Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 690/1407 | < Previous Page | 686 687 688 689 690 691 692 693 694 695 696 697  | Next Page >

  • Configure Samba server via command line Linux CentOS

    - by Greg Alexander
    I am trying to get samba working on centOS... I installed it via Yum, changed the samba config file to: [ShareName] path = /var/www/html/ public = no writable = yes printable = no create mask = 0765 valid users = username Restarted samba and it did nothing.. the windows network is not seeing the share at all. I realize there is most likely something I am missing but I have always done it with the GUI, but unable to do that this time.. Any pointers?

    Read the article

  • Uninstall Java on Mac OS X?

    - by Jesse
    I'm working on a trouble shooting document for some desktop software that runs in Java. One of the last resort steps is to completely uninstall and reinstall the Java runtime. In Windows XP this can be done via Add/Remove Programs. Is there something equivalent on OSX? Or does reinstalling the runtime overwrite the current version?

    Read the article

  • After compiling PHP, I get mod_fcgid: error reading data from FastCGI server

    - by user34295
    I'm trying to add multiple PHP version in Plesk 12. Switching my domain to the new version PHP 5.4.29 result in this error: (104)Connection reset by peer: mod_fcgid: error reading data from FastCGI server Here is phpinfo() of the complied PHP version, obtained running php54-cgi index.php from the terminal. The same script placed under document root doesn't work in FastCGI. How can I debug/try to figure out what's the error? Currently running CentOS 6.5 x64, Plesk v12.0.18_build1200140529.2, PHP 5.5.13. I've downloaded PHP 5.4.29: cd /usr/local/src curl -O http://it1.php.net/distributions/php-5.4.29.tar.gz cd php-5.4.29 And configured with: ./configure \ --prefix=/usr/local/php54 \ --with-bz2 \ --with-config-file-path=/usr/local/php54/etc \ --with-config-file-scan-dir=/usr/local/php54/etc/php.d \ --with-curl \ --with-gd \ --with-gettext \ --with-iconv \ --with-layout=PHP \ --with-libxml-dir=/usr/local/php54 \ --with-mhash \ --with-mysql=mysqlnd \ --with-mysqli=mysqlnd \ --with-openssl \ --with-pdo-mysql=mysqlnd \ --with-readline \ --with-xsl \ --with-zlib \ --enable-calendar \ --enable-cgi \ --enable-exif \ --enable-ftp \ --enable-intl \ --enable-mbstring \ --enable-pcntl \ --enable-shmop \ --enable-sockets \ --enable-sockets \ --enable-sysvmsg \ --enable-sysvsem \ --enable-sysvshm \ --enable-wddx \ --enable-zip Then: make && make install Installing PHP CLI binary: /usr/local/php54/bin/ Installing PHP CLI man page: /usr/local/php54/php/man/man1/ Installing PHP CGI binary: /usr/local/php54/bin/ Installing PHP CGI man page: /usr/local/php54/php/man/man1/ Installing build environment: /usr/local/php54/lib/php/build/ Installing header files: /usr/local/php54/include/php/ Installing helper programs: /usr/local/php54/bin/ program: phpize program: php-config Installing man pages: /usr/local/php54/php/man/man1/ page: phpize.1 page: php-config.1 Installing PEAR environment: /usr/local/php54/lib/php/ [PEAR] Archive_Tar - installed: 1.3.11 [PEAR] Console_Getopt - installed: 1.3.1 warning: pear/PEAR requires package "pear/Structures_Graph" (recommended version 1.0.4) warning: pear/PEAR requires package "pear/XML_Util" (recommended version 1.2.1) [PEAR] PEAR - installed: 1.9.4 Wrote PEAR system config file at: /usr/local/php54/etc/pear.conf You may want to add: /usr/local/php54/lib/php to your php.ini include_path [PEAR] Structures_Graph- installed: 1.0.4 [PEAR] XML_Util - installed: 1.2.1 /usr/local/src/php-5.4.29/build/shtool install -c ext/phar/phar.phar /usr/local/php54/bin ln -s -f /usr/local/php54/bin/phar.phar /usr/local/php54/bin/phar Installing PDO headers: /usr/local/php54/include/php/ext/pdo/ Copied php.ini-production to /usr/local/php54/etc/php.ini and added a new handler in Plesk: /usr/local/psa/bin/php_handler --add -displayname 5.4.29 -path /usr/local/php54/bin/php-cgi -phpini /usr/local/php54/etc/php.ini -type fastcgi -id php54 Symbolic linking: ln -s /usr/local/php54/bin/php /usr/local/bin/php54 ln -s /usr/local/php54/bin/php-cgi /usr/local/bin/php54-cgi New installed version: php54-cgi -m [PHP Modules] bz2 calendar cgi-fcgi Core ctype curl date dom ereg exif fileinfo filter ftp gd gettext hash iconv intl json libxml mbstring mhash mysql mysqli mysqlnd openssl pcntl pcre PDO pdo_mysql pdo_sqlite Phar posix readline Reflection session shmop SimpleXML sockets SPL sqlite3 standard sysvmsg sysvsem sysvshm tokenizer wddx xml xmlreader xmlwriter xsl zip zlib [Zend Modules]

