Search Results

Search found 8166 results on 327 pages for 'seven year liberal arts degree'.

Page 178/327 | < Previous Page | 174 175 176 177 178 179 180 181 182 183 184 185  | Next Page >

  • Consistency vs Design Guidelines

    - by Adrian Faciu
    Lets say that you get involved in the development of a large project that is already in development for a long period ( more than one year ). The projects follows some of the current design guidelines, but also has a few different, that are currently discouraged ( mostly at naming guidelines ). Supposing that you can't/aren't allowed to change the whole project: What should be more important, consistency, follow the existing ones and defy current guidelines or the usage of the guidelines, creating differences between modules of the same project ? Thanks.

    Read the article

  • Getting segmentaion fault after destructor

    - by therealsquiggy
    I'm making a small file reading and data validation program as part of my TAFE (a tertiary college) course, This includes checking and validating dates. I decided that it would be best done with a seperate class, rather than integrating it into my main driver class. The problem is that I'm getting a segmentation fault(core dumped) after my test program runs. Near as I can tell, the error occurs when the program terminates, popping up after the destructor is called. So far I have had no luck finding the cause of this fault, and was hoping that some enlightened soul might show me the error of my ways. date.h #ifndef DATE_H #define DATE_H #include <string> using std::string; #include <sstream> using std::stringstream; #include <cstdlib> using std::exit; #include <iostream> using std::cout; using std::endl; class date { public: explicit date(); ~date(); bool before(string dateIn1, string dateIn2); int yearsBetween(string dateIn1, string dateIn2); bool isValid(string dateIn); bool getDate(int date[], string dateIn); bool isLeapYear(int year); private: int days[]; }; #endif date.cpp #include "date.h" date::date() { days[0] = 31; days[1] = 28; days[2] = 31; days[3] = 30; days[4] = 31; days[5] = 30; days[6] = 31; days[7] = 31; days[8] = 30; days[9] = 31; days[10] = 30; days[11] = 31; } bool date::before(string dateIn1, string dateIn2) { int date1[3]; int date2[3]; getDate(date1, dateIn1); getDate(date2, dateIn2); if (date1[2] < date2[2]) { return true; } else if (date1[1] < date2[1]) { return true; } else if (date1[0] < date2[0]) { return true; } return false; } date::~date() { cout << "this is for testing only, plox delete\n"; } int date::yearsBetween(string dateIn1, string dateIn2) { int date1[3]; int date2[3]; getDate(date1, dateIn1); getDate(date2, dateIn2); int years = date2[2] - date1[2]; if (date1[1] > date2[1]) { years--; } if ((date1[1] == date2[1]) && (date1[0] > date2[1])) { years--; } return years; } bool date::isValid(string dateIn) { int date[3]; if (getDate(date, dateIn)) { if (date[1] <= 12) { int extraDay = 0; if (isLeapYear(date[2])) { extraDay++; } if ((date[0] + extraDay) <= days[date[1] - 1]) { return true; } } } else { return false; } } bool date::getDate(int date[], string dateIn) { string part1, part2, part3; size_t whereIs, lastFound; whereIs = dateIn.find("/"); part1 = dateIn.substr(0, whereIs); lastFound = whereIs + 1; whereIs = dateIn.find("/", lastFound); part2 = dateIn.substr(lastFound, whereIs - lastFound); lastFound = whereIs + 1; part3 = dateIn.substr(lastFound, 4); stringstream p1(part1); stringstream p2(part2); stringstream p3(part3); if (p1 >> date[0]) { if (p2>>date[1]) { return (p3>>date[2]); } else { return false; } return false; } } bool date::isLeapYear(int year) { return ((year % 4) == 0); } and Finally, the test program #include <iostream> using std::cout; using std::endl; #include "date.h" int main() { date d; cout << "1/1/1988 before 3/5/1990 [" << d.before("1/1/1988", "3/5/1990") << "]\n1/1/1988 before 1/1/1970 [" << d.before("a/a/1988", "1/1/1970") <<"]\n"; cout << "years between 1/1/1988 and 1/1/1998 [" << d.yearsBetween("1/1/1988", "1/1/1998") << "]\n"; cout << "is 1/1/1988 valid [" << d.isValid("1/1/1988") << "]\n" << "is 2/13/1988 valid [" << d.isValid("2/13/1988") << "]\n" << "is 32/12/1988 valid [" << d.isValid("32/12/1988") << "]\n"; cout << "blerg\n"; } I've left in some extraneous cout statements, which I've been using to try and locate the error. I thank you in advance.

