Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 698/1407 | < Previous Page | 694 695 696 697 698 699 700 701 702 703 704 705  | Next Page >

  • Looking for a good computer repair kit

    - by johnny
    I'm afraid I'll get ripped if I get the generic kit from Tigerdirect or whatever. For clarity this is not software I am after but physical tools. It should include something for occassional soldering of electronics, crimper, other things I cannot remember. Hoping for ideas or product links (yes I am searching also). Thank you.

    Read the article

  • Can two Identical devices be present on the same bus in any PCI Topology

    - by vaibbhav
    As per the PCI standard, devices are identified on the basis of Vendor Id, Device Id and the bus no. All devices of same type have identical vendor id and device id. If I put two such devices on the same bus say bus 0. How will the PCI Software Subsystem distinguish between the two? If such a case is not possible in PCI, then can such thing be possible through PCI Express Switch?

    Read the article

  • Dns with parallel resolution

    - by viraptor
    I'm looking for a simple caching (can be caching-only) DNS server, which can do parallel resolving on its own. Is there something like that available? Alternatively I know there's the c-ares library, which can do multiple-hosts resolution, but it's not a drop-in replacement for libresolve that I could use in the affected software. Maybe there is some other lib which can fulfill this requirement?

    Read the article

  • best way to import mailing list archives

    - by Naveen Garg
    I tried reading mailing lists in gnus in emacs, but emacs stops responding with the slow nntp servers downloads. nabble, gmane etc are also kind of slow. So I thought about download the gzipped archives available from most mailing lists. here are some nice instructions to import these archives into thunderbird. Is there a similar streamlined way to read the unziped archives in emacs, or other software ?

    Read the article

  • Installing Windows 7 x64 SP1: Error 0x8007007b (The filename, directory name or volume label syntax is incorrect)

    - by Eikern
    I just tried to install Windows 7 x64 SP1 on my desktop computer, but 10 minutes in to the installation i get this error: The filename, directory name or volume label syntax is incorrect. ERROR_INVALID_NAME(0x8007007b) My guess is that I have to reinstall the OS, but I'm wondering if I somehow can get a more detailed error message. I want to know what has got the wrong name/path? Anybody know? EDIT: I pressed enter after selecting a tag, before I had finished the question.

    Read the article

  • Disable Device Stage Capability

    - by coelhudo
    Is it possible to prevent or disable autorun/autoplay/device-stage by modifying regedit? Because of some constraints, I cannot disable by Control Panel options. I found some related questions here, for example, and some solutions provided by Microsoft, mainly involving this key on regedit: HKEY_CURRENT_USER\SOFTWARE\Microsoft\Windows\CurrentVersion\policies\Explorer\NoDriveTypeAutorun But none of these solutions worked, neither after rebooting. Is there any other key or value that controls this kind of property?

    Read the article

  • How can I turn my server box into an internet modem?

    - by Robbie Mckennie
    I've been trying to learn about networking, network maintenance, network administration, stuff of that nature (I want to be a network engineer when I get out of university after I get out of high school) and I want to set up my older PC (running Slackware) as a modem, as a project to help me learn. I want to know what kind of hardware I'll need. Pretty much all I know is that my current modem uses ADSL2+ and PPPoA, which I think is a software thing anyway. How can I accomplish this?

    Read the article

  • Windows 8.1 and fingerprint readers

    - by Sevenate
    Is there any build in UI for that kind of hardware like it exist in Modern UI for WiFi, Bluetooth, Broadband mobile and other common settings or I'm forced to use separate software (besides the obvious drivers for hardware)? The thing is that I have build-in fingerprint reader in my laptop and I have installed all necessary official drivers for it (and it looks like they are working fine, btw). But I did not find any UI settings where I could change Sign-in option from password/picture password/pin to fingerprint.

    Read the article

  • generate exchange CSR , exchange 2007 UCC. SSL CERT

    - by Jeff
    I want to make sure I am going this correctly. machine name: win2k8ex1. certificate: common name: owa.x.com subject alternative domains: autodiscover.x.com mail.x.com WIN2K8EX1 WIN2K8EX1.x.LOCAL when generating the CSR, i want to: New-ExchangeCertificate -GenerateRequest -SubjectName "c=US, o=x Inc., cn=owa.x.com" -DomainName mail.x.com,WIN2K8EX1,WIN2K8EX!.x.local,autodiscover.x.com -privatekeyexportable $true -Path c:\certificates\mcert.txt does this look correct? thanks!

