Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 124/1407 | < Previous Page | 120 121 122 123 124 125 126 127 128 129 130 131  | Next Page >

  • How does a segment based rendering engine work?

    - by Calmarius
    As far as I know Descent was one of the first games that featured a fully 3D environment, and it used a segment based rendering engine. Its levels are built from cubic segments (these cubes may be deformed as long as it remains convex and sides remain roughly flat). These cubes are connected by their sides. The connected sides are traversable (maybe doors or grids can be placed on these sides), while the unconnected sides are not traversable walls. So the game is played inside of this complex. Descent was software rendered and it had to be very fast, to be playable on those 10-100MHz processors of that age. Some latter levels of the game are huge and contain thousands of segments, but these levels are still rendered reasonably fast. So I think they tried to minimize the amount of cubes rendered somehow. How to choose which cubes to render for a given location? As far as I know they used a kind of portal rendering, but I couldn't find what was the technique used in this particular kind of engine. I think the fact that the levels are built from convex quadrilateral hexahedrons can be exploited.

    Read the article

  • Story of success: MySQL Enterprise Backup (MEB) was successfully integrated with IBM Tivoli Storage Manager (TSM) via System Backup to Tape (SBT) interface.

    - by user13334359
    Since version 3.6 MEB supports backups to tape through the SBT interface.The officially supported tool for such backups to tape is Oracle Secure Backup (OSB).But there are a lot of other Storage Managers. MEB allows to use them through the SBT interface. Since version 3.7 it also has option --sbt-environment which allows to pass environment variables, not needed by OSB, to third-party managers. At the same time MEB can not guarantee it would work with all of them.This month we were contacted by a customer who wanted to use IBM Tivoli Storage Manager (TSM) with MEB. We could only say them same thing I wrote in previous paragraph: this solution is supposed to work, but you have to be pioneers of this technology. And they agreed. They agreed to be the pioneers and so the story begins.MEB requires following options to be specified by those who want to connect it to SBT interface:--sbt-database-name: a name which should be handed over to SBT interface. This can be any name. Default, MySQL, works for most cases, so user is not required to specify this option.--sbt-lib-path: path to SBT library. For TSM this library comes with "Data Protection for Oracle", which, in its turn, interfaces with Oracle Recovery Manager (RMAN), which uses SBT interface. So you need to install it even if you don't use Oracle.--sbt-environment: environment for third-party manager. This option is not needed when you use OSB, but almost always necessary for third-party SBT managers. TSM requires variable TDPO_OPTFILE to be set and point to the TSM configuration file.--backup-image=sbt:: path to the image. Prefix "sbt:" indicates that image should be sent through SBT interfaceSo full command in our case would look like: ./mysqlbackup --port=3307 --protocol=tcp --user=backup_user --password=foobar \ --backup-image=sbt:my-first-backup --sbt-lib-path=/usr/lib/libobk.so \ --sbt-environment="TDPO_OPTFILE=/path/to/my/tdpo.opt" --backup-dir=/path/to/my/dir backup-to-imageAnd this command results in the following output log: MySQL Enterprise Backup version 3.7.1 [2012/02/16] Copyright (c) 2003, 2012, Oracle and/or its affiliates. All Rights Reserved. INFO: Starting with following command line ...  ./mysqlbackup --port=3307 --protocol=tcp --user=backup_user         --password=foobar --backup-image=sbt:my-first-backup         --sbt-lib-path=/usr/lib/libobk.so         --sbt-environment="TDPO_OPTFILE=/path/to/my/tdpo.opt"         --backup-dir=/path/to/my/dir backup-to-image sbt-environment: 'TDPO_OPTFILE=/path/to/my/tdpo.opt' INFO: Got some server configuration information from running server. IMPORTANT: Please check that mysqlbackup run completes successfully.             