Search Results

Search found 956 results on 39 pages for 'synchronization'.

Page 26/39 | < Previous Page | 22 23 24 25 26 27 28 29 30 31 32 33  | Next Page >

  • Developing Schema Compare for Oracle (Part 2): Dependencies

    - by Simon Cooper
    In developing Schema Compare for Oracle, one of the issues we came across was the size of the databases. As detailed in my last blog post, we had to allow schema pre-filtering due to the number of objects in a standard Oracle database. Unfortunately, this leads to some quite tricky situations regarding object dependencies. This post explains how we deal with these dependencies. 1. Cross-schema dependencies Say, in the following database, you're populating SchemaA, and synchronizing SchemaA.Table1: SOURCE   TARGET CREATE TABLE SchemaA.Table1 ( Col1 NUMBER REFERENCES SchemaB.Table1(Col1));   CREATE TABLE SchemaA.Table1 ( Col1 VARCHAR2(100) REFERENCES SchemaB.Table1(Col1)); CREATE TABLE SchemaB.Table1 ( Col1 NUMBER PRIMARY KEY);   CREATE TABLE SchemaB.Table1 ( Col1 VARCHAR2(100) PRIMARY KEY); We need to do a rebuild of SchemaA.Table1 to change Col1 from a VARCHAR2(100) to a NUMBER. This consists of: Creating a table with the new schema Inserting data from the old table to the new table, with appropriate conversion functions (in this case, TO_NUMBER) Dropping the old table Rename new table to same name as old table Unfortunately, in this situation, the rebuild will fail at step 1, as we're trying to create a NUMBER column with a foreign key reference to a VARCHAR2(100) column. As we're only populating SchemaA, the naive implementation of the object population prefiltering (sticking a WHERE owner = 'SCHEMAA' on all the data dictionary queries) will generate an incorrect sync script. What we actually have to do is: Drop foreign key constraint on SchemaA.Table1 Rebuild SchemaB.Table1 Rebuild SchemaA.Table1, adding the foreign key constraint to the new table This means that in order to generate a correct synchronization script for SchemaA.Table1 we have to know what SchemaB.Table1 is, and that it also needs to be rebuilt to successfully rebuild SchemaA.Table1. SchemaB isn't the schema that the user wants to synchronize, but we still have to load the table and column information for SchemaB.Table1 the same way as any table in SchemaA. Fortunately, Oracle provides (mostly) complete dependency information in the dictionary views. Before we actually read the information on all the tables and columns in the database, we can get dependency information on all the objects that are either pointed at by objects in the schemas we’re populating, or point to objects in the schemas we’re populating (think about what would happen if SchemaB was being explicitly populated instead), with a suitable query on all_constraints (for foreign key relationships) and all_dependencies (for most other types of dependencies eg a function using another function). The extra objects found can then be included in the actual object population, and the sync wizard then has enough information to figure out the right thing to do when we get to actually synchronize the objects. Unfortunately, this isn’t enough. 2. Dependency chains The solution above will only get the immediate dependencies of objects in populated schemas. What if there’s a chain of dependencies? A.tbl1 -> B.tbl1 -> C.tbl1 -> D.tbl1 If we’re only populating SchemaA, the implementation above will only include B.tbl1 in the dependent objects list, whereas we might need to know about C.tbl1 and D.tbl1 as well, in order to ensure a modification on A.tbl1 can succeed. What we actually need is a graph traversal on the dependency graph that all_dependencies represents. Fortunately, we don’t have to read all the database dependency information from the server and run the graph traversal on the client computer, as Oracle provides a method of doing this in SQL – CONNECT BY. So, we can put all the dependencies we want to include together in big bag with UNION ALL, then run a SELECT ... CONNECT BY on it, starting with objects in the schema we’re populating. We should end up with all the objects that might be affected by modifications in the initial schema we’re populating. Good solution? Well, no. For one thing, it’s sloooooow. all_dependencies, on my test databases, has got over 110,000 rows in it, and the entire query, for which Oracle was creating a temporary table to hold the big bag of graph edges, was often taking upwards of two minutes. This is too long, and would only get worse for large databases. But it had some more fundamental problems than just performance. 3. Comparison dependencies Consider the following schema: SOURCE   TARGET CREATE TABLE SchemaA.Table1 ( Col1 NUMBER REFERENCES SchemaB.Table1(col1));   CREATE TABLE SchemaA.Table1 ( Col1 VARCHAR2(100)); CREATE TABLE SchemaB.Table1 ( Col1 NUMBER PRIMARY KEY);   CREATE TABLE SchemaB.Table1 ( Col1 VARCHAR2(100)); What will happen if we used the dependency algorithm above on the source & target database? Well, SchemaA.Table1 has a foreign key reference to SchemaB.Table1, so that will be included in the source database population. On the target, SchemaA.Table1 has no such reference. Therefore SchemaB.Table1 will not be included in the target database population. In the resulting comparison of the two objects models, what you will end up with is: SOURCE  TARGET SchemaA.Table1 -> SchemaA.Table1 SchemaB.Table1 -> (no object exists) When this comparison is synchronized, we will see that SchemaB.Table1 does not exist, so we will try the following sequence of actions: Create SchemaB.Table1 Rebuild SchemaA.Table1, with foreign key to SchemaB.Table1 Oops. Because the dependencies