Search Results

Search found 28744 results on 1150 pages for 'event wait handle'.

Page 350/1150 | < Previous Page | 346 347 348 349 350 351 352 353 354 355 356 357  | Next Page >

  • Server to server replication and CPU and 32k\ corrupt doc

    - by nick wall
    Summary: if database contains a doc with 32K issue or corrupt, on server to server replication it causes marked increase in CPU in nserver.exe task, which effectively causes our server(s) to slow right down. We have a 5 server cluster (1 "hub" and 4 HTTP servers accessed via reverse proxy and SSO for load balancing and redundancy). All are physically located next to each other on network, they don't have dedicated network\ ports for cluster or replication. I realise IBM recommendation is dedicated port for cluster. Cluster queues are in tolerance and under heavy application user load, i.e. the maximum number of documents are being created, edited, deleted, the replication times between servers are negligible. Normally, all is well. Of the servers in the cluster, 1 is considered the "hub", and imitates a PUSH-PULL replication with it's cluster mates every 60mins, so that the replication load is taken by the hub and not cluster mates. The problem we have: every now and then we get a slow replication time from the hub to a cluster mate, sometimes up to 30mins. This maxes out the nserver.exe task on the "cluster mate" which causes it to respond to http requests very slowly. In the past, we have found that if a corrupt document is in the DB, it can have this affect, but on those occasions, the server log will show the corrupt doc noteId, we run fixup, all well. But we are not now seeing any record of corrupt docs. What we have noticed is if a doc with the 32K issue is present, the same thing can happen. Our only solution in that case is to run a : fixup mydb.nsf -V, which shows it is purging a 32K doc. Luckily we run a reverse proxy, so we can shut HTTP servers down without users noticing, but users do notice when a server has the problem! Has anyone else seen this occur? I have set up DDM event handlers for many of the replication events. I have set the replication time out limit to 5 mins (the max we usually see under full user load is 0.1min), to prevent it rep'ing for 30mins as before. This ia a temporary work around. Does anyone know of a DDM event to trap the 32K issue? we could at least then send alert. Regarding 32K issue: this prob needs another thread, but we are finding this relatively hard to find the source of the issue as the 32K event is fairly rare. Our app is fairly complex, interacting with various other external web services, with 2 way data transfer. But if we do encounter a 32K doc, we can't look at field properties, so we can't work out which field has issue which would give us a clue as to which process is culprit. As above, we run a fixup -V. Any help\ comments on this would be gratefully received.

    Read the article

  • Thuzi, Outback and Azure: Tapping the Power of Facebook and the Cloud

    So you've decided to leverage social media with an application you hope will go viral. Are you prepared to log signups at a rate of 20 per minute, 1,200 per hour and 670,000 in five weeks? Can you handle 50,000 signups in one day? Here's how the Outback Steakhouse restaurant chain, in cahoots with Florida ISV Thuzi and Windows Azure, turned a free appetizer offer into a Bloomin' success--and how others are following suit.

    Read the article

  • How to make code-review feel less like a way to *shift* the responsibility? [duplicate]

    - by One Two Three
    This question already has an answer here: How do you make people accept code review? 33 answers Sometimes it seems to me that people ask for code-reviews just so they would be able to say "Xyz reviewed my code!"(1) when something broke. Question, is that ever the case? (Or is it just my imagination) If it is, how do I handle this? (1): What s/he really meant: It's Xyz's fault or something along those lines.

