Search Results

Search found 612 results on 25 pages for 'scheduling'.

Page 6/25 | < Previous Page | 2 3 4 5 6 7 8 9 10 11 12 13  | Next Page >

  • SQL Server Job system silently fails

    - by Brett Veenstra
    We run numerous scheduled jobs using MS SQL 2005 job scheduler. Over the past few weeks, we've been witnessing that a running job will simply STOP and will not record any history in the Log File Viewer. What appears to be happening is that the server will start a job and record these steps into msdb. At a random step during a job, the server will stop running the job and it records no error. This silent failure prevents a "Step 0" record from being created and we won't see anything in the Log File Viewer. Anyone else experience this?

    Read the article

  • Open source alternative to Autosys?

    - by oninea
    As an alternative to Autosys, what is the best open source job scheduler? This question is a bit subjective but I'm looking for something that is widely used in production environments, has a good community, and has enterprise grade features.

    Read the article

  • Can KVM CPU assignment count differ from physical hosts CPU count?

    - by javano
    I have read this question. I knew already that I could for example, have a quad core machine with four guests each having two vCPUs. As they don't all be require 100% CPU usage all the time, the scheduler would handle this for me. My question is about how this relates to a fail-over or migration situation; If host1 has two dual-core CPUs, and I assign guest1 four vCPUs (so it accessed all four physical cores), what will happen if I try and migrate it to host2 which only has one dual-core CPU? Can qemu-kvm emulate more vCPUs than there are physical? Or would I have to shut down the virtual machine, change the CPU assignment, migrate it, and then boot it back up (so no live migration)? Many thanks.

    Read the article

  • Why is Windows Task Scheduler trying to launch multiple instances?

    - by Paul H
    We have a number of Windows Scheduled tasks that run on one Server 2008 Webserver (not R2) which is in a cluster. We recently moved from an original webserver Cluster to a new webserver Cluser (Server 2008 - not R2). The new webserver (in the cluster) running the Windows Tasks is setup the same as on the original we believe. BUT we now find that on the new Windows Server the Windows Task Scheduler seems to want to instantly start each task three times. If we set the option to queue up a new task we get: Event ID 324 Task Scheduler queued instance "{9a1a8411-b042-45ff-8e6b-89874df230d7}" of task "\Client Reporting" and will launch it as soon as instance "{2bcc3df6-ea3b-4453-90c2-75b8b1946388}" completes. If we set the option to stop an existing task we get: Event ID 323 Task Scheduler stopped instance "{e685a910-b32b-414e-85fd-96bbe54314a2}" of task "\Client Reporting" in order to launch new instance "{4db66265-1f51-4ede-8535-ac7c3cb5c4c1}" . Ticked settings: Allow task to be run on demand. Run task as soon as possible after a scheduled start is missed. Stop the task if running for longer than 1 hour. If the running task does not end when requested force it to stop. Start the task only if the computer is on AC power. Stop the task if the computer switches to battery power. Selected option: If the task is already running - stop the existing instance. Note: We moved the tasks from one server to another in the cluster to see if it the Task Scheduler on the particular server we'd picked causing the problem. Same behaviour. Could it be something to do with the build of the new servers? We have very similar tasks set up on another server cluster that work OK without all this multiple starting. Comparing those tasks to the ones here - there does not seem to be anything obviously different in terms of settings available to us through the options within the Task Scheduler. Trigger: The task is scheduled to be triggered daily, once an hour - and to be stopped if it exceeds this time. Action: Runs a .bat file. What could be causing this/where we can look to see what logic is causing the tasks to start multiple times in this way?

    Read the article

  • Three server processes consume no more than 50% of Dual Core CPU

    - by thor
    I have three processes running on Intel Core 2 Duo CPU. From watching output of 'top' and graphs of CPU load (drawn by MRTG, data collection via SNMP) I can see that CPU load is never more than 50%, and, most of the day, when those processes are busy CPU load has a ceiling at 50 %. I mean, CPU load grows up to 50% in the morning and stays there until late evening. My first thought was that only one core was used at 100% thus giving 50% of both CPUs. But, as there are three processes running and from 'top' I see that both cores are being loaded, so this is not the case. schedtool shows that CPU affinity for those three processes is at default, 0x03, allowing them to use both cores. If I force one process to one core (schedtool -a 0x01), and two others to second (schedtool -a 0x02), cumulative usage grows beyond 50%. Why three processes seem to consume only 50% of two cores? Why forcing them to different CPUs allows usage to grow higher? Any hints? P.S. Processes in question are Counter-Strike servers.