    Read the article

  • I have problems with adding rows to data-binded DataGridView in desktop app.

    - by Mishko
    DataTable table1 = new DataTable(); double brutoUkupno1 = 0; double porezUkupno1 = 0; double doprinosUkupno1 = 0; double netoUkupno1 = 0; double doprinosTeretUkupno1 = 0; double topliObrokUkupno1 = 0; double regresUkupno1 = 0; Connection con = new Connection(); table1 = con.boundTable(month, Convert.ToInt32(year)); //This is method which returns DataTable table1.Rows.Add(null, null, null, null, null, null, null, null, null, null, null, null, null, null); table1.Rows.Add(null, null, null, null, null, null, null, null, null, null, null, null, null, null); dgv2.Visible = true; dgv2.DataSource = table1; for (int i = 0; i < dgv2.RowCount - 2; i++) { topliObrokUkupno1 += Convert.ToDouble(dgv2.Rows[i].Cells[7].Value); regresUkupno1 += Convert.ToDouble(dgv2.Rows[i].Cells[8].Value); brutoUkupno1 += Convert.ToDouble(dgv2.Rows[i].Cells[9].Value); porezUkupno1 += Convert.ToDouble(dgv2.Rows[i].Cells[10].Value); doprinosUkupno1 += Convert.ToDouble(dgv2.Rows[i].Cells[11].Value); netoUkupno1 += Convert.ToDouble(dgv2.Rows[i].Cells[12].Value); doprinosTeretUkupno1 += Convert.ToDouble(dgv2.Rows[i].Cells[13].Value); //Now I am having problems with this below, putting things above to dgv2 : } dgv2.Rows[dgv2.Rows.Count - 1].Cells[0].Value = "Ukupno"; dgv2.Rows[dgv2.Rows.Count - 1].Cells[3].Value = month.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[4].Value = year.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[7].Value = topliObrokUkupno1.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[8].Value = regresUkupno1.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[9].Value = brutoUkupno1.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[10].Value = porezUkupno1.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[11].Value = doprinosUkupno1.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[12].Value = netoUkupno1.ToString(); dgv2.Rows[dgv2.Rows.Count - 1].Cells[13].Value = doprinosTeretUkupno1.ToString(); dgv2.Rows[dgv2.RowCount - 2].Height = 3; dgv2.Rows[dgv2.RowCount - 2].DefaultCellStyle.BackColor = Color.Black;

    Read the article

  • What Media Extender / Centre Set up should I use?

    - by Bryn Hird
    I have installed cat6 throughout the house which I use for telephony and network. In my cellar I have a NAS Server, gigabit switch and I want to install a Media Centre to stream my video's, music, photo's and live TV (coax from the aerial to the cellar) over the cat6. Yeah I know I can get stuff on the internet but shared experience of watching TV as a family as it happens is a big plus for live TV. I'm aiming for 1080p. I want different users to be able to watch different channels. Max users = 4. I've played a little with Windows Media Centre, works fine with live TV. Likewise I have XBMC up and running with live TV. The issue I have is what do I put near the TV. I'd like a consistent user interface (grandma and the the other technophobes in the house are continually pestering me on how to use different TVs, change channel, inputs etc.) so a key part of this for me is to make the user experience the same and simple i.e. no keyboards / PCs hanging around the TV. I've just bought a Linksys DMA 2200 to test the Windows Media Centre, but obviously off eBay as they're a dying breed. And with Windows Media Centre removed from Microsoft plans such devices will get rarer. And as for 1080p, think I can forget it with that set up. I have tested XBOX 360, also works but ditto on Microsoft plans for WMC. I was thinking of a WD Live TV to test the XMBC setup. Now to the question. Any advice on Media Centre / Extender setups that will do the job as above and have some degree of futureproofing (building my own with my Raspberry PI is a last resort). I'd like to understand the standards involved in the futureproofing if anyone knows (DNLA, RVU etc.).