    Read the article

  • http benchmarking?

    - by Sam Williams
    im running varnish-nginx(php-fpm) and im using ab but it keeps messing up. [root@localhost src]# ab -k -n 100000 -c 750 http://192.168.135.12/index.php This is ApacheBench, Version 2.0.40-dev <$Revision: 1.146 $> apache-2.0 Copyright 1996 Adam Twiss, Zeus Technology Ltd, http://www.zeustech.net/ Copyright 2006 The Apache Software Foundation, http://www.apache.org/ Benchmarking 192.168.135.12 (be patient) apr_socket_recv: Connection reset by peer (104) is there anything else i can use? or am i doing it wrong?

    Read the article

  • How to get the installed Memory Type

    - by balexandre
    Windows 7 could be better at this, it tells everything about the computer CPU but only the Memory amount Microsoft should add information about DDR type, speed and maybe CL as well. While this never happens, What's the best and easy way to check the installed memory so we can buy and upgrade it? I was thinking a simple software so I don't need to install the full SiSoft Sandra for example, just looking for something small, only for the memory part.

    Read the article

  • Access control to non root users

    - by Sirish Kumar
    Hi I am setting up development environment based on SLED, we have installed required software as root user. We have configuered users Login through NIS. Developers needs access to almost all partitions for complete access including write and execute when they login using their ID's, Log in through their own id's is mandatory . What is the best way to give this access?

    Read the article

  • Dynamics CRM 2011 report view can't be changed?

    - by CokaKola99
    I am trying to create a report for our CRM system but I am finding that I cannot change the page settings for it. If I export it to Excel I can tinker around with the results but I would rather that I change the actual report than have users manually change it. While I want this changed I don't want to have to add some third-party software to do this. That said does anyone have any suggestions on how to accomplish this?

    Read the article

  • Does the Fast Video Download addon share my data?

    - by Frost Shadow
    I've installed the Fast Video Download version 3.0.8 addon for Firefox to download flash videos, like from youtube. What I'm wondering is, how does the addon download it, and do other people see that i'm downloading the videos? For example, is all the software to download the video already on my computer, or does the addon contact someone else to get the video, or let them know? Can the webpage's administrator see I'm downloading the video?

    Read the article

  • different .bashrc files for different login nodes?

    - by 130490868091234
    Can I have different .bashrc files loading when logging into different nodes that share the same home dir? This is, I am mostly interested to loading different PATH directories when logging as bash, depending on the different Linux nodes I log into? For example, if I log into bash in machine abc-01, I would like to have a given .bashrc loaded, but when I log into abc-02, that uses the same /home/username directory, I would like to use a different .bashrc. How can I go about doing that?

    Read the article

  • I recompiled dozens of times, why is my OpenSSL Library and Header still not the same?

    - by Doug
    openssl OpenSSL support enabled OpenSSL Library Version OpenSSL 0.9.8o 01 Jun 2010 OpenSSL Header Version OpenSSL 1.0.1 14 Mar 2012 From PHP (5.4.4) info, this is the problem I have. I am dry out of ideas, and I cannot understand why it ins't working. This was my configure: ./configure '--with-apxs2=/etc/apache24/bin/apxs' '--with-mysql' '--prefix=/etc/apache24/php' '--with-config-file-path=/etc/apache24/php' '--enable-force-cgi-redirect' '--disable-cgi' '--with-zlib' '--with-gettext' '--with-curl' '--with-mcrypt' '--with-gd' '--with-pdo' '--with-pdo-mysql' '--with-mysql-sock=/var/run/mysqld/mysqld.sock' '--with-libdir=lib32' '--with-openssl=shared,/usr' '--with-mysqli'

    Read the article

  • How to convert from MIDI to WAV

    - by nXqd
    I really need a software which can convert from midi to wav. I've found midiConverter but it seems not work . After click record button, I receive a WEIRD file which is just messy sound not the fancy melody. THanks for reading this and I'll vote to every answer :)

    Read the article

< Previous Page | 694 695 696 697 698 699 700 701 702 703 704 705  | Next Page >