are only followed within a single database, we’ve tried to create an object that already exists. To fix this we can include any objects found as dependencies in the source or target databases in the object population of both databases. SchemaB.Table1 will then be included in the target database population, and we won’t try and create objects that already exist. All good? Well, consider the following schema (again, only explicitly populating SchemaA, and synchronizing SchemaA.Table1): SOURCE   TARGET CREATE TABLE SchemaA.Table1 ( Col1 NUMBER REFERENCES SchemaB.Table1(col1));   CREATE TABLE SchemaA.Table1 ( Col1 VARCHAR2(100)); CREATE TABLE SchemaB.Table1 ( Col1 NUMBER PRIMARY KEY);   CREATE TABLE SchemaB.Table1 ( Col1 VARCHAR2(100) PRIMARY KEY); CREATE TABLE SchemaC.Table1 ( Col1 NUMBER);   CREATE TABLE SchemaC.Table1 ( Col1 VARCHAR2(100) REFERENCES SchemaB.Table1); Although we’re now including SchemaB.Table1 on both sides of the comparison, there’s a third table (SchemaC.Table1) that we don’t know about that will cause the rebuild of SchemaB.Table1 to fail if we try and synchronize SchemaA.Table1. That’s because we’re only running the dependency query on the schemas we’re explicitly populating; to solve this issue, we would have to run the dependency query again, but this time starting the graph traversal from the objects found in the other database. Furthermore, this dependency chain could be arbitrarily extended.This leads us to the following algorithm for finding all the dependencies of a comparison: Find initial dependencies of schemas the user has selected to compare on the source and target Include these objects in both the source and target object populations Run the dependency query on the source, starting with the objects found as dependents on the target, and vice versa Repeat 2 & 3 until no more objects are found For the schema above, this will result in the following sequence of actions: Find initial dependenciesSchemaA.Table1 -> SchemaB.Table1 found on sourceNo objects found on target Include objects in both source and targetSchemaB.Table1 included in source and target Run dependency query, starting with found objectsNo objects to start with on sourceSchemaB.Table1 -> SchemaC.Table1 found on target Include objects in both source and targetSchemaC.Table1 included in source and target Run dependency query on found objectsNo objects found in sourceNo objects to start with in target Stop This will ensure that we include all the necessary objects to make any synchronization work. However, there is still the issue of query performance; the CONNECT BY on the entire database dependency graph is still too slow. After much sitting down and drawing complicated diagrams, we decided to move the graph traversal algorithm from the server onto the client (which turned out to run much faster on the client than on the server); and to ensure we don’t read the entire dependency graph onto the client we also pull the graph across in bits – we start off with dependency edges involving schemas selected for explicit population, and whenever the graph traversal comes across a dependency reference to a schema we don’t yet know about a thunk is hit that pulls in the dependency information for that schema from the database. We continue passing more dependent objects back and forth between the source and target until no more dependency references are found. This gives us the list of all the extra objects to populate in the source and target, and object population can then proceed. 4. Object blacklists and fast dependencies When we tested this solution, we were puzzled in that in some of our databases most of the system schemas (WMSYS, ORDSYS, EXFSYS, XDB, etc) were being pulled in, and this was increasing the database registration and comparison time quite significantly. After debugging, we discovered that the culprits were database tables that used one of the Oracle PL/SQL types (eg the SDO_GEOMETRY spatial type). These were creating a dependency chain from the database tables we were populating to the system schemas, and hence pulling in most of the system objects in that schema. To solve this we introduced blacklists of objects we wouldn’t follow any dependency chain through. As well as the Oracle-supplied PL/SQL types (MDSYS.SDO_GEOMETRY, ORDSYS.SI_COLOR, among others) we also decided to blacklist the entire PUBLIC and SYS schemas, as any references to those would likely lead to a blow up in the dependency graph that would massively increase the database registration time, and could result in the client running out of memory. Even with these improvements, each dependency query was taking upwards of a minute. We discovered from Oracle execution plans that there were some columns, with dependency information we required, that were querying system tables with no indexes on them! To cut a long story short, running the following query: SELECT * FROM all_tab_cols WHERE data_type_owner = ‘XDB’; results in a full table scan of the SYS.COL$ system table! This single clause was responsible for over half the execution time of the dependency query. Hence, the ‘Ignore slow dependencies’ option was born – not querying this and a couple of similar clauses to drastically speed up the dependency query execution time, at the expense of producing incorrect sync scripts in rare edge cases. Needless to say, along with the sync script action ordering, the dependency code in the database registration is one of the most complicated and most rewritten parts of the Schema Compare for Oracle engine. The beta of Schema Compare for Oracle is out now; if you find a bug in it, please do tell us so we can get it fixed!