    Read the article

  • Database: Storing Dates as Numeric Values

    - by Chin
    I'm considering storing some date values as ints. i.e 201003150900 Excepting the fact that I lose any timezone information, is there anything else I should be concerned about with his solution? Any queries using this column would be simple 'where after or before' type lookups. i.e Where datefield is less than 201103000000 (before March next year). currently the app is using MSSQL2005. Any pointers to pitfalls appreciated.

    Read the article

  • SQL Query Help - Return row in table which relates to another table row with max(column)

    - by Seth
    I have two tables: Table1 = Schools Columns: id(PK), state(nvchar(100)), schoolname Table2 = Grades Columns: id(PK), id_schools(FK), Year, Reading, Writing... I would like to develop a query to find the schoolname which has the highest grade for Reading. So far I have the following and need help to fill in the blanks: SELECT Schools.schoolname, Grades.Reading FROM Schools, Grades WHERE Schools.id = (* need id_schools for max(Grades.Reading)*)

    Read the article

  • [Haskell]Curious about the Hash Table problem

    - by astamatto
    I read that hash tables in haskell are crippled ( citation: http://flyingfrogblog.blogspot.com/2009/04/more-on-haskells-hash-table-problems.html ) and since i like haskell it worried me. Since the blog-post one year has passed and im curious, The hash table problem in haskell was "fixed" in the traditional compilers? (like ghc) ps: I love stack overflow, im a long time visitor but only today i decided to try to post a question.

    Read the article

  • LINQ Query returns nothing.

    - by gtas
    Why is this query returns 0 lines? There is a record matching the arguments. Deafkaw.Where(p => (p.ImerominiaKataxorisis >= aDate && p.ImerominiaKataxorisis <= DateTime.Now) && (p.Year == etos && p.IsYpodeigma == false) ).ToList(); Am i missing something?

    Read the article

  • Oracle get previous day records

    - by Phill Pafford
    Ok I think I'm getting the previous year instead of the previous day, but I need to previous day. SELECT TO_DATE(TO_CHAR(CURRENT_DATE, 'YYYY-MM-DD'),'YYYY-MM-DD') - 1 FROM Dual I'm comparing it to a datetime stamp in this format and wish to get all the rows from the previous day. YYYY-MM-DD HH:MM:SS So I'm trying something like this SELECT field,datetime_field FROM database WHERE datetime_field > TO_DATE(TO_CHAR(CURRENT_DATE, 'YYYY-MM-DD'),'YYYY-MM-DD') - 1

    Read the article

  • How can I totally flatten a PDF in Mac OS on the command line?

    - by Matthew Leingang
    I use Mac OS X Snow Leopard. I have a PDF with form fields, annotations, and stamps on it. I would like to freeze (or "flatten") that PDF so that the form fields can't be changed and the annotations/stamps are no longer editable. Since I actually have many of these PDFs, I want to do this automatically on the command line. Some things I've tried/considered, with their degree of success: Open in Preview and Print to File. This creates a totally flat PDF without changing the file size. The only way to automate seems to be to write a kludgy UI-based AppleScript, though, which I've been trying to avoid. Open in Acrobat Pro and use a JavaScript function to flatten. Again, not sure how to automate this on the command line. Use pdftk with the flatten option. But this only flattens form fields, not stamps and other annotations. Use cupsfilter which can create PDF from many file formats. Like pdftk this flattened only the form fields. Use cups-pdf to hook into the Mac's printserver and save a PDF file instead of print. I used the macports version. The resulting file is flat but huge. I tried this on an 8MB file; the flattened PDF was 358MB! Perhaps this can be combined with a ghostscript call as in Ubuntu Tip:Howto reduce PDF file size from command line. Any other suggestions would be appreciated.

