Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 126/1407 | < Previous Page | 122 123 124 125 126 127 128 129 130 131 132 133  | Next Page >

  • Cygwin and zsh: removing "path prefix line"

    - by Viktor
    I've installed Cygwin under Windows 7 and I've added the line exec zsh -l to C:\cygwin\home\Viktor\.bash_profile. Problem is I still get that ugly new line for every command I write: (Viktor@INET)[2] ~ $ cd D: (Viktor@INET)[3] /cygdrive/d $ ls $RECYCLE.BIN Program Files (x86) System Volume Information Viktor xampp (Viktor@INET)[4] /cygdrive/d $ _ As horizontal space is no concern with 1920 pixels I would like to have the "Linux appearance", something like this viktor@inet> _ or whatever is default. One command shouldn't take three lines. And how do I change the colors? Edit. I also have Console2 installed, which I have set to use Cygwin, if that's any help.

    Read the article

  • Script in include path not accessible to home user

    - by François ? Vespa ?
    So I have put a shortcut to one my scripts into /usr/bin so it is included. But command can be run only by root, other users failed to run it :( $ sudo su # chmod +x /opt/altf2/altf2 # ln -s /opt/altf2/altf2 /usr/bin/altf2 # altf2 It's working # chmod 777 /opt/altf2/altf2 # chmod 777 /usr/bin/altf2 # su francois $ altf2 gedit altf2: command not found $ /usr/bin/altf2 bash: /usr/bin/altf2: Permission denied

    Read the article

  • Simulating an UNC path with a leading dot

    - by Uwe Keim
    Being a C# .NET Windows Forms developer, some customers are running our applications on an Apple OS X Mac inside a Parallels virtual machine. Parallels presents host folders to the guest Windows as UNC paths with a leading dot like \\.psf\Home\Some\More\Folders Now an application of us cannot handle the leading dot correctly when accessing files from these kind of shares ("Invalid URI, cannot analyze host name" exception). I want to debug and fix this issue, unfortunately I do have no Mac and Parallels around here to test it. My question is: Is there a way to "simulate" this kind of share on a normal Windows server or client so that I'll be able to debug my application with Visual Studio? What I tried so far: I already tried to edit my HOSTS file to contain an entry like # ... 127.0.0.1 .psf # ... but Windows just seems to not recognize the share at all.

    Read the article

  • nginx proxy to different path

    - by David Robertson
    I've read through the documentation for nginx's HttpProxyModule, but I can't figure this out: I want it so that if someone visits, for example http://ss.example.com/1339850978, nginx will proxy them http://dl.dropbox.com/u/xxxxx/screenshots/1339850978.png. If I was to just use this line in my config file: proxy_pass http://dl.dropbox.com/u/xxxxx/screenshots/;, then they would have to append the .png themselves. tia, David.

    Read the article

  • On Linux, why does directory tab completion add a \ to a path starting with ~

    - by crobar
    On my work scientific linux 6.2 machine, I often start typing in a directory like below and use tab completion to finish it: ~/mydir But when I hit tab, it becomes e.g. \~/mydirectory/ With an extra forward slash at the start. Why is this, and can I prevent it? It's a pain because using cd etc. doesn't work with the extra slash, I have to start from the actual home directory which is something like /home/username/ On these PCs.

    Read the article

  • Give the path to the inserted USB key to a script

    - by Xavier Nodet
    I'd like to run a given Perl script whenever I connect my camera to my PC, so that this script will download all the photos on it. But as the drive letter for the camera may change depending on what's already connected, I need to pass this drive letter as an argument to the script. Is this doable? Thanks. PS: if this is not possible, an answer to this other question would be very helpful.

    Read the article

  • DVD drive won't work after installing software

    - by Dan
    DVD drive was already region-free but for some reason would not play a certain DVD as it was the "wrong region". This is the first time I've played a DVD on the drive, but I've imported a lot of CDs before and they always worked fine, even CDs bought from the USA (I live in the UK). To get around this, I downloaded a piece of software called "DVD Region Killer". (Clicking the link won't start the download, so go ahead and check it.) After this, the drive isn't recognised. It won't show up in "My Computer", and when I insert a disc it will start to whir but not take action, i.e. iTunes won't recognise that I have put a CD in. In the Device Manager, the drive shows up with a caution-sign. The device status reads: Windows cannot start this hardware device because its configuration information (in the registry) is incomplete or damaged. (Code 19) Disabling, uninstalling and reinstalling does not help. Clearly the software download is the issue, but it is difficult to remove. The only files I can find in Program Files are: C:\Program Files (x86)\Elaborate Bytes\DVD Region Killer which contains a changelog and a HTML document which has no info on uninstalling. It doesn't show up on "Add or Remove Programs", or even as a background process when I press ctrl-alt-del. Apparently it has no interface as such, and can be accessed by an icon in the system tray, (see review in link) but I don't see the icon. If it helps to know, I have a Dell Inspiron running Windows 8 64-bit, and the model of the DVD drive is: MATSHITA DVD+-RW UJ8C2 Thanks in advance.

