Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 527/1407 | < Previous Page | 523 524 525 526 527 528 529 530 531 532 533 534  | Next Page >

  • Python: unix socket -> broken pipe

    - by Heinrich Schmetterling
    I'm trying to get Python socket working as an alternative to calling the command line socat. This socat command works fine: echo 'cmd' | sudo socat stdio <path-to-socket> but when I run this python code, I get an error: >>> import socket >>> s = socket.socket(socket.AF_UNIX, socket.SOCK_STREAM) >>> s.connect(<path-to-socket>) >>> s.send('cmd') Traceback (most recent call last): File "<stdin>", line 1, in <module> socket.error: (32, 'Broken pipe') Any ideas what the issue is? Thanks.

    Read the article

  • IIS7 windows server 2008R2 how to set Cognos8 application under default website as startpage?

    - by Jeroen Bossenbroek
    Hi All, I really would like to know how i can set my application 'Cognos8' as startpage when just typing the host name of the server. When i now type my hostname 'http://myhost' i get the iistart.htm page instead i would like to be able to get 'http://myhost/Cognos8'. tried http redirect to redirect myhost to myhost/cognos8 which ends in a loop. i tried to set the physical path of default web site to the physical path of my Cognos8 application but also this does not seem to work. i know this should not to hard. Can someone please point i in the right direction? Thanks, Jeroen

    Read the article

  • PHP File Exists Always False

    - by Joe
    I have a case where file_exists() is always returning false. My latest attempt was to just test to see if it would return true for $_SERVER["SCRIPT_FILENAME"] and then return the value of the path if it couldn't find the file which it does. The path while not necessarily relevant to solving the problem is: /Users/joe/Workspace/720/app/webroot/index.php I have obviously verified that the file is there, and am not even sure how it couldn't be there since php is serving it up. I should mention this is on an install of OS X Snow Leopard running PHP 5.3.0. Any ideas would be fantastic. CODE SAMPLE: if (!file_exists($_SERVER["SCRIPT_FILENAME"])) $errors[] = 'Cant find:'. $_SERVER["SCRIPT_FILENAME"];

    Read the article

  • HTTP Error 500.19 - Internal Server Error

    - by peacmaker
    i am trying to add an website to iis 7 put when i try to run the website its gives the following error: HTTP Error 500.19 - Internal Server Error Module IIS Web Core Notification BeginRequest Handler Not yet determined Error Code 0x80070021 Config Error This configuration section cannot be used at this path. This happens when the section is locked at a parent level. Locking is either by default (overrideModeDefault="Deny"), or set explicitly by a location tag with overrideMode="Deny" or the legacy allowOverride="false". Config File \\?\E:\Code\web\xSP\xSP Protocol\web.config Requested URL http://localhost:80/ Physical Path E:\Code\web\xSP\xSP Protocol Logon Method Not yet determined Logon User Not yet determined Config Source 136: </modules> 137: <handlers> 138: <remove name="WebServiceHandlerFactory-Integrated"/> please any help ?