At the end of a successful 'backup-to-image' run mysqlbackup             prints "mysqlbackup completed OK!". --------------------------------------------------------------------                        Server Repository Options: --------------------------------------------------------------------   datadir                          =  /path/to/data   innodb_data_home_dir             =  /path/to/data   innodb_data_file_path            =  ibdata1:2048M;ibdata2:2048M;ibdata3:64M:autoextend:max:2048M   innodb_log_group_home_dir        =  /path/to/data   innodb_log_files_in_group        =  2   innodb_log_file_size             =  268435456 --------------------------------------------------------------------                        Backup Config Options: --------------------------------------------------------------------   datadir                          =  /path/to/my/dir/datadir   innodb_data_home_dir             =  /path/to/my/dir/datadir   innodb_data_file_path            =  ibdata1:2048M;ibdata2:2048M;ibdata3:64M:autoextend:max:2048M   innodb_log_group_home_dir        =  /path/to/my/dir/datadir   innodb_log_files_in_group        =  2   innodb_log_file_size             =  268435456 Backup Image Path= sbt:my-first-backup mysqlbackup: INFO: Unique generated backup id for this is 13297406400663200 120220 08:54:00 mysqlbackup: INFO: meb_sbt_session_open: MMS is 'Data Protection for Oracle: version 5.5.1.0' 120220 08:54:00 mysqlbackup: INFO: meb_sbt_session_open: MMS version '5.5.1.0' mysqlbackup: INFO: Uses posix_fadvise() for performance optimization. mysqlbackup: INFO: System tablespace file format is Antelope. mysqlbackup: INFO: Found checkpoint at lsn 31668381. mysqlbackup: INFO: Starting log scan from lsn 31668224. 120220  8:54:00 mysqlbackup: INFO: Copying log... 120220  8:54:00 mysqlbackup: INFO: Log copied, lsn 31668381.           We wait 1 second before starting copying the data files... 120220  8:54:01 mysqlbackup: INFO: Copying /path/to/ibdata/ibdata1 (Antelope file format). mysqlbackup: Progress in MB: 200 400 600 800 1000 1200 1400 1600 1800 2000 120220  8:55:30 mysqlbackup: INFO: Copying /path/to/ibdata/ibdata2 (Antelope file format). mysqlbackup: Progress in MB: 200 400 600 800 1000 1200 1400 1600 1800 2000 120220  8:57:18 mysqlbackup: INFO: Copying /path/to/ibdata/ibdata3 (Antelope file format). mysqlbackup: INFO: Preparing to lock tables: Connected to mysqld server. 120220 08:57:22 mysqlbackup: INFO: Starting to lock all the tables.... 120220 08:57:22 mysqlbackup: INFO: All tables are locked and flushed to disk mysqlbackup: INFO: Opening backup source directory '/path/to/data/' 120220 08:57:22 mysqlbackup: INFO: Starting to backup all files in subdirectories of '/path/to/data/' mysqlbackup: INFO: Backing up the database directory 'mysql' mysqlbackup: INFO: Backing up the database directory 'test' mysqlbackup: INFO: Copying innodb data and logs during final stage ... mysqlbackup: INFO: A copied database page was modified at 31668381.           (This is the highest lsn found on page)           Scanned log up to lsn 31670396.           Was able to parse the log up to lsn 31670396.           Maximum page number for a log record 328 120220 08:57:23 mysqlbackup: INFO: All tables unlocked mysqlbackup: INFO: All MySQL tables were locked for 0.000 seconds 120220 08:59:01 mysqlbackup: INFO: meb_sbt_backup_close: blocks: 4162  size: 1048576  bytes: 4363985063 120220  8:59:01 mysqlbackup: INFO: Full backup completed! mysqlbackup: INFO: MySQL binlog position: filename bin_mysql.001453, position 2105 mysqlbackup: WARNING: backup-image already closed mysqlbackup: INFO: Backup image created successfully.:            Image Path: 'sbt:my-first-backup' -------------------------------------------------------------    Parameters Summary -------------------------------------------------------------    Start LSN                  : 31668224    End LSN                    : 31670396 ------------------------------------------------------------- mysqlbackup completed OK!Backup successfully completed.To restore it you should use same commands like you do for any other MEB image, but need to provide sbt* options as well: $./mysqlbackup --backup-image=sbt:my-first-backup --sbt-lib-path=/usr/lib/libobk.so \ --sbt-environment="TDPO_OPTFILE=/path/to/my/tdpo.opt" --backup-dir=/path/to/my/dir image-to-backup-dirThen apply log as usual: $./mysqlbackup --backup-dir=/path/to/my/dir apply-logThen stop mysqld and finally copy-back: $./mysqlbackup --defaults-file=path/to/my.cnf --backup-dir=/path/to/my/dir copy-back  Disclaimer. This is only story of one success which can be useful for someone else. MEB is not regularly tested and not guaranteed to work with IBM TSM or any other third-party storage manager.