    Read the article

  • Can't run command with sudo, even with the full path, I got an error

    - by Keating Wang
    the command starling is /home/keating/.rvm/gems/ruby-1.9.2-p290/bin/starling when run starling, get the error Permission denied when run rvmsudo starling, works well when run sudo starling, get the error sudo: starling: command not found when run sudo /home/keating/.rvm/gems/ruby-1.9.2-p290/bin/starling, get the error: /home/keating/.rvm/rubies/ruby-1.9.2-p290/lib/ruby/site_ruby/1.9.1/rubygems/dependency.rb:247:in to_specs': Could not find starling (>= 0) amongst [minitest-1.6.0, rake-0.8.7, rdoc-2.5.8] (Gem::LoadError) from /home/keating/.rvm/rubies/ruby-1.9.2-p290/lib/ruby/site_ruby/1.9.1/rubygems/dependency.rb:256:into_spec' from /home/keating/.rvm/rubies/ruby-1.9.2-p290/lib/ruby/site_ruby/1.9.1/rubygems.rb:1229:in gem' from /home/keating/.rvm/gems/ruby-1.9.2-p290/bin/starling:18:in' I really want to run the command with sudo, because the error above is the same as running rvmsudo service starling start(I had set starling as a service of the os)

    Read the article

  • Software/hardware to build video streaming server?

    - by Sasha Yanovets
    I am looking for a video streaming server solution, something like online TV server, with ability to make live broadcasts in the internet. What software could you recommend for that? What kind of hardware it should run on, should be there anything special? I am looking for a solution that could be scaled up to at least 1000 simultaneous users online with good resolution of video. I think it is good to have general answer on what direction to choose. But here more details on my specific case: I just looking for a solution almost from scratch. We have some video content that we've produced, but it is not delivered over internet yet. We do not tied to any particular vendor for now. We want to make 24 hours of steaming three 8 hour blocks with change of content every day. We want the ability to make regular live broadcasts. I guess we will need to have several options of streaming quality (low ~56 kb/s mid ~273 kb/s). Some terms just foreign to me (like play-truncation rate), if you could point out what parameters we should avare of, it would be great. Uplink to the internet is to be determined. We plan to start from something and scale up on the way. If you are already have some kind of media streaming server, just describe its configuration here (hardware, OS, software), peak number of concurrent users it serves. I think it could help people approaching this task.

    Read the article

  • Western Digital My Book not recognized by WD software

    - by Kari
    A few years ago I bought a WD My Book Pro 2. It worked fine for a while, then one of the drives failed and I sent it back to be replaced under warranty. I never got around to setting up the new one when I got it back. I finally ran out of room on my internal drive, so I tried to use the external - no go. Both drives spin up, but aren't recognized by either Disk Utility (Mac) or the WD Drive Manager. I tried on a PC as well with fresh software. Then I pulled the drives out of the enclosure (warranty is already expired) and plugged them straight into the PC. Both recognized and working 100% in RAID0. BIOS recognizes either disk as functional; Windows only sees them when both are connected due to the RAID which I can't change without the WD software. The drives that were returned to me are the "Green" drives which I've read are NOT recommended for RAID. Is it possible that this is interfering with them reading externally? Any other ideas? My main computer is a laptop so using them internally isn't an option :(

    Read the article

  • Picking a degree path...

    - by Chris
    I'll be going to University of South Florida soon, and have to choose between two degrees, I want to head into general Server (IT) administration for a small / medium business. Setting up computers, imaging, managing file servers / logon servers /etc. * I had to change the http to hxxp in order to post. I have two degrees I'm currently choosing between: - BSAS hxxp://www.poly.usf.edu/Academics/AppliedAS/BSAS-IT/Program_of_Study.html - BSIT hxxp://www.poly.usf.edu/IT/ I like the idea of a BSAS because it'll get me out sooner, and then I can work on a few certifications to "match" the BSIT... I'm just worried companies will look at that as a "lesser" degree to a BSIT (or even a CS degree.) What are your guys' thoughts on these two degrees? The BSIT has more math, which I still have about 2 more classes to go through (I'll be heading to USF this August.) while the BSIT doesn't require those 2 extra math classes. I keep on hearing from people that when they hire you for your first job, they don't care which degree you have, as long as it's relevant and it's a 4-year degree, is this true?