    Read the article

  • Ruby: Having trouble pulling data from this class

    - by Shpigford
    So here's the output of inspect on a class: <Recurly::BillingInfo::CreditCard:0x1036a8a98 @prefix_options={}, @attributes={"month"=>1, "last_four"=>"1", "type"=>"bogus", "year"=>2010}> I'm trying to get the type attribute but seems that might be some sort of reserved word? Here's the full rundown of what I'm trying to do @charges = Recurly::BillingInfo.find('123') @charges.credit_card.type So, how can I get type from that?

    Read the article

  • Eclipse save automatically

    - by Don
    Hi, I would like Eclipse to automatically save every time I edit a file, in much the same way that it builds automatically. Because I've been using IntelliJ for the last year (which saves automatically by default), I keep having the following problem: Make some changes in Eclipse Forget to press save Run the build, unit tests, and notice some strange behaviour (Some time later....) realise that the unexpected behaviour occurred because I forgot to save the changes Is there any way I can make Eclipse save automatically? Thanks, Don

    Read the article

  • Converting from a day of week to unix time in PHP

    - by Rob
    Hi, I'm trying to get the unix time for date strings that are formatted like so: 'second sunday of march 2010' 'first sunday of november 2010' I was under the impression that strtotime could handle such a string, but apparently not, as this returns false. How can I convert to unix time when given a day of week, which one of those in the month (ie. first, second, etc.), a month and a year.

    Read the article

  • Making an Excel file into a link in VBA.

    - by Edmond
    Mvalue = MonthName(5, True) fileL = \bobby\outside\" myFile = fileL & Mvalue & Right(Year(Date), 2) & "\Goodbye - " & myfdate & ".xls" Set omail = CreateItem(olMailItem) With omail .Subject = "Hello" .BodyFormat = olFormatHTML .HTMLBody = myFile How do I make the.HTMLBody = myFile, into a link within the email that will be sent out

    Read the article

  • Dealing with personal failure

    - by codeelegance
    A while ago I was given the task of updating and extending the functionality of a software project. I was given a year to make the needed changes working solo. A month into development I came to the conclusion that it would take longer to change the existing product than to rewrite it from the ground up. I'd never attempted a complete rewrite so I talked with my boss about it and he was thrilled with the idea. I'm a fan of agile development but had never had the opportunity to take advantage of all of the prescribed practices so when I set to work I tried to incorporate as many as I could. I didn't have direct access to the customer and my coworkers (non-programmers) knew the business domain but were already so busy they didn't really have time to participate in design meetings so I resigned to working in the dark and occasionally calling one of them over to my desk to get feedback on my progress. I used TDD and refactored mercilessly and even tried taking a domain driven design approach. Things went well for a while. As the deadline came closer and the complexity of the project grew my productivity start slipping. I found myself cutting corners and ignoring the practices I had established as the pressure increased to meet the deadline. I also started working late nights and weekends to keep up with the load. In the end it made little difference how hard I worked. The project missed its deadline and what was completed wasn't enough to give to the customer. I had failed. Not only had I not finished on time but the previous version had sat untouched for almost a year so it wouldn't be of any help. Luckily we had another product that offered some of the same functionality. My boss decided to cancel the project entirely and moved all our orphaned customers to the other product. I spent weeks (along with everyone else at the company) manning the phones providing technical support for those customers. After it was all over, my boss was gracious enough not to fire me for nearly ruining the company. I was moved to the other product and have been trying to redeem myself ever since. Where did I go wrong? Has anyone else had to deal with this kind of defeat? How did you recover?

    Read the article

  • how to refactor user-permission system?