    Read the article

  • Rolling With the Punches

    - by D'Arcy Lussier
    So I’ve been tweeting the last little while “Rolling with the punches” and I’ve had some people ask me what that meant. Whether you’re running a conference (like I am this week), or a project, or a birthday party for a 2 year old, you need to be ready to handle those things that are unexpected. Risk mitigation can only go so far and its at those times that you need to become resourceful. So let me tell you what the last few days have been like. Today is the first day of Prairie Dev Con Winnipeg, a conference that I run. On Friday I was informed that my keynote speaker had lost his voice, one of my speakers had a family emergency and had to back out, and I got a warning from another that he was travelling over the weekend and if there was a storm or something he may not be able to get back by Monday for his talk. A storm didn’t happen, but their car did break down and he was delayed. Finally, Saturday night I took my printing order to Staples. It was at 5 and they closed at 6, and I had a bunch of surveys to be printed and cut. The girl working said that she’d have it ready by the next day (Sunday). Her intent was to come in the next morning and finish the job. Unfortunately, she had to be hospitalized that night and never made it into work…and never informed anyone of the remaining work. They found out at 3pm when I came to pick it up and there was no way they’d be able to cut everything in time. So how did we roll with these punches? - Miguel, my keynote speaker, was a trooper and was able to do the keynote but asked that his session get moved from Monday to Tuesday. This is why I wait until the last day before printing out schedules, they can change up to the event and even later. - I was able to move some sessions around to accommodate my stranded speaker and fill the empty slot from the speaker that couldn’t make it. - Staples was able to get me half the cut surveys so I took those and my wife will pick up the rest today. I altered how we’d collect session surveys, and actually I think it’ll work better. So all of this is to say, plan but also plan for what you can’t plan for – there will be things that happen that blindside you, that you’re not sure how to handle or solve. Stop, take a deep breath, and don’t feel that you need to limit yourself to the boundaries that you initially set for yourself. Roll with the punch and learn from it so that you can avoid the blow next time. Now, back to the conference! D

    Read the article

  • Do you I think I should integrate something like AWS or other cloud service from the initial phases of my project?

    - by Kareem Ergawy
    Do you I think I should integrate something like AWS or other cloud service from the initial phases of my project or I should be working on the front and back end components regularly and integrate AWS later? I am starting to work on a mobile service. From day one, I wish to make sure that my service will be scalable and able to handle large loads of requests. This is my first time in architecting a large scale system from the beginning so I can't decide what is best.

    Read the article

  • Dropping multiple objects using an array in Actionscript?

    - by Eratosthenes
    I'm trying to get these fireBalls to drop more often, I'm not sure if I'm using Math.random correctly. Also, for some reason I'm getting a null reference because I think the fireBalls array waits for one to leave the stage before dropping another one? This is the relevant code: var sun:Sun=new Sun var fireBalls:Array=new Array() var left:Boolean; function onEnterFrame(event:Event){ if (left) { sun.x = sun.x - 15; }else{ sun.x = sun.x + 15; } if (fireBalls.length>0&&fireBalls[0].y>stage.stageHeight){ // Fireballs exit stage removeChild(fireBalls[0]); fireBalls.shift(); } for (var j:int=0; j<fireBalls.length; j++){ fireBalls[j].y=fireBalls[j].y+15; if (fireBalls[j].y>stage.stageHeight-fireBall.width/2){ } } if (Math.random()<.2){ // Fireballs shooting from Sun var fireBall:FireBall=new FireBall; fireBall.x=sun.x; addChild(fireBall); fireBalls.push(fireBall); } }

    Read the article

  • Best approach for tracking dependent state

    - by Pace
    Let's pretend I work on a project tracking application. The application is a database backed, server hosted, web application. In this application there are Projects which have many Activities which have many Tasks. A Task has two date fields an originalDueDate and a projectedDueDate. In addition, there are dynamic fields on the Activities and the Projects which indicate whether the Activity or Project is behind schedule based on the projected due dates of the child tasks and various other variables such as remaining buffer time, etc. There are a number of things that can cause the projectedDueDate to change. For example, an employee working on the project may (via a server request) enter in a shipping delay. Alternatively, a site may (via a server request) enter in an unexpected closure. When any of these things occur I need to not only update the projectedDueDate of the Task but also trigger the corresponding Project and Activity to update as well. What is the best way to do this? I've thought of the observer pattern but I don't keep a single copy of all these objects in memory. When a request comes in, I query the Task in from the database, at that point there is no associated Activity in memory that would be a listener. I could remove the ability to query for Tasks and force the application to query first by Project, then by Activity (in context of Project), then by task (in context of Activity) adding the observer relationships at each step but I'm not sure if that is the best way. I could setup a database event listening system so when a Task modified event is dispatched I have a handler which queries for the Activity at that point. I could simply setup a two-way relationship between Task and Activity so that the Task knows about the parent Activity and when the Task updates his state the Task grabs his parent and updates state. Right now I'm stuck considering all the options and am wondering if any single approach (doesn't have to be a listed approach) is jumping out at others as the best approach.