    Read the article

  • Exchange can't send emails with attachments

    - by Jack
    No one in our organization can send emails with attachments. Emails without attachments go through fine, but if an attachment is included, an error appears in the Server Failures folder under Sync Issues. The error is "The following message had an error and synchronization of it was skipped (0xc0090081)". We are using Symantec Mail Security, which we shut down to try to troubleshoot the problem, and now that fails to load. Any ideas as to what to check? I'm sorry I don't have more complete information, but I'm helping someone try to figure this out. I'm not the admin myself. Thanks.

    Read the article

  • Password manager solution: Symbian based phone and a Linux machine (Windows is not important, but wo

    - by Kent
    Hi, I currently use KeePassX to manage my passwords on my Linux (Xubuntu) machine. It's nice to have all the passwords encrypted, but sometimes I'd like to be able to tell a password when I'm on the run. Therefore I'm looking for a solution which I can synchronize with my phone. I have a Nokia N82 which is a Symbian OS v9.2 based phone for the S60 3rd Edition platform with Feature Pack 1. I like an open source solution if it's possible. In case it isn't I wouldn't mind paying for a good solution. If Windows may be added to the synchronization mix it's nice, but it's absolutely not a primary requirement (I don't even have any computer running Windows).

    Read the article

  • Analyzing Memory Usage: Java vs C++ Negligible?

    - by Anthony
    How does the memory usage of an integer object written in Java compare\contrast with the memory usage of a integer object written in C++? Is the difference negligible? No difference? A big difference? I'm guessing it's the same because an int is an int regardless of the language (?) The reason why I asked this is because I was reading about the importance of knowing when a program's memory requirements will prevent the programmer from solving a given problem. What fascinated me is the amount of memory required for creating a single Java object. Take for example, an integer object. Correct me if I'm wrong but a Java integer object requires 24 bytes of memory: 4 bytes for its int instance variable 16 bytes of overhead (reference to the object's class, garbage collection info & synchronization info) 4 bytes of padding As another example, a Java array (which is implemented as an object) requires 48+bytes: 24 bytes of header info 16 bytes of object overhead 4 bytes for length 4 bytes for padding plus the memory needed to store the values How do these memory usages compare with the same code written in C++? I used to be oblivious about the memory usage of the C++ and Java programs I wrote, but now that I'm beginning to learn about algorithms, I'm having a greater appreciation for the computer's resources.