    Read the article

  • PHP FastCGI/XML/DOM Configure

    - by James
    Guys, any ideas why when I configure PHP 5.3.1, these options fail? Notice: Following unknown configure options were used: --with-xml --with-dom --enable-fastcgi --enable-discard-path --enable-force-cgi-redirect

    Read the article

  • Where may I get the EDX platform, the LMS open source project? [closed]

    - by Ramón Girona
    Possible Duplicate: Where can I download edx opensource learning platform? What other learning platforms are opensource? I have just found a query on the edx platform in which I am interested, being a significant piece of Learning Management System open source. I assume superuser platform cares about computer software, and therefore I don't see the question irrelevant. Besides I would like to know why a question is closed with a vague argument as "doesn't fit with the FAQ". Thanks very much, Ramón Girona

    Read the article

  • update samba on ubuntu 8.04ltr

    - by Crash893
    I have had a few problems getting windows 7 pc's to join my samba domain. The reason I've gathered is because the samba server software is outdated. What is involved in updating to the newest 3.5.x from the version that comes with 8.04ltr are there any pitfalls i should know about. what about very detailed instructions (I'm still learning Linux in general)

    Read the article

  • Connecting to internet via phone on Linux

    - by Bart van Heukelom
    I have a Sony Ericsson C702 phone with a flat fee internet subscription (GPRS/UMTS). I'd like to connect my Linux (Kubuntu 9.04) laptop to internet via this phone, using bluetooth (I also have a cable connection but that's propietary, doubt it'll work). How can I do this, preferably via GUI / NetworkManager / the BT applet that comes with KDE? In Windows I use SE's PC suite software which works great, but is not available for Linux.

    Read the article

  • create assembly from network location

    - by mjw06d
    The error I'm receiving: CREATE ASSEMBLY failed because it could not open the physical file "\\<server>\<folder>\<assembly>.dll": 5(Access is denied.). TSQL: exec sp_configure 'clr enabled', 1 reconfigure go create assembly <assemblyname> from '\\<server>\<folder>\<assembly>.dll' with permission_set = safe How can I create an assembly from a unc path?

    Read the article

  • How to scale out image hosting/serving?

    - by Continuation
    I asked this question on stackoverflow and it was suggested that I try it here: I'm building a website where users can upload photos and I'd also convert uploaded photos into thumbnails. Planning ahead, if the website gets popular, how do I scale it out so that the images (both original and thumbnails) will be stored in and served from multiple servers? Maybe a cluster? Is there any open source software that would help me in this? Thanks.

    Read the article

  • Can I use webex to show app from a remote desktop connection?

    - by tim
    I am working on a demo for a potential client and they want to run a webex meeting. Right now we are testing with the following scenario. Machine A is in a lab and is running our app Machine B is elsewhere (a laptop) and we use remote desktop to connect to machine A and run software on it. If we have a webex on machine B with other people can we show the apps from machine A to the webex participants?

    Read the article

  • T60 Screen/LCD gets black after some minutes with a highpitched sound rising and fading