    Read the article

  • can't run sqldeveloper on Ubuntu

    - by nazar_art
    I tried to install sqldeveloper by following way: Download SQL Developer from Oracle website (I chose Other Platforms download). Extract file to /opt: sudo unzip sqldeveloper-*-no-jre.zip -d /opt/ sudo chmod +x /opt/sqldeveloper/sqldeveloper.sh Linking over an in-path launcher for Oracle SQL Developer: sudo ln -s /opt/sqldeveloper/sqldeveloper.sh /usr/local/bin/sqldeveloper Edit /usr/local/bin/sqldeveloper.sh replace it's content to: #!/bin/bash cd /opt/sqldeveloper/sqldeveloper/bin ./sqldeveloper "$@" Run SQL Developer: sqldeveloper But it shows next output: nazar@lelyak-desktop:/opt/sqldeveloper? ./sqldeveloper.sh Oracle SQL Developer Copyright (c) 1997, 2014, Oracle and/or its affiliates. All rights reserved. LOAD TIME : 401# # A fatal error has been detected by the Java Runtime Environment: # # SIGSEGV (0xb) at pc=0x00007f3b2dcacbe0, pid=20351, tid=139892273444608 # # JRE version: Java(TM) SE Runtime Environment (7.0_65-b17) (build 1.7.0_65-b17) # Java VM: Java HotSpot(TM) 64-Bit Server VM (24.65-b04 mixed mode linux-amd64 compressed oops) # Problematic frame: # C 0x00007f3b2dcacbe0 # # Core dump written. Default location: /opt/sqldeveloper/sqldeveloper/bin/core or core.20351 # # An error report file with more information is saved as: # /tmp/hs_err_pid20351.log # # If you would like to submit a bug report, please visit: # http://bugreport.sun.com/bugreport/crash.jsp # /opt/sqldeveloper/sqldeveloper/bin/../../ide/bin/launcher.sh: line 1193: 20351 Aborted (core dumped) ${JAVA} "${APP_VM_OPTS[@]}" ${APP_ENV_VARS} -classpath ${APP_CLASSPATH} ${APP_MAIN_CLASS} "${APP_APP_OPTS[@]}" 134 nazar@lelyak-desktop:/opt/sqldeveloper? java -version java version "1.7.0_65" Java(TM) SE Runtime Environment (build 1.7.0_65-b17) Java HotSpot(TM) 64-Bit Server VM (build 24.65-b04, mixed mode) Here is content of /tmp/hs_err_pid20351.log How to solve this trouble?

    Read the article

  • Who is code wanderer?

    - by DigiMortal
    In every area of life there are people with some bad habits or misbehaviors that affect the work process. Software development is also not free of this kind of people. Today I will introduce you code wanderer. Who is code wanderer? Code wandering is more like bad habit than serious diagnose. Code wanderers tend to review and “fix” source code in files written by others. When code wanderer has some free moments he starts to open the code files he or she has never seen before and starts making little fixes to these files. Why is code wanderer dangerous? These fixes seem correct and are usually first choice to do when considering nice code. But as changes are made by coder who has no idea about the code he or she “fixes” then “fixing” usually ends up with messing up working code written by others. Often these “fixes” are not found immediately because they doesn’t introduce errors detected by compilers. So these “fixes” find easily way to production environments because there is also very good chance that “fixed” code goes through all tests without any problems. How to stop code wanderer? The first thing is to talk with person and explain him or her why those changes are dangerous. It is also good to establish rules that state clearly why, when and how can somebody change the code written by other people. If this does not work it is possible to isolate this person so he or she can post his or her changes to code repository as patches and somebody reviews those changes before applying them.