    Read the article

  • What are possible reasons why a calendar entry in OWA is at a different time than in Outlook?

    - by Ken Pespisa
    We have two Exchange 2003 servers, our primary server and a front-end server that hosts Outlook Web Access (OWA). When I open my boss' calendar via Outlook 2007 (from my Outlook client as well as hers) I see the event scheduled for 10:30 am. When I open her calendar via Outlook Web Access, the same event is scheduled for 4:30 am. I don't understand Exchange well-enough to imagine how this is possible. If you have any ideas why this could be happening, I greatly appreciate it. I'd also very much appreciate any insight you have to how this could be possible. There must be some cached data on the front-end server that causes the calendar entry to appear at a different time, I suppose. Any insight into how Exchange manages that cache and where I could look for an issue would be very helpful. Thank you!

    Read the article

  • How to leverage the internal HTTP endpoint available on Azure web roles?

    - by adelsors
    Imagine you have a Web application using an in-memory collection that changes occasionally, loading it from storage on the Application_Start global.asax event and updating it whenever it changes. If you want to deploy this application on Azure you need to keep in mind that more than one instance of the application can be running at any time and therefore you need to provide some mechanism to keep all instances informed with the latest changes. Because that the communication through internal endpoints between Azure role instances is at no cost, a good solution can be maintaining the information on Azure Storage Tables, reading its contents on the Application_Start event and populating its changes to all instances using the internal HTTP port available on Azure Web Roles. You need to follow these steps to leverage the internal HTTP endpoint available on Azure web roles: 1.   Define an internal HTTP endpoint in the Web Role properties, for example InternalHttpEndpoint   2.   Add a new WCF service to the Web Role, for example NotificationServices.svc 3.   Add a method on the new service to receive notifications from other role instances. 4.   Declare a class that inherits from System.ServiceModel.Activation.ServiceHostFactory and override the method CreateServiceHost to host the internal endpoint.   Note that you can use SecurityMode.None because the internal endpoint is private to the instances of the service, this is provided by the platform. 5.   Edit the markup of the service right clicking the svc file and selecting "View markup" to add the new factory as the factory to be used to create the service    6. Now you can notify changes to other instances using this code:

    Read the article

  • How to sync (or at least view) public / team / shared calendar to Blackberry using BES?

    - by 3rdparty
    Trying to allow 3 people to view and ideally sync (create/edit) common (team) calendar events via Blackberry and hosted Exchange 2007 BES. My understanding is that BES does not support anything other than a users primary calendar to be synced wirelessly. From what I've researched the only supported workflow is for user to create event in public calendar on Outlook and then invites team members individually as optional attendees so event displays in their calendar (and on their Blackberry). I've seen some 3rd party utilities that claim to support syncing of public folders/calendars: Add2Outlook: http://www.diditbetter.com/add2outlook.aspx WICKSoft: http://www.wicksoft.com/contacts_calendars.htm (needs to be installed on local Exchange server) I've also been told I can sync public/other calendars using Desktop Manager, but I need to avoid any tethered sync with this environment. Am I missing an easier workflow here? There must be tens of thousands of BES users that require the ability to/view share a public, shared or team calendar on their Blackberry. How can I solve this?