    Read the article

  • FTP client that supports 2 concurrent FTP sessions

    - by oninea
    I'm looking for an FTP client that can connect to two different FTP servers at the same time and allow file transfer or synchronization between those two servers. Basically what I want to achieve is to transfer/synchronize files between 2 different sites from my local machine. Are there any clients around that support this functionality? If there are none, is there an alternative to achieve this? I've taken a look at net2ftp, a web based FTP client, which provides almost the same functionality that I need. What I'm looking for though is a desktop app. Any ideas?

    Read the article

  • Experiences with Ubuntu One?

    - by rsuarez
    I'm currently testing several backup/sync services: Dropbox, SpiderOak and Ubuntu One. Of them, Dropbox is the winner hands down; SpiderOak is nice too, but a bit more intrusive and unpredictable (sometimes is slow in syncing some files, or doesn't sync them at all). Ubuntu One has promise, but I've used it much less than the other two. I'm thinking about buying a "20 pack" and using Ubuntu One as my only synchronization software. It's the cheapest of them all (3$/month vs 10$ in Dropbox and SpiderOak), and 20GB of space is enough for me. My intention is to sync most of my $HOME folder. All the computers I'll connect will have Ubuntu installed, so not being multiplatform doesn't really matter to me. If its performance is as good as Dropbox's, I'm sold. But I'd like to gauge some experiences here first. Is anyone using it seriously? I.e., to sync a lot of files that change often (like the aforementioned $HOME folder, program sources, or something alike). What have been your experiences? Thanks in advance.

    Read the article

  • Videos: Getting Started with Java Embedded

    - by Tori Wieldt
    Are you a Java developer? That means you can write applications for embedded processors! There are new six new videos up on the YouTube/Java channel that you can watch to get more information. To get an overview, watch James Allen of Oracle Global Business Development give OTN a tour of the Oracle booth at ARM Techcon. He also explains the huge opportunity for Java in the embedded space. These videos from Oracle Engineering show you how to leverage your knowledge to seamlessly develop in a space that is really taking off. Java SE Embedded Development Made Easy, Part 1 This video demonstrates how developers already familiar with the Java SE development paradigm can leverage their knowledge to seamlessly develop on very capable embedded processors. Part one of a two-part series. Java SE Embedded Development Made Easy, Part 2 This video demonstrates how developers already familiar with the Java SE development paradigm can leverage their knowledge to seamlessly develop on very capable embedded processors. Part two of a two-part series. Mobile Database Synchronization - Healthcare Demonstration This video demonstrates how a good portion of Oracle's embedded technologies (Java SE-Embedded, Berkeley DB, Database Mobile Server) can be applied to a medical application. Tomcat Micro Cluster See how multiple embedded devices installed with Java Standard Edition HotSpot for Armv5/Linux and Apache Tomcat can be configured as a micro cluster. Java Embedded Partnerships Kevin Smith of Oracle Technical Business Development explains what's new for partners and Java developers in the embedded space. Learn how you can start prototyping for Qualcomm's new Orion board before it's available. (Sorry about the video quality, the booth lights were weird.)   Visit the YouTube/Java channel for other great Java videos. <fade to black>

    Read the article

  • Use Windows Briefcase from the command line

    - by Daniel
    I have a thumb drive on which I take many of my files with me. I would like to synchronize it with my computer automatically when I connect it. I currently have a script run every time I connect it so that I can do the many things that need to be done when it connects (check for updates to the portable applications, etc.). I want my synchronization utility to: Detect conflicts work correctly when I move files or change the folder structure tell the difference between a file that was deleted on one side and a file that was added on the other work from the command line or at least have a command that will open up a window provide a confirmation screen before doing anything The Windows Briefcase does all of these except the command line. Is there any program that does all of these, or is there a way to synchronize the briefcase from the command line?

    Read the article

  • How to synchronize two folders on two remote Linux virtual machines

    - by Manoj Agarwal
    I have two virtual machines, Host OS is ESXi 3.5 and guest OS is Centos 4.6. There are two ESXi servers remotely located, each containing a Centos 4.6 virtual machine. I wish, whatever change I make in any file/folder in one virtual machine should be automatically synchronized on other remote virtual machine. The synchronization process should be automatic. It should only sync differentials, not simulate entire copy with overwrite operation. Sync should be intelligent enough to look for what has changed and what not, and should only update the changed files/folders. Further, there should be some sort of overview and selection for syncing, for example, if it shows 4 files have changed, It should be possible to sync only two files and leave other two for the time being. So, some intelligent syncing mechanism for Linux is needed.

