selected in the Point of View (POV) in the Excel report. Remember, at that time we had the following selection:   By selecting the Manage POV option from the Smart View meny in Word or Power Point…   … the following POV Manager – Queries window opens:   You can now change your selection for each dimension from the original POV by either double-clicking the dimension member in the lower right box under POV: or by selecting the Member Selector icon on the top right hand side of the window. After confirming your changes you need to refresh your document again. Be aware, that this will update all (!) numbers taken from one and the same original Excel sheet, even if they appear in different locations in your Office document, reflecting your recent changes in the POV. TIP Build your original report already in a way that dimensions you might want to change from within Word or Power Point are placed in the POV. And there is another really nice feature I wouldn’t like to miss mentioning: Using Dynamic Data Points in the way described above, you will never miss or need to search again for your original Excel sheet from which values were taken and copied as data points into an Office document. Because from even only one single data cell Smart View is able to recreate the entire original report content with just a few clicks: Select one of the numbers from within your Word or Power Point document by double-clicking.   Then select the Visualize in Excel option from the Smart View menu. Excel will open and Smart View will rebuild the entire original report, including POV settings, and retrieve all data from the most recent actual state of the database. (It might be necessary to provide your credentials before data is displayed.) However, in order to make this work, an active online connection to your databases on the server is necessary and at least read access to the retrieved data. But apart from this, your newly built Excel report is fully functional for ad-hoc analysis and can be used in the common way for drilling, pivoting and all the other known functions and features. So far about embedding Dynamic Data Points into Office documents and linking them back into Excel worksheets. You can apply this in the described way with ad-hoc analyses directly on Essbase databases or using Hyperion Planning and Hyperion Financial Management ad-hoc web forms. If you are also interested in other new features and smart enhancements in Essbase or Hyperion Planning stay tuned for coming articles or check our training courses and web presentations. You can find general information about offerings for the Essbase and Planning curriculum or other Oracle-Hyperion products here (please make sure to select your country/region at the top of this page) or in the OU Learning paths section , where Planning, Essbase and other Hyperion products can be found under the Fusion Middleware heading (again, please select the right country/region). Or drop me a note directly: [email protected] . About the Author: Bernhard Kinkel started working for Hyperion Solutions as a Presales Consultant and Consultant in 1998 and moved to Hyperion Education Services in 1999. He joined Oracle University in 2007 where he is a Principal Education Consultant. Based on these many years of working with Hyperion products he has detailed product knowledge across several versions. He delivers both classroom and live virtual courses. His areas of expertise are Oracle/Hyperion Essbase, Oracle Hyperion Planning and Hyperion Web Analysis.  

    Read the article

  • WebCenter Customer Spotlight: Los Angeles Department of Water and Power

    - by me
    Author: Peter Reiser - Social Business Evangelist, Oracle WebCenter  Solution Summary Los Angeles Department of Water and Power (LADWP) is the largest public utility company in the United States with over 1.6 million customers. LADWP provides water and power for millions of residential & commercial customers in Southern California. The goal of the project was to implement a newly designed web portal to increase customer self-service while reducing transactions via IVR and automate many of the paper based processes to web based workflows for their 1.6 million customers. LADWP implemented a Self Service Portal using Oracle WebCenter Portal & Oracle WebCenter Content and Oracle SOA Suite for the integration of their complex back-end systems infrastructure. The new portal has received extremely positive feedback from not only the customers and users of the portal, but also other utilities. At Oracle OpenWorld 2012, LADWP won the prestigious WebCenter innovation award for their innovative solution. Company OverviewLos Angeles Department of Water and Power (LADWP) is the largest public utility company in the United States with over 1.6 million customers. LADWP provides water and power for millions of residential & commercial customers in Southern California. LADWP also bills most of these customers for sanitation services provided by another department in the city of Los Angeles.  Business ChallengesThe goal of the project was to implement a newly designed web portal that is easy to navigate from a web browser and mobile devices, as well as be the platform for surfacing internet and intranet applications at LADWP. The primary objective of the new portal was to increase customer self-service while reducing the transactions via IVR and walk-up and to automate many of the paper based processes to web based workflows for customers. This includes automation of Self Service implemented through My Account (Bill Pay, Payment History, Bill History, Usage analysis, Service Request Management) Financial Assistance Programs Customer Rebate Programs Turn Off/Turn On/Transfer of Services Outage Reporting eNotification (SMS, email) Solution DeployedLADWP implemented a Self Service Portal using Oracle WebCenter Portal & Oracle WebCenter Content. Using Oracle SOA Suite they integrated various back-end systems including Oracle Siebel CRM IBM Mainframe based CIS FILENET for document management EBP Eletronic Bill Payment System HP Imprint System for BillXML data Other systems including outage reporting systems, SMS service, etc. The new portal’s features include: Complete Graphical redesign based on best practices in UI Design for high usability Customer Self Service implemented through MyAccount (Bill Pay, Payment History, Bill History, Usage Analysis, Service Request Management) Financial Assistance Programs (CRM, WebCenter) Customer Rebate Programs (CRM, WebCenter) Turn On/Off/Transfer of services (Commercial & Residential) Outage Reporting eNotification (SMS, email) Multilingual (English & Spanish) – using WebCenter multi-language support Section 508 (ADA) Compliant Search – Using WebCenter SES (Secured Enterprise Search) Distributed Authorship in WebCenter Content Mobile Access (any Mobile Browser) Business ResultsThe new portal has received extremely positive feedback from not only customers and users of the portal, but also other utilities. At Oracle OpenWorld 2012, LADWP won the prestigious WebCenter innovation award for their innovative solution. Additional Information LADWP OpenWorld presentation Oracle WebCenter Portal Oracle WebCenter Content Oracle SOA Suite

    Read the article

  • Cross compilation of udns for power pc

    - by pragya
    I have libraries of x86 architecture that I want to cross compile for power pc. I have already cross compiled different libraries for power pc by setting environment variables for powerpc and using appropriate options with ./configure. Now, I want to cross compile libudns for powerpc. In ./configure --help I am not getting those appropriate options to cross compile. For libudns, I set environment variables for powerpc and ran ./configure but it throws following error: configure: fatal: $CC (powerpc-linux-gnu-gcc) is not a working compiler

    Read the article

  • Visual Studio 2010: Pro Power Tools

    - by Enrique Lima
    There is a set of Pro Power Tools released yesterday for Visual Studio 2010.  Check them out here. Brian Harry did a feature summary description on his blog.  Check it out here: http://blogs.msdn.com/b/bharry/archive/2010/06/07/announcing-the-first-visual-studio-pro-power-tools.aspx

    Read the article

  • Solving security issue in PowerPivot for SharePoint and Power View

    - by Marco Russo (SQLBI)
    I just installed a brand new server (well, a virtual machine) with SharePoint 2010 SP1 and SQL Server 2012 RC0, including PowerPivot and Reporting Services / Power View. The server is joined to the domain I use in our development environment. I published a workbook in the PowerPivot Gallery and my user was immediately able to connect, browse and navigate data of the Excel workbook published by SharePoint. Moreover, I was able to open it in Power View. However, other users failed the connection. After...(read more)

    Read the article

< Previous Page | 8 9 10 11 12 13 14 15 16 17 18 19  | Next Page >