    Read the article

  • Five Ways Enterprise 2.0 Can Transform Your Business - Q&A from the Webcast

    - by [email protected]
    A few weeks ago, Vince Casarez and I presented with KMWorld on the Five Ways Enterprise 2.0 Can Transform Your Business. It was an enjoyable, interactive webcast in which Vince and I discussed the ways Enterprise 2.0 can transform your business and more importantly, highlighted key customer examples of how to do so. If you missed the webcast, you can catch a replay here. We had a lot of audience participation in some of the polls we conducted and in the Q&A session. We weren't able to address all of the questions during the broadcast, so we attempted to answer them here: Q: Which area within your firm focuses on Web 2.0? Meaning, do you find new departments developing just to manage the web 2.0 (Twitter, Facebook, etc.) user experience or are you structuring current departments? A: There are three distinct efforts within Oracle. The first is around delivery of these Web 2.0 services for enterprise deployments. This is the focus of the WebCenter team. The second effort is injecting these Web 2.0 services into use cases that drive the different enterprise applications. This effort is focused on how to manage these external services and bring them into a cohesive flow for marketing programs, customer care, and purchasing. The third effort is how we consume these services internally to enhance Oracle's business delivery. It leverages the technologies and use cases of the first two but also pushes the envelope with regards to future directions of these other two areas. Q: In a business, Web 2.0 is mostly like action logs. How can we leverage the official process practice versus the logs of a recent action? Example: a system configuration modified last night on a call out versus the official practice that everybody would use in the morning.A: The key thing to remember is that most Web 2.0 actions / activity streams today are based on collaboration and communication type actions. At least with public social sites like Facebook and Twitter. What we're delivering as part of the WebCenter Suite are not just these types of activities but also enterprise application activities. These enterprise application activities come from different application modules: purchasing, HR, order entry, sales opportunity, etc. The actions within these systems are normally tied to a business object or process: purchase order/customer, employee or department, customer and supplier, customer and product, respectively. Therefore, the activities or "logs" as you name them are able to be "typed" so that as a viewer, you can filter or decide to see only certain types of information. In your example, you could have a view that only showed you recent "configuration" changes and this could be right next to a view that showed off the items to be watched every morning. Q: It's great to hear about customers using the software but is there any plan for future webinars to show what the products/installs look like? That would be very helpful.A: We don't have a webinar planned to show off the install process. However, we have a viewlet that's posted on Oracle Technology Network. You can see it here:http://www.oracle.com/technetwork/testcontent/wcs-install-098014.htmlAnd we've got excellent documentation that walks you through the steps here:http://download.oracle.com/docs/cd/E14571_01/install.1111/e12001/install.htmAnd there's a whole set of demos and examples of what WebCenter can do at this URL:http://www.oracle.com/technetwork/middleware/webcenter/release11-demos-097468.html Q: How do you anticipate managing metadata across the enterprise to make content findable?A: We need to first make sure we are all talking about the same thing when we use a word like "metadata". Here's why...  For a developer, metadata means information that describes key elements of the portal or application and what the portal or application can do. For content systems, metadata means key terms that provide a taxonomy or folksonomy about the information that is being indexed, ordered, and managed. For business intelligence systems, metadata means key terms that provide labels to groups of data that most non-mathematicians need to understand. And for SOA, metadata means labels for parts of the processes that business owners should understand that connect development terminology. There are also additional requirements for metadata to be available to the team building these new solutions as well as requirements to make this metadata available to the running system. These requirements are often separated by "design time" and "run time" respectively. So clearly, a general goal of managing metadata across the enterprise is very challenging. We've invested a huge amount of resources around Oracle Metadata Services (MDS) to be able to provide a more generic system for all of these elements. No other vendor has anything like this technology foundation in their products. This provides a huge benefit to our customers as they will now be able to find content, processes, people, and information from a common set of search interfaces with consistent enterprise wide results. Q: Can you give your definition of terms as to document and content, please?A: Content applies to a broad category of information from Word documents, presentations and reports through attachments to invoices and/or purchase orders. Content is essentially any type of digital asset including images, video, and voice. A document is just one type of content. Q: Do you have special integration tools to realize an interaction between UCM and WebCenter Spaces/Services?A: Yes, we've dedicated a whole team of engineers to exploit the key features of Oracle UCM within WebCenter.  