    - by Edward De Leau
    Just now my T60 screen got "black" (so no display). On my second monitor: no problems so the vga output works. symptom: Screen blanks / no display but works on second monitor steps to reproduce: - boot - wait (it does not matter what you do you do not have to login or anything) - (now the monitor of the laptop slowly begins to make a ssssssssHHHHHHHHHHHHHHHHHWOEOEssssssss noice of about 10 seconds) - right after the sounds ends the monitor gets black times seem to be the same each time. software: installed no new software before/after, running zone alarm and antivirus. other: it does not feel hot in any place, there dont seem to be running processes with strange behaviour. warranty: out of warranty what was i doing: typing text on a website and doing some php coding in a text editor. Anyone any idea what I can do here other than buy a new laptop? / does it sound familiar to known cases? update: * exactly the same problem: http://forums.lenovo.com/t5/T61-and-prior-T-series-ThinkPad/T60-Screen-Blackout/m-p/288772 and the second poster (garyj) here: http://forums.lenovo.com/t5/T61-and-prior-T-series-ThinkPad/Black-Screen-on-T60/m-p/235053#M48627 and here: "i have that same problem. i replaced the CCRL on mine and it works fine when the screen is not screwed in. once the frame of the LCD screen (metal portion) touches the metal on the laptop which holds the screen the screen goes black. If the metal is touching the screen when you boot up it boots up with it being very dimmly lit. " from http://forums.lenovo.com/t5/T61-and-prior-T-series-ThinkPad/T60-screen-problems/m-p/205047#M44995 (it seems replacing the lcd is no use, he tried it 3 times). same problem: http://forums.lenovo.com/t5/T61-and-prior-T-series-ThinkPad/T60-black-screen/m-p/80604#M25914 Hmmm... not handy 3 or 4 months ago I ordered and installed a new fan. Now the LCD. Which does not seem the core isse but some electric issue so it seems replacing the LCD is not the thing todo here. I have the following question: If it is not the LCD that needs to be replaced (see other threads) which parts can I order to fix this? Has anyone got any information which could lead me to identify the issue? I have read replacing the "inverter" AND the "backlightning" would that make sense?

    Read the article

  • How do I send a newsletter to 2000 emails on a shared server?

    - by Bogdan
    Consider this scenario: I'm running Magento 1.4 Community Edition I have a newsletter that I'm sending out 2 times per week My list has 2000 subscribers I'm on a shared hosting plan (linux on apache 2.2 with Cpanel) My hosting provider limits me to 6 emails/minute How can I send 2000 emails x 2 times/week x 4 weeks/month in the above scenario? Is there a server configuration I can ask my hosting company to make? Any software that can temporize the email send?

    Read the article

  • Apache proxy pass in nginx

    - by summerbulb
    I have the following configuration in Apache: RewriteEngine On #APP ProxyPass /abc/ http://remote.com/abc/ ProxyPassReverse /abc/ http://remote.com/abc/ #APP2 ProxyPass /efg/ http://remote.com/efg/ ProxyPassReverse /efg/ http://remote.com/efg/ I am trying to have the same configuration in nginx. After reading some links, this is what I have : server { listen 8081; server_name localhost; proxy_redirect http://localhost:8081/ http://remote.com/; location ^~/abc/ { proxy_set_header X-Forwarded-Host $host; proxy_set_header X-Forwarded-Server $host; proxy_set_header X-Forwarded-For $proxy_add_x_forwarded_for; proxy_pass http://remote.com/abc/; } location ^~/efg/ { proxy_set_header X-Forwarded-Host $host; proxy_set_header X-Forwarded-Server $host; proxy_set_header X-Forwarded-For $proxy_add_x_forwarded_for; proxy_pass http://remote.com/efg/; } } I already have the following configuration: server { listen 8080; server_name localhost; location / { root html; index index.html index.htm; } location ^~/myAPP { alias path/to/app; index main.html; } location ^~/myAPP/images { alias another/path/to/images autoindex on; } } The idea here is to overcome a same-origin-policy problem. The main pages are on localhost:8080 but we need ajax calls to http://remote.com/abc. Both domains are under my control. Using the above configuration, the ajax calls either don't reach the remote server or get cut off because of the cross origin. The above solution worked in Apache and isn't working in nginx, so I am assuming it's a configuration problem. I think there is an implicit question here: should I have two server declarations or should I somehow merge them into one? EDIT: Added some more information EDIT2: I've moved all the proxy_pass configuration into the main server declaration and changed all the ajax calls to go through port 8080. I am now getting a new error: 502 Connection reset by peer. Wireshark shows packets going out to http://remote.com with a bad IP header checksum.