    Read the article

  • pros-cons of separate hosting accounts versus using addon domain

    - by hen3ry
    Folks: For historical reasons, I have "Site A" on "Hosting Account A", and "Site B" on "Account B", totally independent accounts with the same vendor, Bluehost. Both are primary domains. Now that Hosting Account B is just about to expire, I'm considering letting it disappear and moving Site B to an Addon domain on "Account A". Both sites are non-commercial, narrow-interest, very-low-traffic, hundreds of page views per month. The file weights for the sites are non-trivial, especially as I like to install specialized CMSs in subdomains. Since Bluehost allows unlimited hosting space there should be no issue with the file load, except I've seen hints of an issue with total file count, maybe 50k files -- which I'm not currently close to hitting, but might eventually. My question: what are the pros and cons of using separate accounts versus hosting Site B as an addon domain? Obviously, using a single account is cheaper by half, and I know that my authoring environment (DreamWeaver CS5) complains when it detects nested source trees, telling me "Synchronization" might fail in such cases, but I don't depend on this feature. What other factors should I consider? TIA

    Read the article

  • Mac OS X Server mobile account VS Time Machine Network Backup

    - by elhombre
    I am installing a Server @home to manage the mac client's of my family. First I wanted to make time machine Backups over the internal network to an external Hard-drive which is connected to my Mac OS X Server (10.6) but when I read about the mobile accounts and it's synchronization features I got a little bit irritated what the differences between the two Services are. So where are the differences between a mobile account and a Time Machine Backup which is made over the network? Can the synchronized mobile Account be backup to an external Harddisk, if yes, how?

    Read the article

  • RDS Replication across regions

    - by Bryan Migliorisi
    We are using Amazon AWS for our web services but given the recent instabilities in their infrastructure, we are trying to figure out how to run our application across multiple regions for additional redundancy. Ideally, we would run our entire app in a active-active configuration in multiple regions but our main concern is that we are using RDS, which I understand cannot replicate across regions. One possible solution (though we have not tried or proven it would work) would be to do mysqldump or EBS snapshots every hour or so but this would mean that we would be forced to run in an active-passive configuration. Our data would be at most an hour behind. This carries its own issues around data synchronization when we failover and the master comes back up, so its not the best solution. Are there any proven solutions for replicating RDS across regions?

    Read the article

  • Daylight Savings Time and Microsoft Exchange woes

    - by Scott
    Ever since the switch from Standard Time to Daylight Time, the time on our e-mail messages has been ahead by one hour. This symptom has me wondering if the cause is improper configuration of daylight savings settings. Since we're in a client/server environment, the clients synchronize with the server, and the server synchronizes with Boulder, Colorado. If I set both the server and the clients to automatically switch to daylight savings, the clients seem to regard the server as being set to Standard Time and set themselves an hour ahead of it, which is really two hours ahead. Should the server switch to daylight savings and the clients follow along on their next synchronization, or should the server stay on Standard Time and the clients switch over? The system clock on the Exchange Server is currently displaying the correct time. How do I get the e-mail messages to display the correct time in Outlook?