While ensuring that WebCenter can connect to other non-Oracle systems, we've made sure that with the combined set of Oracle technology, no other solution can match the combined power and integration.  This is part of the Oracle Fusion Middleware strategy which is to provide best in class capabilities for Content and Portals.  When combined together, the synergy between the two products enables users to quickly add capabilities when they are needed.  For example, simple document sharing is part of the combined product offering, but if legal discovery or archiving is required, Oracle UCM product includes these capabilities that can be quickly added.  There's no need to move content around or add another system to support this, it's just a feature that gets turned on within Oracle UCM. Q: All customers have some interaction with their applications and have many older versions, how do you see some of these new Enterprise 2.0 capabilities adding value to existing enterprise application deployments?A: Just as Service Oriented Architectures allowed for connecting the processes of different applications systems to work together, there's a need for a similar approach with regards to these enterprise 2.0 capabilities. Oracle WebCenter is built on a core architecture that allows for SOA of these Enterprise 2.0 services so that one set of scalable services can be used and integrated directly into any type of application. In this way, users can get immediate value out of the Enterprise 2.0 capabilities without having to wait for the next major release or upgrade. These centrally managed WebCenter services expose a set of standard interfaces that make it extremely easy to add them into existing applications no matter what technology the application has been implemented. Q: We've heard about Oracle Next Generation applications called "Fusion Applications", can you tell me how all this works together?A: Oracle WebCenter powers the core collaboration and social computing services found within Fusion Applications. It is the core user experience technology for how all the application screens have been implemented. And the core concept of task flows allows for all the Fusion Applications modules to be adaptable and composable by business users and IT without needing to be a professional developer. Oracle WebCenter is at the heart of the new Fusion Applications. In addition, the same patterns and technologies are now being added to the existing applications including JD Edwards, Siebel, Peoplesoft, and eBusiness Suite. The core technology enables all these customers to have a much smoother upgrade path to Fusion Applications. They get immediate benefits of injecting new user interactions into their existing applications without having to completely move to Fusion Applications. And then when the time comes, their users will already be well versed in how the new capabilities work. Q: Does any of this work with non Oracle software? Other databases? Other application servers? etc.A: We have made sure that Oracle WebCenter delivers the broadest set of development choices so that no matter what technology you developers are using, WebCenter capabilities can be quickly and easily added to the site or application. In addition, we have certified Oracle WebCenter to run against non-Oracle databases like DB2 and SQLServer. We have stated plans for certification against MySQL as well. Later in CY 2011, Oracle will provide certification on non-Oracle application servers such as WebSphere and JBoss. Q: How do we balance User and IT requirements in regards to Enterprise 2.0 technologies?A: Wrong decisions are often made because employee knowledge is not tapped efficiently and opportunities to innovate are often missed because the right people do not work together. Collaboration amongst workers in the right business context is critical for success. While standalone Enterprise 2.0 technologies can improve collaboration for collaboration's sake, using social collaboration tools in the context of business applications and processes will improve business responsiveness and lead companies to a more competitive position. As these systems become more mission critical it is essential that they maintain the highest level of performance and availability while scaling to support larger communities. Q: What are the ways in which Enterprise 2.0 can improve business responsiveness?A: With a wide range of Enterprise 2.0 tools in the marketplace, CIOs need to deploy solutions that will meet the requirements from users as well as address the requirements from IT. Workers want a next-generation user experience that is personalized and aggregates their daily tools and tasks, while IT needs to ensure the solution is secure, scalable, flexible, reliable and easily integrated with existing systems. An open and integrated approach to deploying portals, content management, and collaboration can enhance your business by addressing both the needs of knowledge workers for better information and the IT mandate to conserve resources by simplifying, consolidating and centralizing infrastructure and administration.  