    Read the article

  • Custom DHCP Server on home network

    - by DanSpd
    Hello I have a computer network at my house which consists of two computers and one server. I have a software on dedicated server which requires direct connection to internet (port forwarding doesn't work for this). So I plan to setup network in following way. link text Please let me know if this will work. How good or bad could this be? Internet Connection: Verizon Fios 25/25

    Read the article

  • Custom DHCP Server on home network

    - by DanSpd
    Hello I have a computer network at my house which consists of two computers and one server. I have a software on dedicated server which requires direct connection to internet (port forwarding doesn't work for this). So I plan to setup network in following way. link text Please let me know if this will work. How good or bad could this be? Internet Connection: Verizon Fios 25/25

    Read the article

  • "fopen: No such file or directory" error

    - by Akshay Bhat
    I am getting following cryptic error: akshay@akshay-VirtualBox:/mnt/mmpp$ ./bin/metamap10 /mnt/mmpp/bin/SKRrun.10 -L 2010 /mnt/mmpp/bin/metamap10.BINARY.Linux -Z 10 --debug input.txt fopen: No such file or directory does this error implies that it cannot fopen cannot find a required file or fopen itself is nonexistent, note that both SKRrun.10 and metamap10.BINARY.Linux are present at the correct location I am using this software http://metamap.nlm.nih.gov/ on Ubuntu.

    Read the article

  • Looking for a good SNMP Browser to run under windows

    - by Littlejon
    I used to use Getif for poking around inside SNMP results from servers and devices. However it no longer works with Windows 7 and 64bit. I am looking for hopefully an OpenSource bit of software that will allow me add MIB's as required and allow me to browse the MIB tree and send a request/walk off to a server to get results. What do you all use?

    Read the article

  • Compiling PHP with GD crashes with EXC_BREAKPOINT (SIGTRAP) on PPC Mac

    - by Ömer
    First of all, I should say that I have searched the whole Internet for this problem but I couldn't find any solution yet. I have a Mac mini PowerPC (PPC) and I run Apache webserver (httpd-2.2.22) with PHP (5.4.0) and I do all the configure & compilation jobs by myself. If configure with: './configure' '--prefix=/usr/local/php5' '--mandir=/usr/share/man' '--infodir=/usr/share/info' '--sysconfdir=/etc' '--with-config-file-path=/etc' '--with-zlib' '--with-zlib-dir=/usr' '--with-openssl=/usr' '--without-iconv' '--enable-exif' '--enable-ftp' '--enable-mbstring' '--enable-mbregex' '--enable-sockets' '--with-mysql=/usr/local/mysql' '--with-pdo-mysql=/usr/local/mysql' '--with-mysqli=/usr/local/mysql/bin/mysql_config' '--with-apxs2=/usr/local/apache2/bin/apxs' '--with-mcrypt' then the PHP works flawlessly. But if I add the GD module by adding these to the script above: '--with-gd' '--with-jpeg-dir=/usr/local/lib' '--with-freetype-dir=/usr/X11R6' '--with-png-dir=/usr/X11R6' '--with-xpm-dir=/usr/X11R6' the PHP gets configured and compiled without any errors but it causes EXC_BREAKPOINT (SIGTRAP) (see the Crash Reporter log below) when I request a page which calls PHP module. It's obvious that something related to the GD module is causing this, probably FreeType module because it's present in the log but it may not be definite of course. When the PHP crashes (or more accurately, httpd) the CPU goes 100% for 10 to 15 seconds until it recovers. I need to use the GD module and keep the Mac mini PowerPC. So, what should I do to solve this problem? Process: httpd [79852] Path: /usr/local/apache2/bin/httpd Identifier: httpd Version: ??? (???) Code Type: PPC (Native) Parent Process: httpd [79846] Date/Time: 2013-11-04 15:44:28.444 +0200 OS Version: Mac OS X 10.5.8 (9L31a) Report Version: 6 Anonymous UUID: 0178B7F8-2241-43F7-A651-9E7234D41A37 Exception Type: EXC_BREAKPOINT (SIGTRAP) Exception Codes: 0x0000000000000001, 0x0000000093c11e0c Crashed Thread: 0 Application Specific Information: *** single-threaded process forked *** Thread 0 Crashed: 0 com.apple.CoreFoundation 0x93c11e0c __CFRunLoopFindMode + 328 1 com.apple.CoreFoundation 0x93c13d88 CFRunLoopAddSource + 276 2 com.apple.DiskArbitration 0x901a6e8c DAApprovalSessionScheduleWithRunLoop + 52 3 ...ple.CoreServices.CarbonCore 0x9512e67c _FSGetDiskArbSession(__DASession**, __DAApprovalSession**) + 540 4 ...ple.CoreServices.CarbonCore 0x9512e420 CreateDiskArbDiskForMountPath(char const*) + 84 5 ...ple.CoreServices.CarbonCore 0x9512d2c8 FSCacheableClient_GetVolumeCachedInfo(char const*, statfs const*, CachedVolumeInfo*, __DADisk*, __DADisk**) + 280 6 ...ple.CoreServices.CarbonCore 0x9512cca4 MountVolume(char const*, statfs*, unsigned char, unsigned char, __DADisk*, short*) + 352 7 ...ple.CoreServices.CarbonCore 0x9512ca48 MountInitialVolumes() + 172 8 ...ple.CoreServices.CarbonCore 0x9512c4d4 INIT_FileManager() + 164 9 ...ple.CoreServices.CarbonCore 0x9512c390 GetRetainedVolFSVCBByVolumeID(unsigned long) + 48 10 ...ple.CoreServices.CarbonCore 0x9512adf4 PathGetObjectInfo(char const*, unsigned long, unsigned long, VolumeInfo**, unsigned long*, unsigned long*, char*, unsigned long*, unsigned char*) + 184 11 ...ple.CoreServices.CarbonCore 0x9512acc4 FSPathMakeRefInternal(unsigned char const*, unsigned long, unsigned long, FSRef*, unsigned char*) + 64 12 libfreetype.6.dylib 0x0070a0fc FT_New_Face_From_Resource + 56 13 libfreetype.6.dylib 0x0070a3b0 FT_New_Face + 48 14 libphp5.so 0x0118d1a8 fontFetch + 824 15 libphp5.so 0x0118edac php_gd_gdCacheGet + 220 16 libphp5.so 0x0118d6d8 php_gd_gdImageStringFTEx + 360 17 libphp5.so 0x011763c0 php_imagettftext_common + 1504 18 libphp5.so 0x01176494 zif_imagefttext + 20 19 libphp5.so 0x014b9c68 zend_do_fcall_common_helper_SPEC + 1048 20 libphp5.so 0x01452898 _ZEND_DO_FCALL_SPEC_CONST_HANDLER + 440 21 libphp5.so 0x014ba878 execute + 776 22 libphp5.so 0x013f190c zend_execute_scripts + 316 23 libphp5.so 0x013779f4 php_execute_script + 596 24 libphp5.so 0x014bbe64 php_handler + 1972 25 httpd 0x000020c0 ap_run_handler + 96 26 httpd 0x00006ae0 ap_invoke_handler + 224 27 httpd 0x000305c4 ap_process_request + 116 28 httpd 0x0002c768 ap_process_http_connection + 104 29 httpd 0x00012d30 ap_run_process_connection + 96 30 httpd 0x00012ecc ap_process_connection + 92 31 httpd 0x000373e4 child_main + 1220 32 httpd 0x000376a8 make_child + 296 33 httpd 0x000377e4 startup_children + 100 34 httpd 0x000387d4 ap_mpm_run + 3988 35 httpd 0x0000a320 main + 3280 36 httpd 0x000019c0 start + 64