    Read the article

  • Difference between bug, defect and flaw

    - by Hossein
    I was reading "Software Security: Building Security In" and in the first chapter I faced with 3 terms: bug, defect and flaw. The author gave a definition for each of them but I couldn't completely understand these. Can someone give me some examples for each term? What is a defect and what is a flaw? I think I know what bug is, a bug is a malfunction of a part of system which produces undesirable result, be it crashing on a wrong input or miscalculating a series of computations. Can someone elaborate more and correct me if I am wrong in this? UPDATE To be more precise in the book I mentioned above, they (the words) are presented in a way to make a distinction, that's why I am asking to know more. In that book there are some examples denoting which sample belongs to what and which category. For example: Buffer overflow is said to be a bug and issues in method overriding (subclassing issues) is being related to flaw category. Again race condition handling issues are considered bugs and Error-handling problems (fails open) are told to be flaws! I want more elaboration on these regards.

    Read the article

  • Is this project Structure Valid?

    - by rafuru
    I have a dilemma: In the university we learn to create modular software (on java), but this modularity is explained using a single project with packages (a package for business, another one for DAOS and another one for the model, oh and a last package for frontend). But in my work we use the next structure: I will try to explain: First we create a java library project where the model (entities classes) are created in a package. Next we create an EJB named DAOS and using the netbeans wizard we store the DAOS interfaces in the library project in another package , these interfaces are implemented in the DAOS bean. So the next part is the business logic, we create a business EJB for each group of functions , again using the wizard we store the interface in the java library project in another package then is implemented on the business bean. The final part (for the backend) is a bean that I have suggested: a Facade bean who will gather every method of the business beans in a single bean and this has an interface too that is created in our library project and implemented in the bean. So the next part is call the facade module on the web project. But I don't know how valid or viable is this, maybe I'm doing everything wrong and I don't even know! so I want to ask your opinion about this.

    Read the article

  • backface culling error (in world space)

    - by acrilige
    I write simple software renderer. In my pipeline i have stage of backface culling. But looks like it has some error (see picture). I perform culling right after world transformation (is it correct?). (i can't insert picture in post coz i don't have enough points, so i just upload it (cube model): http://imageshack.us/photo/my-images/705/bcerror.png/) Vector3F view_dir(0.0f, 0.0f, 1.0f); std::vector<Triangle> to_remove; for (Triangle &t : m_triangles) { Vector4F e1 = t.v2 - t.v1; Vector4F e2 = t.v3 - t.v1; Vector3F normal( e1.y * e2.z - e1.z * e2.y, e1.z * e2.x - e1.x * e2.z, e1.x * e2.y - e1.y * e2.x ); normal.Normalize(); float dot = Dot(view_dir, normal); if (dot <= 0) to_remove.push_back(t); } for (Triangle& t : to_remove) m_triangles.erase(std::remove(m_triangles.begin(), m_triangles.end(), t), m_triangles.end()); Camera sits in origin and points in screen (RH). What is the reason? For better explanation i upload picture with cube rotation screenshots: http://imageshack.us/photo/my-images/842/bcmove.png/ UPDATED: The error occurs only when triangle has non-zero offset from origin UPDATED 2: If i process backface culling in clip space (after transforming all vertices with view and projection matrix), and just check z coordinate of triangle normal - it works perfect... Can i perform culing RIGHT BEFORE view/proj transforms? In this case looks like culling will not depends of projection and it's not right?.. UPDATED 3: I found answer and will post it in two hours - again coz of reputation lack.

    Read the article

  • How to understand computer science as a whole?

    - by MrCellophane
    I am a college student in Computer Science, I have been studying CS for a long time. But even till today, I still feel so confused about a lot of things. First of all, I have solid foundation in alg, data structure, and OOP, but I don't have a clear understanding of the whole system of the subject. I studied database, alg, data structure, OOP, network, software engineering, OS, and a lot of courses. I know what they are, but I don't know how to connect them together. Is there a way to have a clear understanding of the architecture of the subject? And is there a way to know what technology is used to do what? For example, in interviews, when people ask me alg, data str, Java, OS or any other specific field, I could answer, but when they ask some other very general about the field, I have no idea. Well, I know my question maybe a little bit confusing, but what my situation is I don't even know how to ask a clear question. I don't know my question, it's totally a mess in my head. Is there a way to make it clear?