    - by John
    Sorry for lengthy question. I can't tell if this should be a programming question or a project management question. Any advice will help. I inherited a reasonably large web project (1 year old) from a solo freelancer who architected it then abandoned it. The project was a mess, but I cleaned up what I could, and now the system is more maintainable. I need suggestions on how to extend the user-permission system. As it is now, the database has a t_user table with the column t_user.membership_type. Currently, there are 4 membership types with the following properties: 3 of the membership types are almost functionally the same, except for the different monthly fees each must pay 1 of the membership type is a "fake-user" type which has limited access ( different business logic also applies) With regards to the fake-user type, if you look in the system's business logic files, you will see a lot of hard-coded IF statements that do something like if (fake-user) { // do something } else { // a paid member of type 1,2 or 3 // proceed normally } My client asked me to add 3 more membership types to the system, each of them with unique features to be implemented this month, and substantive "to-be-determined" features next month. My first reaction is that I need to refactor the user-permission system. But it concerns me that I don't have enough information on the "to-be-determined" membership type features for next month. Refactoring the user-permission system will take a substantive amount of time. I don't want to refactor something and throw it out the following month. I get substantive feature requests on a monthly basis that come out of the blue. There is no project road map. I've asked my client to provide me with a roadmap of what they intend to do with the new membership types, but their answer is along the lines of "We just want to do [feature here] this month. We'll think of something new next month." So questions that come to mind are: 1) Is it dangerous for me to refactor the user permission system not knowing what membership type features exist beyond a month from now? 2) Should I refactor the user permission system regardless? Or just continue adding IF statements as needed in all my controller files? Or can you recommend a different approach to user permission systems? Maybe role-based ? 3) Should this project have a road map? For a 1 year old project like mine, how far into the future should this roadmap project? 4) Any general advice on the best way to add 3 new membership types?

    Read the article

  • Getting segmentation fault after destructor

    - by therealsquiggy
    I'm making a small file reading and data validation program as part of my TAFE (a tertiary college) course, This includes checking and validating dates. I decided that it would be best done with a seperate class, rather than integrating it into my main driver class. The problem is that I'm getting a segmentation fault(core dumped) after my test program runs. Near as I can tell, the error occurs when the program terminates, popping up after the destructor is called. So far I have had no luck finding the cause of this fault, and was hoping that some enlightened soul might show me the error of my ways. date.h #ifndef DATE_H #define DATE_H #include <string> using std::string; #include <sstream> using std::stringstream; #include <cstdlib> using std::exit; #include <iostream> using std::cout; using std::endl; class date { public: explicit date(); ~date(); bool before(string dateIn1, string dateIn2); int yearsBetween(string dateIn1, string dateIn2); bool isValid(string dateIn); bool getDate(int date[], string dateIn); bool isLeapYear(int year); private: int days[]; }; #endif date.cpp #include "date.h" date::date() { days[0] = 31; days[1] = 28; days[2] = 31; days[3] = 30; days[4] = 31; days[5] = 30; days[6] = 31; days[7] = 31; days[8] = 30; days[9] = 31; days[10] = 30; days[11] = 31; } bool date::before(string dateIn1, string dateIn2) { int date1[3]; int date2[3]; getDate(date1, dateIn1); getDate(date2, dateIn2); if (date1[2] < date2[2]) { return true; } else if (date1[1] < date2[1]) { return true; } else if (date1[0] < date2[0]) { return true; } return false; } date::~date() { cout << "this is for testing only, plox delete\n"; } int date::yearsBetween(string dateIn1, string dateIn2) { int date1[3]; int date2[3]; getDate(date1, dateIn1); getDate(date2, dateIn2); int years = date2[2] - date1[2]; if (date1[1] > date2[1]) { years--; } if ((date1[1] == date2[1]) && (date1[0] > date2[1])) { years--; } return years; } bool date::isValid(string dateIn) { int date[3]; if (getDate(date, dateIn)) { if (date[1] <= 12) { int extraDay = 0; if (isLeapYear(date[2])) { extraDay++; } if ((date[0] + extraDay) <= days[date[1] - 1]) { return true; } } } else { return false; } } bool date::getDate(int date[], string dateIn) { string part1, part2, part3; size_t whereIs, lastFound; whereIs = dateIn.find("/"); part1 = dateIn.substr(0, whereIs); lastFound = whereIs + 1; whereIs = dateIn.find("/", lastFound); part2 = dateIn.substr(lastFound, whereIs - lastFound); lastFound = whereIs + 1; part3 = dateIn.substr(lastFound, 4); stringstream p1(part1); stringstream p2(part2); stringstream p3(part3); if (p1 >> date[0]) { if (p2>>date[1]) { return (p3>>date[2]); } else { return false; } return false; } } bool date::isLeapYear(int year) { return ((year % 4) == 0); } and Finally, the test program #include <iostream> using std::cout; using std::endl; #include "date.h" int main() { date d; cout << "1/1/1988 before 3/5/1990 [" << d.before("1/1/1988", "3/5/1990") << "]\n1/1/1988 before 1/1/1970 [" << d.before("a/a/1988", "1/1/1970") <<"]\n"; cout << "years between 1/1/1988 and 1/1/1998 [" << d.yearsBetween("1/1/1988", "1/1/1998") << "]\n"; cout << "is 1/1/1988 valid [" << d.isValid("1/1/1988") << "]\n" << "is 2/13/1988 valid [" << d.isValid("2/13/1988") << "]\n" << "is 32/12/1988 valid [" << d.isValid("32/12/1988") << "]\n"; cout << "blerg\n"; } I've left in some extraneous cout statements, which I've been using to try and locate the error. I thank you in advance.