    Read the article

  • Security Essentials for Windows 8? [closed]

    - by FiveO
    Possible Duplicate: Windows 8 and Microsoft Security Essentials Windows 8 does not seem to have the "Security Essentials" Anti-Virus like Windows 7 installed. Also the Download doesn't say Win-8 compatible. And in addition, my Soluto does not recognize any Anti-Virus program installed. Is there a Anti-Virus in Windows 8 installed by default? Or can I continue using Security Essentials? (Please no discussion about the best anti-virus software)

    Read the article

  • Exchange backup size larger then file size

    - by bladefist
    My backupexec is setup to integrate with exchange, to backup the information store, versus just backing up the data file path. My exchange mdbdata folder is 17 gigs. But my backup exec is backing up 40 gigs worth of data. I have gone through it a million times, and it's strictly backing up exchange information store. I deleted all my backups and started over, to clear the incremental backup old data. Where is all this extra data coming from?

    Read the article

  • Is it generally a bad idea to have other types of virtual appliances installed along side a firewall

    - by MGSoto
    I want to run my Firewall/NAT software (pfsense) and an internal NAS (looking at freenas right now) for my SOHO on one machine. Right now I have them separated on two different machines, but I'd like to consolidate them. Is this generally a bad idea? I see the security concern where if the firewall or host OS is compromised, then your data is essentially screwed. But is it really a concern for me?

    Read the article

< Previous Page | 686 687 688 689 690 691 692 693 694 695 696 697  | Next Page >