    Read the article

  • backface culling error

    - by acrilige
    I write simple software renderer. In my pipeline i have stage of backface culling. But looks like it has some error (see picture). I perform culling right after world transformation. (i can't insert picture in post coz i don't have enough points, so i just upload it (cube model): http://imageshack.us/photo/my-images/705/bcerror.png/) Vector3F view_dir(0.0f, 0.0f, 1.0f); std::vector<Triangle> to_remove; for (Triangle &t : m_triangles) { Vector4F e1 = t.v2 - t.v1; Vector4F e2 = t.v3 - t.v1; Vector3F normal( e1.y * e2.z - e1.z * e2.y, e1.z * e2.x - e1.x * e2.z, e1.x * e2.y - e1.y * e2.x ); normal.Normalize(); float dot = Dot(view_dir, normal); if (dot <= 0) to_remove.push_back(t); } for (Triangle& t : to_remove) m_triangles.erase(std::remove(m_triangles.begin(), m_triangles.end(), t), m_triangles.end()); Camera sits in origin and points in screen (RH). What is the reason?

    Read the article

  • Are R&D mini-projects a good activity for interns?

    - by dukeofgaming
    I'm going to be in charge of hiring some interns for our software department soon (automotive infotainment systems) and I'm designing an internship program. The main productive activity "menu" I'm planning for them consists of: Verification testing Writing Unit Tests (automated, with an xUnit-compliant framework [several languages in our projects]) Documenting Code Updating wiki Updating diagrams & design docs Helping with low priority tickets (supervised/mentored) Hunting down & cleaning compiler/run-time warnings Refactoring/cleaning code against our coding standards But I also have this idea that having them do small R&D projects would be good to test their talent and get them to have fun. These mini-projects would be: Experimental implementations & optimizations Proof of concept implementations for new technologies Small papers (~2-5 pages) doing formal research on the previous two points Apps (from a mini-project pool) These kinds of projects would be pre-defined and very concrete, although new ideas from the interns themselves would be very welcome. Even if a project is too big or is abandoned, the idea would also be to lay the ground work so they can be retaken by another intern or intern team. While I think this is good in concept, I don't know if it could be good in practice, as obviously this would diminish their productivity on "real work" (work with immediate value to the company), but I think it could help bring aboard very bright people and get them to want to stay in the future (which, I think, is the end goal for any internship program). My question here is if these activities are too open ended or difficult for the average intern to accomplish and if R&D is an efficient use of an interns time or if it makes more sense for to assign project work to interns instead.

    Read the article

  • As my first professional position should I take it at a start-up or a better known company? [closed]

    - by Carl Carlson
    I am a couple of months removed from graduating with a CS degree and my gpa wasn't very high. But I do have aspirations of becoming a good software developer. Nevertheless I got two job offers recently. One is with a small start-up and the other is with a military contractor. The military contractor asked for my gpa and I gave it to them. The military contracting position is in developing GIS related applications which I was familiar with in an internship. After receiving an offer from the military contractor, I received an offer from the start-up after the start-up asked me how much the offer was from the military contractor. So the pay is even. The start-up would require I be immediately thrust into it with only two other people in the start-up currently and I would have to learn everything on my own. The military contractor has teams and people who know what their doing and would be able to offer me guidance. Seeing as how I have been a couple of months removed from school and need something of a refresher is it better than I just dive into the start-up and diversify what I've learned or be specialized on a particular track? Some more facts about the start-up: It deals with military contracts as well and is in Phase 2 of contracts. It will require I learn a diverse amount of technologies including cyber security, android development, python, javascript, etc. The military contractor will have me learn more C#, refine my Java, do javascript, and GIS related technologies. I might as well come out and say the military contractor is Northrop Grumman and more or less offered me less money than the projected starting salary from online salary calculators. But there is the possibility of bonuses, while the start-up doesn't include the possibility of bonuses. I think benefits for both are relatively the same.