    Read the article

  • How to configure a longer version Number in artifactory

    - by claudine
    The version-numbers for our jars have to be longer them x.x.x. We would rather need x.x.x.x to integrate some old-fashioned self-made mechanism. This is, because we tag our software with x.x.x and as soon as we have a delivery to a customer one specific jar has to be build exactly at this point of time to fit to another backend, which communicates with our program. For that reason this one jar has the version 2.3.4.1, when generated and in next delivery of the same Version it is build and named 2.3.4.2. Now artifactory cannot handle this an doesn't save more than x.x.x.2 in some cases. So we thought of maybe edit the regular expression in the maven repository layout (see attached Screenshot) Because testing the path in the field below shows, that it cannot handle the version number. Of course for the rest of our jars still x.x.x has to work.. For Example here is the maven-metadata.xml <?xml version="1.0" encoding="UTF-8"?> <metadata> <groupId>com.firm</groupId> <artifactId>someid</artifactId> <version>1.5.1</version> <versioning> <latest>1.5.1</latest> <release>1.5.1</release> <versions> <version>1.4.62</version> </versions> <lastUpdated>20120926073942</lastUpdated> </versioning> </metadata> The folder structure looks like: someid 1.4.62 1.4.62.1 1.4.62.2 1.4.62.3 If we deploy an new artifact version (1.4.62.1), the maven-metadata.xml contains the 1.4.62.1 version. But the artifactory overrides the version number (1.4.62.x) to (1.4.62) after an unspecified time. It seems that the artifactory only support major, minor and revision numbers, and deletes the buildnumber. Now we looking for a solution do disable this behavior. We use the JFrog Artifactory version 2.5.0 (rev. 13086). Any ideas, maybe? Thanks in andvance

    Read the article

  • Issue with corrupt 1tb volume: can we rescue SQL databases?

    - by Barrie Ashmore
    We have an instance where some how a 1tb volume has become corrupted. There are Event ID 55 errors in the system event viewer. When running chkdsk, it gets to 47% verifying indexes and returns to the command prompt. If we are unable to rescue the data on the drive then we have a full backup of the databases from some time ago. The logfiles of which are on a different volume which is intact. Would it be viable to restore the databases and somehow replay the log files? I have seen articles about replaying logfiles from a logfile backup (.trn), however we have the actual logfiles (.ldf) Any help would be appreciated.

    Read the article

  • best way to import 500MB csv file into mysql database?

    - by mars
    I have a 500MB csv file that needs to be imported into my mysql database. I've made a php file where i can upload the csv file and it analyses the fields n stuff and does the actual importing. but it can only handle small fiels max 5mb. so that's a 100 files and actually pretty slow(uploading) is there another way? I have to repeat this process every month because the data in the file changes every month it's about 12 000 000 lines :D

    Read the article

  • Survey of MySQL Storage Engines

    MySQL has an interesting architecture that sets it apart from some other enterprise database systems. It allows you to plug in different modules to handle storage. What that means to end users is that it is quite flexible, offering an interesting array of different storage engines with different features, strengths, and tradeoffs.

    Read the article

  • Survey of MySQL Storage Engines

    MySQL has an interesting architecture that sets it apart from some other enterprise database systems. It allows you to plug in different modules to handle storage. What that means to end users is that it is quite flexible, offering an interesting array of different storage engines with different features, strengths, and tradeoffs.

    Read the article

  • Ubuntu 12.04 image size 732MB, will it fit a standard CD?

    - by memius
    I have an old computer that can't handle a boot stick install, so i have to create an actual, old fashioned boot CD. However, the image size for Ubuntu 12.04 is 732MB, which is too large for a CD, which can hold only 700MB. The maintainers of Ubuntu 12.04 say the image size will never go over 700MB, and indeed, the download size seemed to be 689MB. Brasero says it won't burn the CD because the file is too big, what's going on?

    Read the article

  • Interesting fact #123423

    - by Tim Dexter
    Question from a customer on an internal mailing list this, succintly answered by RTF Template God, Hok-Min Q: Whats the upper limit for a sum calculation in terms of the largest number BIP can handle? A: Internally, XSL-T processor uses double precession.  Therefore the upper limit and precision will be same as double (IEEE 754 double-precision binary floating-point format, binary64). Approximately 16 significant decimal digits, max is 1.7976931348623157 x 10308 . So, now you know :)

    Read the article

< Previous Page | 346 347 348 349 350 351 352 353 354 355 356 357  | Next Page >