    Read the article

  • PS using Get-WinEvent with FilterXPath and datetime variables?

    - by Jordan W.
    I'm grabbing a handful of events from an event log in chronological order don't want to pipe to Where want to use get-winevent After I get the Event1, I need to get the 1st instance of another event that occurs some unknown amount of time after Event1. then grab Event3 that occurs sometime after Event2 etc. Basically starting with: $filterXML = @' <QueryList> <Query Id="0" Path="System"> <Select Path="System">*[System[Provider[@Name='Microsoft-Windows-Kernel-General'] and (Level=4 or Level=0) and (EventID=12)]]</Select> </Query> </QueryList> '@ $event1=(Get-WinEvent -ComputerName $PCname -MaxEvents 1 -FilterXml $filterXML).timecreated Give me the datetime of Event1. Then I want to do something like: Get-WinEvent -LogName "System" -MaxEvents 1 -FilterXPath "*[EventData[Data = 'Windows Management Instrumentation' and TimeCreated -gt $event1]]" Obviously the timecreated part bolded there doesn't work but I hope you get what I'm trying to do. any help?

    Read the article

  • vb.net .aspxauth

    - by Morgan
    I am working with a large site trying to implement web parts for particular users in a particular subdirectory but I can't get the .ASPXAUTH cookie to be recognized. I've read dozens of tutorials and MS class library pages that tell me how it should work to no avail. I am brand new to Web parts, so I'm sorry if I'm unclear. The idea is that logged in users can travel the site, but then when they go to their dashboard, they are programmatically authenticated using Membership and FormsAuthentication to pull up their Personalization. When I step through the code, I can see the cookie being set, and that it exists on the following page, but Membership.GetUser() and User.Identity are both empty. I know the user exists because I created it programmatically using Membership.CreateUser() and I can see it when I do Membership.GetAllUsers() and it's online when i use Membership.GetUser(username) but the Personalization doesn't work. Right now, I'm just trying to get the proof of concept going. I've tried creating the ticket and cookie myself, and also using SetAuthCookie() (code follows). I really just need a clue as to what to look for. Here's the "login" page... If Membership.ValidateUser(testusername, testpassword) Then -- Works FormsAuthentication.SetAuthCookie(testusername, true) Response.Redirect("webpartsdemo1.aspx", False) End If And the next page (webpartsdemo1.aspx) Dim cookey As String = ".ASPXAUTH" lblContent.Text &= "<br><br>" & Request.Cookies(cookey).Name & " Details" lblContent.Text &= "<br>path = " & Request.Cookies(cookey).Path lblContent.Text &= "<br>domain = " & Request.Cookies(cookey).Domain lblContent.Text &= "<br>expires = " & Request.Cookies(cookey).Expires lblContent.Text &= "<br>Secure only? " & Request.Cookies(cookey).Secure lblContent.Text &= "<br>HTTP only? = " & Request.Cookies(cookey).HttpOnly lblContent.Text &= "<br>Has subkeys? " & Request.Cookies(cookey).HasKeys lblContent.Text &= "<br/><br/>request authenticated? " & Request.IsAuthenticated.ToString lblContent.Text &= " Getting user<br/>Current User: " Dim muGidget As MembershipUser If Request.IsAuthenticated Then muGidget = Membership.GetUser lblContent.Text &= Membership.GetUser().UserName Else lblContent.Text &= "none found" End If Output: .ASPXAUTH Details path = / domain = expires = 12:00:00 AM Secure only? False HTTP only? = False Has subkeys? False request authenticated? False Getting user Current User: none found Sorry to go on so long. Thanks for any help you can provide.