    Read the article

  • What have you learned from the bugs you helped discover and fix?

    - by Ethel Evans
    I liked the core of this question, and wanted to re-ask it in a way that made it less about 'fun' and more about 'What do these past mistakes tell us about how we can write and test software better?' As an SDET, I'm always looking for anecdotes about new and interesting ways that programs can fail. I've learned a lot from these tales in the past, and would like to get that from the intelligent people in this community as well. I'd be interested in hearing what the issue was, how it was caught, if you think there was anything that could have reasonably done to catch it earlier or to avoid the same issue on later projects, and any other interesting lessons you took away from this bug. Please only write about bugs you personally were involved with, ideally on a project you worked on (e.g., no "10 years before I was born, this happened and it was FUNNY!" answers). Please vote up answers that are thought-provoking or could change how you develop or test in some way, so this isn't just 'social fun'. Try to avoid voting up something just because it was funny.

    Read the article

  • Which pattern is best for large project

    - by shamim
    I have several years of software development experience, but I am not a keen and adroit programmer, to perform better I need helping hands. Recently I engaged in an ERP project. For this project want a very effective structure, which will be easily maintainable and have no compromise about performance issue. Below structures are now present in my old projects. Entity Layer BusinessLogic Layer. DataLogic Layer UI Layer. Bellow picture describe how they are internally connected. For my new project want to change my project structure, I want to follow below steps: Core Layer(common) BLL DAL Model UI Bellow picture describe how they are internally connected. Though goggling some initial type question’s are obscure to me, they are : For new project want to use Entity framework, is it a good idea? Will it increase my project performance? Will it more maintainable than previous structure? Entity Framework core disadvantages/benefits are? For my project need help to select best structure. Will my new structure be better than the old one?

    Read the article

  • Sucking Less Every Year ?

    - by AdityaGameProgrammer
    Sucking Less Every Year A trail of thought that had been on my mind for a while Quoting directly from the post I've often thought that sucking less every year is how humble programmers improve. You should be unhappy with code you wrote a year ago. If you aren't, that means either A) you haven't learned anything in a year, B) your code can't be improved, or C) you never revisit old code. All of these are the kiss of death for software developers. How often does this happen or not happen to you? How long before you see an actual improvement in your coding ? month, year? Do you ever revisit Your old code? How often does your old code plague you? or how often do you have to deal with your technical debt. It is definitely very painful to fix old bugs n dirty code that we may have done to quickly meet a deadline and those quick fixes ,some cases we may have to rewrite most of the application/code. No arguments about that. Some of the developers i had come across argued that they were already at the evolved stage where their coding doesn't need improvement or cant get improved anymore. Does this happen? If so how many years into coding on a particular language does one expect this to happen?

    Read the article

  • Photoshop alternative with same keyboard shorcuts

    - by user292254
    tldr; Is there a program with the same keyboard shortcuts and/or user interface as PS. I know the "photoshop alternative" question has been asked so many times, but I feel this variant is worth the time to ask. I am a web designer and have been using PS daily on a windows or mac machine for about 10 years, but I do most of my development in linux. The only thing that has been keeping me from the full switch to linux is PS. I have tried many alternatives, including GIMP, but I feel the barrier to entry is too high for one reason and one reason only, the keyboard shortcuts. Over the years I have become very adept and quick in the use of PS because of keyboard shortcuts and muscle memory. I realize that many shortcuts can be customized, but many actions are just too different from PS. So my question is what programs are out there that are the closest to PS in keyboard shortcuts and interface. I don't care if I have to do a bunch of customization to get it as close as possible, but I just can't take too much time to learn a completely new workflow. Of course I realize that any software will take time and effort, I just want to make that time/effort as minimal as possible. Thanks in advance for your responses. edit I should tell you the most important features and workflow I use on a daily basis are, Smart objects, linked documents, save for web and devises.

    Read the article

  • Is file permission secured when it transferred from Ubuntu to Windows?