    Read the article

  • Resolution changes when using switch

    - by Edward D
    So, the "real" resolution of my monitor is 1024x768. That's what I'd use on my docked Windows laptop, and what I'd use on my Xubuntu desktop connected directly. When I connect a switch, to switch between the two, however, the ubuntu machine's resolution changes. Everything's still proportional, and it still thinks it's doing 1024x768, but the icons and fonts appear larger. Not 800x600 larger, but still big. When I used Xubuntu Precise, I created an xorg.conf file to set a resolution of 1280x1024 which made it look the way it does without the switch ... as a workaround. When I upgraded to Trusty, I lost this. I tried to re-create it, but doesn't seem to load my file. Ideally, I'd like to correct the original problem, but I'd settle for being able to up the resolution. I searched for a while, and tried to do it, but I'm giving up ... please help me out. Controller: Intel Corporation 82915G/P/GV/GL/PL/910GL Memory Controller Hub (rev 04) Monitor: NEC MultiSync LCD 1850e http://www.necdisplay.com/documents/UserManuals/LCD1850E_manual.pdf OS: Xubuntu 14.04 Trusty /etc/X11/xorg.conf: # YOU CREATED THIS FILE # sudo leafpad /etc/X11/xorg.conf Section "Device" Identifier "Configured Video Device" EndSection Section "Monitor" Identifier "NEC LCD1850E" # I found Synchronization Range at: # http://www.necdisplay.com/documents/UserManuals/LCD1850E_manual.pdf HorizSync 31.0-82.0 VertRefresh 55.0-85.0 EndSection Section "Screen" Identifier "Default Screen" Monitor "NEC LCD1850E" Device "Configured Video Device" SubSection "Display" Depth 24 Modes "1280x1024" "1280x960" "1024x768" "800x600" "848x480" "640x480" EndSubSection EndSection

    Read the article

  • How To: Transfer Categories in Outlook 2007 from One Installation to Another Using Google Sync

    - by nicorellius
    I use Outlook 2007 for email. I also happen to use the categories for organizing my mail. This function is cool, because you can use keyboard shortcuts that make categorizing mail quick and easy. The problem I am having is that, since I use Google Apps Sync at home and at work, I can't seem to figure out how to transfer the existing category assignments that I spent months creating at work. As my email comes and goes, I assign this and that, with thousands of messages all belonging to specific categories. When I finally installed and started using Google Apps Sync at home, the synchronization process works great, but all my messages are blank, i.e., don't have the color categories I assigned at work. What's worse, I actually changed computers at work, and now am facing the same problem on the new workstation. Using: Windows XP Pro, Outlook 2007, Google Apps. Anyone run into this and find a solution?

    Read the article

  • Messaging with KnockoutJs

    - by Aligned
    MVVM Light has Messaging that helps keep View Models decoupled, isolated, and keep the separation of concerns, while allowing them to communicate with each other. This is a very helpful feature. One View Model can send off a message and if anyone is listening for it, they will react, otherwise nothing will happen. I now want to do the same with KnockoutJs View Models. Here are some links on how to do this: http://stackoverflow.com/questions/9892124/whats-the-best-way-of-linking-synchronising-view-models-in-knockout http://www.knockmeout.net/2012/05/using-ko-native-pubsub.html ~ this is a great article describing the ko.subscribable type. http://jsfiddle.net/rniemeyer/z7KgM/ ~ shows how to do the subscription https://github.com/rniemeyer/knockout-postbox will be used to help with the PubSub (described in the blog post above) through the Nuget package. http://jsfiddle.net/rniemeyer/mg3hj/ of knockout-postbox   Implementation: Use syncWith for two-way synchronization. MainVM: self.selectedElement= ko.observable().syncWith (“selectedElement”); ElementListComponentVM example: self.selectedElement= ko.observable().syncWith(“selectedElement”); ko.selectedElement.subscribe(function(){ // do something with the seletion change }); ElementVMTwo: self.selectedElement= ko.observable().syncWith (“selectedElement”); // subscribe example ko.postbox.subscribe(“changeMessage”, function(newValue){ }); // or use subscribeTo this.visible = ko.observable().subscribeTo("section", function(newValue) { // do something here }); · Use ko.toJS to avoid both sides having the same reference (see the blog post). · unsubscribeFrom should be called when the dialog is hidden or closed · Use publishOn to automatically send out messages when an observable changes o ko.observable().publishOn(“section”);

    Read the article

  • Command to determine whether ZooKeeper Server is Leader or Follower

    - by utrecht
    Introduction A ZooKeeper Quorum consisting of three ZooKeeper servers has been created. The zoo.cfg located on all three ZooKeeper servers looks as follows: maxClientCnxns=50 # The number of milliseconds of each tick tickTime=2000 # The number of ticks that the initial # synchronization phase can take initLimit=10 # The number of ticks that can pass between # sending a request and getting an acknowledgement syncLimit=5 # the directory where the snapshot is stored. dataDir=/var/lib/zookeeper # the port at which the clients will connect clientPort=2181 server.1=ip1:2888:3888 server.2=ip2:2888:3888 server.3=ip3:2888:3888 It is clear that one of the three ZooKeeper servers will become the Leader and the others Followers. If the Leader ZooKeeper server has been shutdown the Leader election will start again. The aim is to check if another ZooKeeper server will become the Leader if the Leader server has been shut down. Question Which command needs to be issued to check whether a ZooKeeper server is a Leader or a Follower?