    Read the article

  • nginx howto correct the path from a back-end server redirect response under a virtual directory

    - by noname
    The following was my deployed servers: client ------ nginx proxy(example.com) ------ back-end server(192.168.1.20) The nginx proxy's external URL was configured under a virtual directory http://example.com/demo/ The back-end server was configure to http://192.168.1.20:8080/ the following was part of the nginx configure file: location /demo { proxy_pass http://192.168.1.20:8080/; proxy_redirect default; proxy_set_header Host $http_host; proxy_set_header X-Real-IP $remote_addr; proxy_set_header X-Forwarded-For $proxy_add_x_forwarded_for; } When the back-end server send a redirect response (HTTP CODE 302) with LOCATION head field "http://192.168.1.20/subdir/", the nginx map this LOCATION header field to "http://example.com/subdir/", not the disired "http://example.com/demo/subdir/"

    Read the article

  • Quickly set up a Windows Server and automatically install and configure software

    - by Chris
    Yesterday I spent far too much time downloading and installing software on Windows Server 2008. I only had to install a simple server for SQL Server 2008 Express using Microsoft's Web Platform Installer, then configure it to enable remote connections. Everything had to be attended, wasting my time. On a Linux system, this would be trivial to automate, but this is Windows. I do this very rarely, but in the future I would like to make this take as little time as possible. I could do a disc image with everything I installed and configured, but is there a better way? I know nothing of advanced deployment techniques on Windows. Ideally I would like to be able to remotely re-install the OS, or have an unattended install (which I know is possible). Any tips to make the software I need easier to and install and configure with minimal interaction necessary would be helpful. I don't expect everything I asked for to be possible and easy to do. Basically, If any part of it can be done quicker or at least without user input, that's what I'm looking for.

    Read the article

  • Nginx fastcgi split path info with mailman

    - by eyadof
    i'm using mailman with nginx to get its web interface this my nginx config : location /cgi-bin/mailman { root /usr/lib/; fastcgi_split_path_info (/cgi-bin/mailman[^/]*)/(.*)$; include /etc/nginx/fastcgi_params; fastcgi_param SCRIPT_FILENAME $fastcgi_script_name; fastcgi_param PATH_INFO $fastcgi_path_info; fastcgi_param PATH_TRANSLATED $fastcgi_path_info; fastcgi_intercept_errors on; fastcgi_pass unix:/var/run/fcgiwrap.socket; } it's seems to work good when i call mydomain.com/cgi-bin/mailman/listinfo, but when I request something like : mydomain.com/cgi-bin/mailman/listinfo/mylist i get 403 and in nginx error log : FastCGI sent in stderr: "Cannot chdir to script directory (/usr/lib/cgi-bin/mailman/listinfo)" while reading response header from upstream I tried every regex available to get it work but it still give 403 any help or any clue to get it work .

    Read the article

  • Nginx Rewrite Convert Querystring to Path

    - by YardenST
    I whould like this simple rewrite rule: /somefolder/mypage.aspx?myid=4343&tab=overview to be redirected to: /folder/4343/overview/ I looked for some solutions and none actually worked.. I tried: rewrite ^/somefolder/mypage.aspx?myid=(.*)&tab=overview$ /folder/$1/overview permanent; and rewrite ^/somefolder/mypage\.aspx\?myid=(.*)&tab=overview$ /folder/$1/overview permanent; What am I doing wrong? I'm getting 404 (simpler rules works just fine..) Thanks

    Read the article

  • IIS virtual location path

    - by Worp
    Sorry in advance, for this seems to be a very noobish question and should be easily fixable, yet I can't work it out: I am setting up windows authentication for a website running on IIS 8.5: The Yii framework of the website takes input like http://localhost/mywebsite/index.php/site/loginand processes it, using the "login" action of the "site" Controller. I flipped on URL Rewrite to have nicer URLs, leaving the URL with /mywebsite/site/login. Now I need to set up windows authentication for this location. Very specifically ONLY for this very exact location. Only the /site/login location of mywebsite needs to have authentication. Every other location needs to have anonymous. Since it is a "virtual location", I don't know how to do it. I can set up win-auth for files, directories, virtual directories, etc. but not for virtual locations that do not map to any file but only to a Controller/Action in Yii. The working counterpart in Apache is but i can't "translate this into IIS". I have read that IIS does have the "~" symbol but I just couldn't make it work yet. Could it be used to achieve authentication on a location basis? I have looked around virtual directories as well, which seem to simply be a kind of "symlink" to actual folders on the harddrive. Can they be used differently to "create a virtual folder in a location that doesn't really exist to manage its properties"? Help is much appreciated.

    Read the article

  • Reliable backup software for windows network/samba shares.