    - by Gaurav_Java
    I am having 9GB text file which is encrypted . This file contains some confidential data . Which is on my system(Ubuntu) and my external HDD (ntfs) . This file get daily updated and then encrypted . But it has to be shared among 2-3 (Windows) person. I defined permission so that no other person can even read this file(chmod 660). It is too large file, so I can't upload it anywhere and it get updated daily basis. But this file travel on Windows OS and Ubuntu also. Even I am having copy of this on my personal computer. Recently it was deleted by some other user over Windows . I just want to know how can I set permission over that file so that it cannot be deleted from any other operating system. If someone delete this file, then I am having data old for couple of days, which is only on my system. I gone through this question it says there is nothing. And from this question I am not able to understand how can I protect it. Can I do anything for preventing this file from being deleted. Then how can I secure this files from getting deleted any suggestion or software or ideas. Maybe I sound silly or this is stupid question. Please don't close it, thanks for any suggestion or solution.

    Read the article

  • "rst2html: command not found" after installing docutils?

    - by AP257
    Hi I've installed docutils on my Mac OS system following the docutils instructions. I've also done: $ sudo cp tools/buildhtml.py tools/rst2html.py /usr/local/bin However, if I open a command line and type rst2html, I get 'command not found'. If I type rst2html.py, there's no problem, so the Python file itself is on my path. How do I get my system to recognize rst2html as a valid command? Thanks!

    Read the article

  • How does a segment-based rendering engine (as in Descent) work?

    - by Calmarius
    As far as I know Descent was one of the first games that featured a fully 3D environment, and it used a segment based rendering engine. Its levels are built from cubic segments (these cubes may be deformed as long as it remains convex and sides remain roughly flat). These cubes are connected by their sides. The connected sides are traversable (maybe doors or grids can be placed on these sides), while the unconnected sides are not traversable walls. So the game is played inside of this complex. Descent was software rendered and it had to be very fast, to be playable on those 10-100MHz processors of that age. Some latter levels of the game are huge and contain thousands of segments, but these levels are still rendered reasonably fast. So I think they tried to minimize the amount of cubes rendered somehow. How to choose which cubes to render for a given location? As far as I know they used a kind of portal rendering, but I couldn't find what was the technique used in this particular kind of engine. I think the fact that the levels are built from convex quadrilateral hexahedrons can be exploited.

    Read the article

  • Installing Visual Studio 2010 SP1 or Windows Phone tools in your VM (danger!)

    - by Jeff
    If you've read my blog for any amount of time, you probably know that I tend to develop stuff in a Parallels VM on a Mac. It's how I roll. I like VM's because I can trash them and do really stupid things with beta software. That said, there is a pain point that doesn't seem that well documented when it comes to installing stuff in this scenario.The WP7 tools, and SP1 for Visual Studio 2010 (perhaps only if you already have the WP7 tools installed, I'm not sure), do something strange on install. As if it weren't already a long and slow installation, for reasons I don't understand, the installer fires up an instance of Windows Phone Emulator. As you may already know, the emulator doesn't run in a VM, because it is itself a VM, apparently. What it will do is fire up your CPU, make your comprooder hot and make the fans blow harder.I found this out accidentally, as I started the (slow) phone tool installation once, and walked away. An hour and a half later, I came back to find it hadn't finished. But it was hot and the CPU was pegged, so I fired up the task manager to find XDE.exe, the phone emulator, cranking away. I had to kill it several times, and eventually the install finished. It fired up just once in the SP1 install, but it still had the same hanging effect.I can't for the life of me figure out why it does this. In a VM, I can connect the phone to it and use that, so I don't need the emulator. But this install, firing up the emulator, will make it choke until you kill the XDE.exe process. Watch out!