    Read the article

  • Ubuntu NTP issues

    - by Anups
    I am trying to setup the NTP server on Ubuntu machine. Am breaking my head in this particular issue. Getting an error ntpdate[5005]: no server suitable for synchronization found when doing the command ntppdate. Can anyone please help me out in this? /etc/ntp.conf: server 0.ubuntu.pool.ntp.org server 1.ubuntu.pool.ntp.org server 2.ubuntu.pool.ntp.org server 3.ubuntu.pool.ntp.org Also when I gave command netstat -anltp | grep "LISTEN" tcp 0 0 127.0.0.1:53 0.0.0.0:* LISTEN 1816/dnsmasq tcp 0 0 0.0.0.0:22 0.0.0.0:* LISTEN 939/sshd tcp 0 0 127.0.0.1:631 0.0.0.0:* LISTEN 1013/cupsd tcp 0 0 127.0.0.1:39558 0.0.0.0:* LISTEN 5529/rsession tcp 0 0 0.0.0.0:902 0.0.0.0:* LISTEN 1275/vmware-authdla tcp 0 0 127.0.0.1:47304 0.0.0.0:* LISTEN 5822/rsession tcp6 0 0 :::80 :::* LISTEN 1400/apache2 tcp6 0 0 :::22 :::* LISTEN 939/sshd tcp6 0 0 ::1:631 :::* LISTEN 1013/cupsd So what should I do so that it listens on 123? If I get output as PORT STATE SERVICE 123/udp open ntp If I give command nmap -p 123 -sU -P0 192.168.36.198, it means UDP is open right? Then why doesn't it show in the command to to show listening ports?

    Read the article

  • NIS AD password synch for new accounts

    - by user135004
    I have a Win2k3R2 DC with NIS. All is working well but its no longer synching the passwords for new accounts. When creating a new AD user, NIS does its thing and sends its Unix account to the synched linux server. It's doing everything its supposed to do but not the users password to the server (getent passwd returns the ABCD!efgh12345$67890 password for the new account). Thinking that password synchronization is not working, I changed the password of an existing working account and it synchs the new password. If I delete a new or old AD user, it deletes it on the linked linux server as well. All this tells me that NIS is doing its thing (at least with existing accounts) No updates have been installed on the DC. I am not even sure where to start here.

    Read the article

  • Migrating Gmail to Office 365

    - by user218699
    Good Morning, I have been setting up Office 365 for my organization. We are currently using Gmail. I have synced our local Active Directory server w/ Office 365, as well as our domains. The problem I am having has to do with migrating mailboxes from Gmail to Office 365. I have been using this article to walk me through the process: http://technet.microsoft.com/en-us/library/dn568114.aspx The issue arises when I begin to sync the mailboxes. Currently I have been trying to sync my own mailbox as a test. The synchronization process has been going on for about 15 hours (for just one mailbox) with no errors or any information given by Office 365, other than the "Syncing" status on the migration page in the Exchange Admin Center. Is syncing a single mailbox supposed to take this long, or have I missed a step? Thanks!

    Read the article

  • Client-server application design issue

    - by user2547823
    I have a collection of clients on server's side. And there are some objects that need to work with that collection - adding and removing clients, sending message to them, updating connection settings and so on. They should perform these actions simultaneously, so mutex or another synchronization primitive is required. I want to share one instance of collection between these objects, but all of them require access to private fields of collection. I hope that code sample makes it more clear[C++]: class Collection { std::vector< Client* > clients; Mutex mLock; ... } class ClientNotifier { void sendMessage() { mLock.lock(); // loop over clients and send message to each of them } } class ConnectionSettingsUpdater { void changeSettings( const std::string& name ) { mLock.lock(); // if client with this name is inside collection, change its settings } } As you can see, all these classes require direct access to Collection's private fields. Can you give me an advice about how to implement such behaviour correctly, i.e. keeping Collection's interface simple without it knowing about its users?