    Read the article

  • [WPF]ItemsControl not completely loaded @Loaded event

    - by Kaare
    Hi everyone I have a propably simple problem, that i just can't seem to figure out: I've made an ItemsControl which has its datacontext set and shows the data as pairs of Checkboxes and TextBlocs: <ItemsControl Name="listTaskTypes" Grid.Row="1" Grid.Column="2" Grid.RowSpan="2" ItemsSource="{Binding}" Margin="10,0,0,0" VerticalAlignment="Top" Loaded="listTaskTypes_Loaded"> <ItemsControl.ItemTemplate> <DataTemplate> <StackPanel Orientation="Horizontal"> <CheckBox Name="checkBoxTypeId" Tag="{Binding Path=TaskTypeID}"/> <TextBlock FontSize="11pt" FontFamily="Helvetica" Text="{Binding Path=Text}" /> </StackPanel> </DataTemplate> </ItemsControl.ItemTemplate> </ItemsControl> My problem is that in the Loaded event of the ItemsControl, the checkboxes does not exist yet. How can i get an event when the ItemsControl is completely loaded or is this not possible?

    Read the article

  • Best practices for managing limited client licenses/login

    - by MicSim
    I have a multi-user software solution (containing different applications, i.e. EXEs) that should allow only a limited number of concurrent users. It's designed to run in an intranet. I dont have a really good, satisfactory solution to the problem of counting the client licenses yet. The key requirements are: Multiple instances (starts) of the same application (= process) should count as only one client licence Starting different applications of the software solution should also count as only one (the same) client licence Application crash should not lead to orphaned used licences The above should work also for Terminal Server environments (all clients same IP, but different install folders) I'm looking for estabilished patterns, solutions, tips for managing used client licenses. Specific hints for the above sitaution are also welcome.

    Read the article

  • django return file over HttpResonse - file is not served correctly

    - by Tom Tom
    I want to return some files in a HttpResponse and I'm using the following function. The file that is returned always has a filesize of 1kb and I do not know why. I can open the file, but it seems that it is not served correctly. Thus I wanted to know how one can return files with django/python over a HttpResponse. @login_required def serve_upload_files(request, file_url): import os.path import mimetypes mimetypes.init() try: file_path = settings.UPLOAD_LOCATION + '/' + file_url fsock = open(file_path,"r") #fsock = open(file_path,"r").read() file_name = os.path.basename(file_path) mime_type_guess = mimetypes.guess_type(file_name) try: if mime_type_guess is not None: response = HttpResponse(mimetype=mime_type_guess[0]) response['Content-Disposition'] = 'attachment; filename=' + file_name response.write(fsock) finally: fsock.close() except IOError: response = HttpResponseNotFound() return response

    Read the article

  • Java: why is declaration not sufficient in interface?

    - by HH
    Big class contains Format-interfcase and Format-class. The Format-class contains the methods and the interface has the values of the fields. I could have the fields in the class Format but the goal is with Interface. So do I just create dummy-vars to get the errors away, design issue or something ELSE? KEY: Declaration VS Initialisation Explain by the terms, why you have to init in interface. What is the logic behind it? To which kind of problems it leads the use of interface? Sample Code having the init-interface-problem import java.util.*; import java.io.*; public class FormatBig { private static class Format implements Format { private static long getSize(File f){return f.length();} private static long getTime(File f){return f.lastModified();} private static boolean isFile(File f){if(f.isFile()){return true;}} private static boolean isBinary(File f){return Match.isBinary(f);} private static char getType(File f){return Match.getTypes(f);} private static String getPath(File f){return getNoErrPath(f);} //Java API: isHidden, --- SYSTEM DEPENDED: toURI, toURL Format(File f) { // PUZZLE 0: would Stack<Object> be easier? size=getSize(f); time=getTime(f); isfile=isFile(f); isBinary=isBinary(f); type=getType(f); path=getPath(f); //PUZZLE 1: how can simplify the assignment? values.push(size); values.push(time); values.push(isfile); values.push(isBinary); values.push(type); values.push(path); } } public static String getNoErrPath(File f) { try{return f.getCanonicalPath(); }catch(Exception e){e.printStackTrace();} } public static final interface Format { //ERR: IT REQUIRES "=" public long size; public long time; public boolean isFile=true; //ERROR goes away if I initialise wit DUMMY public boolean isBinary; public char type; public String path; Stack<Object> values=new Stack<Object>(); } public static void main(String[] args) { Format fm=new Format(new File(".")); for(Object o:values){System.out.println(o);} } }

    Read the article

  • unable to connect to database on a networked drive

    - by thegunner
    Hi, I'm trying to connect to an access database from a php script using ODBC. When I put the db on my local c: drive create a system DSN i can connect no problem, but when it's on the networked drive I get the error: Warning: odbc_connect() [function.odbc-connect]: SQL error: [Microsoft][ODBC Microsoft Access Driver] '(unknown)' is not a valid path. Make sure that the path name is spelled correctly and that you are connected to the server on which the file resides., SQL state S1009 in SQLConnect in C:\wamp\www\suppliers\furniture.php on line 3 Ok so I'm guessing it's permissions somewhere anyone know specifically what/where? Thanks,

    Read the article

  • Problems running Java SWT application. Is this something to do with 64 vs 32-bit libraries?