    Read the article

  • EXTRACT for TIMESTAMP types in SQLite3

    - by umuthorax
    Hi, It seems extract function is not supported by SQLite3 for timestamp types (ref). For example; select extract(year from l_shipdate) as l_year from ... gives the following error; Error: near "from": syntax error I wonder whether there is an alternative way to do this in SQLite3 (or through rewriting the SQL query). Thanks in advance,

    Read the article

  • Add not null DateTime column to SQLite without default value?

    - by acidzombie24
    It looks like i cant add a not null constraint or remove a default constraint. I would like to add a datetime column to a table and have all the values set to anything (perhaps 1970 or year 2000) but it seems like i cant use not null without a default and i cant remove a default once added in. So how can i add this column? (once again just a plain datetime not null)

    Read the article

  • nginx 301 redirect to subfolder on primary domain

    - by 187j3x1
    sorry for my poor english. i just set up wordpress on my vps, so far its the only item on my site. there for seo reason, i think is better redirect all primary domain to the blog folder. primary domain is example.com wordpress is at example.com/blog what i want is rewrite www.example.com and example.com to example.com/blog. googled got some scripts, and make some change paste into nginx config file. here is: #301 redirect www to non-www server { server_name www.example.com; location = / { rewrite ^/(.*) http://example.com/$1 permanent; } } #301 non-www to subfolder server { server_name example.com; location = / { rewrite ^/(.*) http://example.com/blog$1 permanent; } } it works at some degree, successfully redirect to example.com/blog. the only problem is i get 404 not found error. then i only make nginx redirect www to example.com/blog. ok, this time i can access blog page. i know there is something wrong in the non-www to subfolder script. but do not how to fix it :(

    Read the article

  • 404 header - HTTP 1.0 or 1.1?

    - by keithjgrant
    So why does almost every example I can find (including this question form about a year ago) say that a 404 header should be HTTP/1.0 404 Not Found when we've really been using HTTP 1.1 for over a decade? Is there any reason not to send HTTP/1.1 404 Not Found instead? (Not that it matters all that much... I'm mostly just curious.)

    Read the article

  • WPF or Windows Forms

    - by Luminose
    I've been playing around with C# console applications for about a year and I want to move on to creating GUI applications. I have never done any GUI development besides basic Java applications, but I want to continue using C#. Should I start learning Windows Forms or jump straight to WPF? Is there a huge difference? Does WPF build on top of Windows Forms or are they totally different?

    Read the article

  • how to convert the Interger date format into YYYYMMDD?

    - by ccfenix
    Python and Matlab quite often have integer date representations as follows: 733828.0 733829.0 733832.0 733833.0 733834.0 733835.0 733836.0 733839.0 733840.0 733841.0 these numbers correspond to some dates this year. Do you guys know which function can convert them back to YYYYMMDD format? thanks a million!

    Read the article

< Previous Page | 174 175 176 177 178 179 180 181 182 183 184 185  | Next Page >