    - by Eli
    Hi All, I have a Win2003 server that works as a pdc for a number of XP boxes, and a couple related FreeBSD boxes. I need to back up roaming profiles, non-roaming profiles via network shares, local hard drive data, and files on the FreeBSD boxes via samba shares. I have tried Genie Backup Manager and Backup4All pro, and both have excellent features, but both also begin to fail disastrously with more than a few days use. Mostly, the errors seem to have been from the backup catalog getting out of synch with itself. Whatever it is, there is no excuse for a backup software that says it backed up files when it really didn't, or the log saying it backed up exactly the same file 10,000 times in a single run, or flat-out crashing, or any of the other myriad problems I've run into with these. Really sad for products that fill such an important need. Anyway, does anyone know of a backup software that works reliably and can do the following? Scheduled backups for multiple jobs, without a user logged in. Backup from local hard drives or network shares. Incremental backups. Thanks! Edit: Selected solution: I've added my (hopefully final) solution as an answer.

    Read the article

  • mod_rewrite directory path to deeper directory

    - by DA.
    I don't usually work with LAMP and am a bit stumped getting a site working locally. The site is set up to be used via localhost: 1) http://localhost/mysite However, the way the site files are physically on the server the root is located as such: 2) /var/www/mysite/trunk/site I'm trying to figure out a way where I could type #1 but have apache actually looking for the files in #2 so that all of the asset/page links in the web application work. Is mod_rewrite the solution? If so, I'm stumped on the syntax. I have this but it won't work (due, I assume, to it causing an infinite loop) RewriteRule ^mysite/ mysite/trunk/site I have a hunch I need to sprinkle on some regex?

    Read the article

  • Nginx redirect one path to another

    - by SteveEdson
    I'm sure this has been asked before, but I can't find a solution that works. A website has switched CMS services, but has the same domain, how do I set up an nginx rewrite for a single page? E.g. Old Page http://sitedomain.co.uk/content/unique-page-name New page http://sitedomain.co.uk/new-name/unique-page-name Please note, I don't want everything within the content page to be redirected, but literally just the url mentioned above. I have about 9 redirects to set up, non of which fit in a pattern. Thanks! Edit: I found this solution, which seems to be working, except for the fact that it redirects without a slash: if ( $request_filename ~ content/unique-page-name/ ) { rewrite ^ http://sitedomain.co.uk/new-name/unique-page-name/? permanent; } But this redirects to: http://sitedomain.co.uknew-name/unique-page-name/

    Read the article

  • VBA - Instead of ActiveExplorer.Selection to set folder, explicitly set folder path

    - by Mike
    Sub MoveItems() Dim Messages As Selection Dim Msg As MailItem Dim NS As NameSpace Set NS = Application.GetNamespace("MAPI") Set Messages = ActiveExplorer.Selection If Messages.Count = 0 Then Exit Sub End If For Each Msg In Messages Msg.Move NS.Folders("Personal Folders").Folders("SavedMail") Next End Sub This code will move all email messages from the currently selected folder in outlook to another folder (SavedMail). I would like to edit the code so that instead of using the currently selected folder as the source for the messages, there would be a hard-coded folder - something like Set Messages = NS.Folders("Personal Folders").Folders("Moved"). I'm a VBA rookie and tried just replacing the Set Messages line with this which resulted in a Run-time error '13': Type mismatch which I think refers to a mismatch of the Dim Messages and the Set Messages commands. I've tried using different Dim definitions with no luck. I'm guessing that someone who knows VBA will see the way to do this right away. Any help would be greatly appreciated. Thanks.

    Read the article

  • Software/hardware to build video streaming server?

    - by Sasha Yanovets
    I am looking for a video streaming server solution, something like online TV server, with ability to make live broadcasts in the internet. What software could you recommend for that? What kind of hardware it should run on, should be there anything special? I am looking for a solution that could be scaled up to at least 1000 simultaneous users online with good resolution of video. I think it is good to have general answer on what direction to choose. But here more details on my specific case: I just looking for a solution almost from scratch. We have some video content that we've produced, but it is not delivered over internet yet. We do not tied to any particular vendor for now. We want to make 24 hours of steaming three 8 hour blocks with change of content every day. We want the ability to make regular live broadcasts. I guess we will need to have several options of streaming quality (low ~56 kb/s mid ~273 kb/s). Some terms just foreign to me (like play-truncation rate), if you could point out what parameters we should avare of, it would be great. Uplink to the internet is to be determined. We plan to start from something and scale up on the way. If you are already have some kind of media streaming server, just describe its configuration here (hardware, OS, software), peak number of concurrent users it serves. I think it could help people approaching this task.

    Read the article

  • IIS server unable to access the file path

    - by anil namde
    I have installed web application behind IIS which access the files/directory located on the another machine. Now while developing the application using the Visual Studio 2008 then Developer Web Server it provides when build the site was able to access the location. However when the site is deployed on the IIS its saying Unable to access the file because of insufficient permissions. Can some one please help regarding what could be the issue ? any idea or pointers could be helpful. Thanks,

    Read the article

< Previous Page | 122 123 124 125 126 127 128 129 130 131 132 133  | Next Page >