    - by ?????
    I'm getting started with SWT Exception in thread "main" java.lang.UnsatisfiedLinkError: no swt-cocoa-3557 or swt-cocoa in swt.library.path, java.library.path or the jar file at org.eclipse.swt.internal.Library.loadLibrary(Unknown Source) at org.eclipse.swt.internal.Library.loadLibrary(Unknown Source) at org.eclipse.swt.internal.C.<clinit>(Unknown Source) at org.eclipse.swt.internal.cocoa.NSThread.isMainThread(Unknown Source) at org.eclipse.swt.graphics.Device.<init>(Unknown Source) at org.eclipse.swt.widgets.Display.<init>(Unknown Source) at org.eclipse.swt.widgets.Display.<init>(Unknown Source) at org.eclipse.swt.widgets.Display.getDefault(Unknown Source) at com.astrobetty.getotagdesktop.MainUIWindow.main(MainUIWindow.java:110) I've carefully followed the directions here http://www.eclipse.org/swt/eclipse.php I can see libswt-awt-cocoa-3557.jnilib, libswt-cocoa-3557.jnilib, libswt-pi-cocoa-3557.jnilib clearly listed under "Referenced Libraries" in my Eclipse package explorer. Presumably, that should make them available on the classpath when I select the java module that contains "main" and do a "run as" application. What's the problem? I suspect it may be related to 64-bit vs 32-bit VMs....

    Read the article

  • how to show attached files on a TMS WebGrid ???

    - by ahmed
    hi, i have a TMS WebGrid , I would like to attach some files ad show them on a Tms WebGrid. How can I do that in vb.net ? For now I am simply attaching like this on a attach file button ?? If Len(FileUpload1.PostedFile.FileName) > 5 Then length = FileUpload1.PostedFile.InputStream.Length() My_Img_Path = "Attachments/" k_upload_dir = "~/Attachments/" virtualPath = k_upload_dir + my_img_srno.ToString + Path.GetFileName(FileUpload1.PostedFile.FileName) My_Img_Path = My_Img_Path + my_img_srno.ToString + Path.GetFileName(FileUpload1.PostedFile.FileName) phyiscalPath = Server.MapPath(virtualPath) FileUpload1.PostedFile.SaveAs(phyiscalPath) my_html_code = "" lbl_AttahcmnetStatus.Text = "Sucessfully file attached..." end if

    Read the article

  • WPF Validation in an ElementHost control

    - by Jon Mitchell
    I've got a WinForms form that contains an ElementHost control (which contains a WPF UserControl) and a Save button. In the WPF UserControl I've got a text box with some validation on it. Something like this... <TextBox Name="txtSomething" ToolTip="{Binding ElementName=txtSomething, Path=(Validation.Errors).[0].ErrorContent}"> <Binding NotifyOnValidationError="True" Path="Something"> <Binding.ValidationRules> <commonWPF:DecimalRangeRule Max="1" Min="0" /> </Binding.ValidationRules> </Binding> </TextBox> This all works fine. What I want to do however, is disable the Save button while the form is in an invalid state. Any help would be greatly appreciated.

    Read the article

  • route finding between two designation on maps in android?

    - by androidbase Praveen
    i want to just find a shortest path between the location on map. we have to pass the location's geopoint then click the button to get direction. it will show the shortest path like a blue line. how to do this? i search about this. many of them import a package com.google.googlenav.*;. where i have to get this? Any Idea???? Edit:got downloaded the Cloudemade API. how to draw the lines between the points.

    Read the article

  • File Uploads with Turbogears 2

    - by William Chambers
    I've been trying to work out the 'best practices' way to manage file uploads with Turbogears 2 and have thus far not really found any examples. I've figured out a way to actually upload the file, but I'm not sure how reliable it us. Also, what would be a good way to get the uploaded files name? file = request.POST['file'] permanent_file = open(os.path.join(asset_dirname, file.filename.lstrip(os.sep)), 'w') shutil.copyfileobj(file.file, permanent_file) file.file.close() this_file = self.request.params["file"].filename permanent_file.close() So assuming I'm understanding correctly, would something like this avoid the core 'naming' problem? id = UUID. file = request.POST['file'] permanent_file = open(os.path.join(asset_dirname, id.lstrip(os.sep)), 'w') shutil.copyfileobj(file.file, permanent_file) file.file.close() this_file = file.filename permanent_file.close()