    Read the article

  • putting folders above public_html in a shared hosting environment

    - by redconservatory
    On my local environment, the following settings work in my index.php file: $system_path = '../../ci/system/'; $application_folder = '../../ci/application'; My folder structure looks like this: -ci ---system ---application -public_html ---site ----index.php This works on my local environment, but when I upload my files, I get an error message: Your system folder path does not appear to be set correctly. Please open the following file and correct this: index.php I tried the following: $system_path = dirname(__FILE__).'../../ci/system/'; $application_folder = dirname(__FILE__).'../../ci/application';

    Read the article

  • Using pkexec policy to run out of /opt/

    - by liberavia
    I still try to make it possible to run my app with root priveleges. Therefore I created two policies to run the application via pkexec (one for /usr/bin and one for /opt/extras... ) and added them to the setup.py: data_files=[('/usr/share/polkit-1/actions', ['data/com.ubuntu.pkexec.armorforge.policy']), ('/usr/share/polkit-1/actions', ['data/com.ubuntu.extras.pkexec.armorforge.policy']), ('/usr/bin/', ['data/armorforge-pkexec'])] ) additionally I added a startscript which uses pkexec for starting the application. It distinguishes between the two places and is used in the Exec-Statement of the desktopfile: #!/bin/sh if [ -f /opt/extras.ubuntu.com/armorforge/bin/armorforge ]; then pkexec "/opt/extras.ubuntu.com/armorforge/bin/armorforge" "$@" else pkexec `which armorforge` "$@" fi If I simply do a quickly package everything will work right. But if I package with extras option: quickly package --extras the Exec-statement will be exchanged. Even if I try to simulate the pkexec call via armorforge-pkexec It will aks for a password and then returns this: andre@andre-desktop:~/Entwicklung/Ubuntu/armorforge$ armorforge-pkexec (armorforge:10108): GLib-GIO-ERROR **: Settings schema 'org.gnome.desktop.interface' is not installed Trace/breakpoint trap (core dumped) So ok, I could not trick the opt-thing. How can I make sure, that my Application will run with root priveleges out of opt. I copied the way of using pkexec from synaptic. My application is for communicating with apparmor which currently has no dbus interface. Else I need to write into /etc/apparmor.d-folder. How should I deal with the opt-build which, as far as I understand, is required to submit my application to the ubuntu software center. Thanks for any hints and/or links :-)

    Read the article

  • GUI based backup utility [closed]

    - by Chethan S.
    Possible Duplicate: Comparison of backup tools I have read favorable reviews for 'Back In Time' for the purpose stated above. Still I am posting this question as I have some demands in my mind. Few years back I was using ThinkVantage Rescue and Recovery by IBM on my Lenovo PC under Windows. That provided me nice features like compressed backups, boot time options - OS Repair, Restore entire OS, restore entire system to an older date, restore individual files etc. Out of these the feature I liked the most was compressed backups. Similar features are available in software like Norton Ghost too. In Back In Time I was surprised to see that the snapshot takes up same amount of space as that of the original contents, no compression at all. Furthermore, I was not able to find options to change the compression ratio etc. under settings. According to me compression of backups is a must have feature. Therefore, can anyone suggest me any other utility which can serve the purpose. I insist on GUI based tool since I don't want to mess up with backups!

    Read the article

  • Update get's stuck unpacking bad package, won't continue without it

    - by Shazzner
    Removing the package from cache, and disabling Recommended Updates in Software Sources gives me an error saying I need to install this package. I've tried to update several times, but it keeps hanging on unpacking the ubuntu-sso-client package. Which forces me to hard-reset to unlock the package manager. I've tried: sudo dpkg --configure -a No errors sudo apt-get upgrade --fix-broken Wants me to reinstall said package, resulting in it hanging Removing the package: sudo rm -f /var/cache/apt/archives/ubuntu-sso-client_1.0.8-0ubuntu1_all.deb Results in the same effect, it re-downloads then hangs I can de-select Recommended Updates but I get error messages when I try to update again: E: The package ubuntu-sso-client needs to be reinstalled, but I can't find an archive for it. Which won't let me continue Finally re-enabling the source, I try to remove ubuntu-sso sudo apt-get remove ubuntu-sso-client It removes a bunch of other packages but complains about the package: dpkg: error processing ubuntu-sso-client (--remove): Package is in a very bad inconsistent state - you should reinstall it before attempting a removal. Reinstalling ubuntu-sso-client hangs :( I'm at my wits end, any ideas? I would be nice to install all the other updates but this one is preventing it.

    Read the article

< Previous Page | 120 121 122 123 124 125 126 127 128 129 130 131  | Next Page >