    Read the article

  • How can I unify my email, calendar and tasks (2 exchange accounts + 1 gmail)

    - by Assaf Stone
    This is my situation: I work as a consultant, and thus work out of multiple computers: my work-laptop a desktop at my primary client my desktop at home an android smartphone an android tablet Likewise, I have multiple accounts: A Microsoft Exchange (2010 AFAIK) account A Microsoft Exchange (2007 AFAIK) account A gmail account The most important thing I need is the ability to have events in one calendar affect the free / busy status of all other accounts (so that if I am busy on Monday 9am with an event from my employer's account, it will show that time as busy in my client's account, and in the gmail account. Second thing I need is a unified view of all of my accounts' info: Appointments, email, tasks, and contacts (in that order of importance). I've already tried outlook synchronization tools such as gSyncit, to sync both exchange accounts with gmail, but this creates a mess when updating appointments (deleted appointments sometimes return, timestamps revert). Is there perhaps some way to at least synchronize the free/busy state in a way that all of my calendar apps / accounts will look there to see if I can be invited? Just solving that would be well worth my while. Thanks, Assaf

    Read the article

  • Establish direct cable connection between Windows 8 PCs in home network

    - by Marie. P.
    I'm running two PCs, a desktop and a laptop with Windows 8 Release Preview ("Build 8400"). They are connected to the same router in infrastructure mode, thereby having wireless internet. Due to often file synchronization between the machines I want to establish a cable connection that allows direct file transfer, without needing to use the wireless. When I plug in the cable (normal, not cross-over), I see in "Control Panel\Network and Internet\Network Connections": "Ethernet - unidentified Network" on both PCs. Transferring a file between both still only uses the WiFi via the Router. I noticed that when turning off the wifi on one PC, I can set up a shared internet connection that will work via Ethernet-cable, but since sometimes only one PC runs, sometimes the other one, I do not want to have the internet of one machine to be dependent on the other one being switched on. I do not have a crossover-cable, but since I did connect the PCs already successfully (just without both being on the internet), I'm sure that this should also work with a normal ethernet cable.

    Read the article

  • Time Synch Architecture in Windows Domain Environment

    - by Param
    I just read the following article -- "In a domain, time synchronization takes place when Windows Time Service turns on during system startup and periodically while the system is running." ( http://technet.microsoft.com/en-us/library/cc779145%28v=ws.10%29.aspx ) From the above article i get to know that the first sync it take as soon as i start my system, but after that in how many minutes or second or in how many periodic interval my windows client ( Window XP, window7 or window server 2008 member ) synch with my Domain controller (PDC emulator )??? Do you have any idea, and how should i verify my synch time interval? My Domain Controller is Window server 2008 R2 Standard

    Read the article

  • multi-thread in mmorpg server

    - by jean
    For MMORPG, there is a tick function to update every object's state in a map. The function was triggered by a timer in fixed interval. So each map's update can be dispatch to different thread. At other side, server handle player incoming package have its own threads also: I/O threads. Generally, the handler of the corresponding incoming package run in I/O threads. So there is a problem: thread synchronization. I have consider two methods: Synchronize with mutex. I/O thread lock a mutex before execute handler function and map thread lock same mutex before it execute map's update. Execute all handler functions in map's thread, I/O thread only queue the incoming handler and let map thread to pop the queue then call handler function. These two have a disadvantage: delay. For method 1, if the map's tick function is running, then all clients' request need to waiting the lock release. For method 2, if map's tick function is running, all clients' request need to waiting for next tick to be handle. Of course, there is another method: add lock to functions that use data which will be accessed both in I/O thread & map thread. But this is hard to maintain and easy to goes incorrect. It needs carefully check all variables whether or not accessed by both two kinds thread. My problem is: is there better way to do this? Notice that I said map is logic concept means no interactions can happen between two map except transport. I/O thread means thread in 3rd part network lib which used to handle client request.

    Read the article

< Previous Page | 22 23 24 25 26 27 28 29 30 31 32 33  | Next Page >