    Read the article

  • CGPDFContextCreateWithURL not correctly creating context

    - by mjdth
    Using the following code, the ctx is not correctly being created. It remains nil: #import <QuartzCore/QuartzCore.h> @implementation UIView(PDFWritingAdditions) - (void)renderInPDFFile:(NSString*)path { CGRect mediaBox = self.bounds; CGContextRef ctx = CGPDFContextCreateWithURL((CFURLRef)[NSURL URLWithString:path], &mediaBox, NULL); CGPDFContextBeginPage(ctx, NULL); CGContextScaleCTM(ctx, 1, -1); CGContextTranslateCTM(ctx, 0, -mediaBox.size.height); [self.layer renderInContext:ctx]; CGPDFContextEndPage(ctx); CFRelease(ctx); } @end In the console it shows: <Error>: CGPDFContextCreate: failed to create PDF context delegate. I've tried several different paths so I'm fairly certain that is not the problem. Thanks for any advice!

    Read the article

  • Design for complex ATG applications

    - by Glen Borkowski
    Overview Needless to say, some ATG applications are more complex than others.  Some ATG applications support a single site, single language, single catalog, single currency, have a single development staff, single business team, and a relatively simple business model.  The real complex applications have to support multiple sites, multiple languages, multiple catalogs, multiple currencies, a couple different development teams, multiple business teams, and a highly complex business model (and processes to go along with it).  While it's still important to implement a proper design for simple applications, it's absolutely critical to do this for the complex applications.  Why?  It's all about time and money.  If you are unable to manage your complex applications in an efficient manner, the cost of managing it will increase dramatically as will the time to get things done (time to market).  On the positive side, your competition is most likely in the same situation, so you just need to be more efficient than they are. This article is intended to discuss a number of key areas to think about when designing complex applications on ATG.  Some of this can get fairly technical, so it may help to get some background first.  You can get enough of the required background information from this post.  After reading that, come back here and follow along. Application Design Of all the various types of ATG applications out there, the most complex tend to be the ones in the telecommunications industry - especially the ones which operate in multiple countries.  To get started, let's assume that we are talking about an application like that.  One that has these properties: Operates in multiple countries - must support multiple sites, catalogs, languages, and currencies The organization is fairly loosely-coupled - single brand, but different businesses across different countries There is some common functionality across all sites in all countries There is some common functionality across different sites within the same country Sites within a single country may have some unique functionality - relative to other sites in the same country Complex product catalog (mostly in terms of bundles, eligibility, and compatibility) At this point, I'll assume you have read through the required reading and have a decent understanding of how ATG modules work... Code / configuration - assemble into modules When it comes to defining your modules for a complex application, there are a number of goals: Divide functionality between the modules in a way that maps to your business Group common functionality 'further down in the stack of modules' Provide a good balance between shared resources and autonomy for countries / sites Now I'll describe a high level approach to how you could accomplish those goals...  Let's start from the bottom and work our way up.  At the very bottom, you have the modules that ship with ATG - the 'out of the box' stuff.  You want to make sure that you are leveraging all the modules that make sense in order to get the most value from ATG as possible - and less stuff you'll have to write yourself.  On top of the ATG modules, you should create what we'll refer to as the Corporate Foundation Module described as follows: Sits directly on top of ATG modules Used by all applications across all countries and sites - this is the foundation for everyone Contains everything that is common across all countries / all sites Once established and settled, will change less frequently than other 'higher' modules Encapsulates as many enterprise-wide integrations as possible Will provide means of code sharing therefore less development / testing - faster time to market Contains a 'reference' web application (described below) The next layer up could be multiple modules for each country (you could replace this with region if that makes more sense).  We'll define those modules as follows: Sits on top of the corporate foundation module Contains what is unique to all sites in a given country Responsible for managing any resource bundles for this country (to handle multiple languages) Overrides / replaces corporate integration points with any country-specific ones Finally, we will define what should be a fairly 'thin' (in terms of functionality) set of modules for each site as follows: Sits on top of the country it resides in module Contains what is unique for a given site within a given country Will mostly contain configuration, but could also define some unique functionality as well Contains one or more web applications The graphic below should help to indicate how these modules fit together: Web applications As described in the previous section, there are many opportunities for sharing (minimizing costs) as it relates to the code and configuration aspects of ATG modules.  Web applications are also contained within ATG modules, however, sharing web applications can be a bit more difficult because this is what the end customer actually sees, and since each site may have some degree of unique look & feel, sharing becomes more challenging.  One approach that can help is to define a 'reference' web application at the corporate foundation layer to act as a solid starting point for each site.  Here's a description of the 'reference' web application: Contains minimal / sample reference styling as this will mostly be addressed at the site level web app Focus on functionality - ensure that core functionality is revealed via this web application Each individual site can use this as a starting point There may be multiple types of web apps (i.e. B2C, B2B, etc) There are some techniques to share web application assets - i.e. multiple web applications, defined in the web.xml, and it's worth investigating, but is out of scope here. Reference infrastructure In this complex environment, it is assumed that there is not a single infrastructure for all countries and all sites.  It's more likely that different countries (or regions) could have their own solution for infrastructure.  In this case, it will be advantageous to define a reference infrastructure which contains all the hardware and software that make up the core environment.  Specifications and diagrams should be created to outline what this reference infrastructure looks like, as well as it's baseline cost and the incremental cost to scale up with volume.  Having some consistency in terms of infrastructure will save time and money as new countries / sites come online.  Here are some properties of the reference infrastructure: Standardized approach to setup of hardware Type and number of servers Defines application server, operating system, database, etc... - including vendor and specific versions Consistent naming conventions Provides a consistent base of terminology and understanding across environments Defines which ATG services run on which servers Production Staging BCC / Preview Each site can change as required to meet scale requirements Governance / organization It should be no surprise that the complex application we're talking about is backed by an equally complex organization.  One of the more challenging aspects of efficiently managing a series of complex applications is to ensure the proper level of governance and organization.  Here are some ideas and goals to work towards: Establish a committee to make enterprise-wide decisions that affect all sites Representation should be evenly distributed Should have a clear communication procedure Focus on high level business goals Evaluation of feature / function gaps and how that relates to ATG release schedule / roadmap Determine when to upgrade & ensure value will be realized Determine how to manage various levels of modules Who is responsible for maintaining corporate / country / site layers Determine a procedure for controlling what goes in the corporate foundation module Standardize on source code control, database, hardware, OS versions, J2EE app servers, development procedures, etc only use tested / proven versions - this is something that should be centralized so that every country / site does not have to worry about compatibility between versions Create a innovation team Quickly develop new features, perform proof of concepts All teams can benefit from their findings Summary At this point, it should be clear why the topics above (design, governance, organization, etc) are critical to being able to efficiently manage a complex application.  To summarize, it's all about competitive advantage...  You will need to reduce costs and improve time to market with the goal of providing a better experience for your end customers.  You can reduce cost by reducing development time, time allocated to testing (don't have to test the corporate foundation module over and over again - do it once), and optimizing operations.  With an efficient design, you can improve your time to market and your business will be more flexible  and agile.  Over time, you'll find that you're becoming more focused on offering functionality that is new to the market (creativity) and this will be rewarded - you're now a leader. In addition to the above, you'll realize soft benefits as well.  Your staff will be operating in a culture based on sharing.  You'll want to reward efforts to improve and enhance the foundation as this will benefit everyone.  This culture will inspire innovation, which can only lend itself to your competitive advantage.

    Read the article

  • Paperclip - Stream not recognized by identify command

    - by user117046
    I'm getting a paperclip error every time that I upload an image: [paperclip] An error was received while processing: #<Paperclip::NotIdentifiedByImageMagickError: /tmp/stream20100531-1921-uvlewk-0 is not recognized by the 'identify' command.> I'm running: Ubuntu 10.04, Imagemagick 6.5.1-0 (via apt-get), Paperclip 3.2.1.1 My path to identify is 'usr/bin/identify' and have confirmed Imagemagick works via command line I've tried putting adding the path to the options, but to no avail. I've tried: Paperclip.options[:command_path] = "usr/bin" or Paperclip.options.merge!(:command_path => "/usr/bin") in environment.rb or config/initializers/paperclip.rb. Though it makes no rational sense, I also tried "usr/local/bin" since this is the default for most people. Any thoughts on getting around this? Thanks!

    Read the article

  • Defining Form Input with Dialog

    - by Workoholic
    Hi. I want my php application to allow the user to select a file from their computer. I then want to store the file's path, but I don't want to upload the file. With the <input type="file" />, the file is uploaded, which would take too long. Is there a way to do this? Maybe if I change the input's type to text with jquery right before the form is sent? I could just let the user type the path, but that is not very convenient...

    Read the article

  • JSON Feed Appears to be XHR when it should be JS

    - by Oscar Godson
    I don't get why it'd doing this with the 2nd feed (appearing as a XHR call rather than just JS [looking at it in Firefox/Firebug]). The 2nd feed has the exact same MIME type as Flickr's JSON feed, yet the PortlandOregon.gov one shows as XHR and i get a NULL callback when using $.getJSON and if i use $.ajax with a 'json' or 'jsonp' type i get nothing at all. If i do the Flickr one i get the normal "[object Object]" callback. Whats going on? Please help! This has been such a headache for about a week. And i have authorization to change the feed, but i have to request the change, so if anyone knows for absolute sure let me know that! Response Headers from Flickr's API ( http://api.flickr.com/services/feeds/photos_public.gne?tags=cat&tagmode=any&format=json&jsoncallback=? ) [JS]: Date Mon, 15 Mar 2010 21:56:06 GMT P3P policyref="http://p3p.yahoo.com/w3c/p3p.xml", CP="CAO DSP COR CUR ADM DEV TAI PSA PSD IVAi IVDi CONi TELo OTPi OUR DELi SAMi OTRi UNRi PUBi IND PHY ONL UNI PUR FIN COM NAV INT DEM CNT STA POL HEA PRE GOV" Expires Mon, 26 Jul 1997 05:00:00 GMT Last-Modified Mon, 15 Mar 2010 21:52:17 GMT Cache-Control no-store, no-cache, must-revalidate, post-check=0, pre-check=0 Pragma no-cache Vary Accept-Encoding Content-Encoding gzip Content-Length 3647 Connection close Content-Type application/x-javascript; charset=utf-8 Request Headers Host api.flickr.com User-Agent Mozilla/5.0 (Macintosh; U; Intel Mac OS X 10.5; en-US; rv:1.9.2) Gecko/20100115 Firefox/3.6 Accept */* Accept-Language en-us,en;q=0.5 Accept-Encoding gzip,deflate Accept-Charset ISO-8859-1,utf-8;q=0.7,*;q=0.7 Keep-Alive 115 Connection keep-alive Referer http://oscargodson.com/dev/addWidget/test.html Cookie BX=4lflj455amesp&b=3&s=iv; fltoto=0%2C0%2C0%2C0%2C1%2C0%3B0%2C0%2C0%2C0%2C0%2C0%2C0%2C0%2C0%2C0%2C0%2C0%2C0%3B1%3B0%3B; search_z=t; localization=en-us%3Bus%3Bus PortlandOregon.gov ( http://www.portlandonline.com/shared/cfm/json.cfm?c=27321 ) [XHR]: Response Headers Connection close Date Mon, 15 Mar 2010 21:57:49 GMT Server Microsoft-IIS/6.0 Set-Cookie CONTACT_ID=0;path=/ LAST_USER=;path=/ BIGipServercgis_pol_web_pool-http=1191537418.20480.0000; path=/ Content-Type application/x-javascript; charset=utf-8 Request Headers Host www.portlandonline.com User-Agent Mozilla/5.0 (Macintosh; U; Intel Mac OS X 10.5; en-US; rv:1.9.2) Gecko/20100115 Firefox/3.6 Accept application/json, text/javascript, */* Accept-Language en-us,en;q=0.5 Accept-Encoding gzip,deflate Accept-Charset ISO-8859-1,utf-8;q=0.7,*;q=0.7 Keep-Alive 115 Connection keep-alive Referer http://oscargodson.com/dev/addWidget/test.html Origin http://oscargodson.com

    Read the article

  • Parse M3U file locations to fully qualified paths

    - by Guy
    I would like to parse the file location information in an M3U playlist into fully qualified paths. The possible formats in M3U files seem to be: c:\mydir\songs\tune.mp3 \songs\tune.mp3 ..\songs\tune.mp3 For the first example, just leave it alone. For the second add the directory that the playlist resides in so it would become c:\playlists\songs\tune.mp3 and the same for the third case so it would also become: c:\playlists\songs\tune.mp3. I'm using vb under VS2008 and I can't find a way to recognise each of the potential location formats in the M3U file. System.IO.Path offers no solution that I can find. I've searched extensively for terms like "convert relative path to absolute" but no luck. Any advice appreciated. Thanks.

    Read the article

  • setting library include paths in c++

    - by Drew
    Hi all, I just installed gd2 using mac ports (sudo install gd2), which installed libraries in the following places: /opt/local/include/gd.h /opt/local/lib/libgd.dylib (link) /opt/local/lib/libgd.la /opt/local/lib/libgd.a So when I create my c++ app I add '#include "gd.h"', which throws: main.cpp:4:16: error: gd.h: No such file or directory If I set gd.h as an absolute path (as above)(not a solution, but was curious), I am thrown: g++ -L/opt/local/include -L/opt/local/lib main.o Heatmap_Map.o Heatmap_Point.o -o heatmap Undefined symbols: "_gdImagePng", referenced from: _main in main.o "_gdImageLine", referenced from: _main in main.o "_gdImageColorAllocate", referenced from: _main in main.o _main in main.o "_gdImageDestroy", referenced from: _main in main.o "_gdImageCreate", referenced from: _main in main.o "_gdImageJpeg", referenced from: _main in main.o ld: symbol(s) not found So, I understand this means that ld can not find the libraries it needs (hence trying to give it hints with the "-L" values). So after giving g++ the -L hints and the absolute path in #include, I can get it to work, but I don't think I have to do this, how can I make g++/ld search int eh right places for the libraries? Drew J. Sonne.

    Read the article

< Previous Page | 523 524 525 526 527 528 529 530 531 532 533 534  | Next Page >