    Read the article

  • Multi-account Google Apps Calendar Free-busy status?

    - by Andrew Bolster
    I have 3 google apps domain accounts and a personal google account, and until recently, there was little need for the google app's calendars to have any real use; Now however the powers that be finally discovered the smart re-scheduler and the other google tools for managing meetings and schedules; unfortunately I'm now in a position where I've got events notifications all over the place and because each of the calendars do not know about each other, I'm losing all of the advantages of rescheduler / free-busy status. TL;DR, 4 calendars, unified 'free busy' status without having to manually copy every event please.

    Read the article

  • How to schedule download of windows 7 updates?

    - by atoMerz
    To put it short: I'd like to schedule my windows updates to start/stop at certain times of day. How can I do this? More explanation: This is because my internet traffic is limited by ISP and it's free only during a specific period throughout the day (2:00am-7:00am). I've set windows update setting to check for updates but notify me before downloading in order to prevent it from automatically using up my traffic. But then I have to manually tell it when to start downloading. I obviously don't want to stay up that late just to push a button. So again, how can I schedule windows updates to start/stop at specified times?

    Read the article

  • How to learn to estimate how long assigments will take?

    - by SDGator
    This might be out of scope for this website. If it is, let me know and I'll remove the question. After 15 years in the industry, I still suck at answering the question "How long do you think X will take?" For scheduling purposes, we always have to give an estimate of how long different sub-tasks in a project will take. What's the best way to get better at estimating how long it will take to do something? Some people are really good at this. Are there any books, techniques or whatever that people use to get better at this?

    Read the article

  • Is there a known algorithm for scheduling tournament matchups?

    - by barfoon
    Just wondering if there is a tournament scheduling algorithm already out there that I could use or even adapt slightly. Here are my requirements: A variable number of opponents belonging to a variable number of teams/clubs each must be paired with an opponent Two opponents cannot be from the same club If there are an odd number of players, 1 of them randomly is selected to get a bye Any algorithms related to this sort of requirement set would be appreciated. EDIT: I only need to run this a maximum of one time, creating matchups for the first 'round' of the tournament.

    Read the article

  • Tab Sweep: Logging, WebSocket, NoSQL, Vaadin, RESTful, Task Scheduling, Environment Entries, ...

    - by arungupta
    Recent Tips and News on Java, Java EE 6, GlassFish & more : • Detailed Logging Output with GlassFish Server, Hibernate, and Log4j (wikis.oracle.com) • Serving Static Content on WebLogic and GlassFish (Colm Divilly) • Java EE and communication between applications (Martin Crosnier) • What are the new features in Java EE 6? (jguru) • Standardizing JPA for NoSQL: are we there yet? (Emmanuel) • Create an Asynchronous JAX-WS Web Service and call it from Oracle BPEL 11g (Bob) • Programmatic Login to Vaadin application with JAAS utilizing JavaEE6 features and Spring injection (vaadin) • Is in an EJB injected EntityManager thread-safe? (Adam Bien) • Websocket using Glassfish (demj33) • Designing and Testing RESTful web services [ UML, REST CLIENT ] (Mamadou Lamine Ba) • Glassfish hosting -Revion.com Glassfish Oracle hosting (revion.com) • Task Scheduling in Java EE 6 on GlassFish using the Timer Service (Micha Kops) • JEE 6 Environmental Enterprise Entries and Glassfish (Slim Ouertani) • Top 10 Causes of Java EE Enterprise Performance Problems (Pierre - Hugues Charbonneau)

    Read the article

  • Quartz.NET trigger not firing

    - by billy_bob_the
    i am using Quartz.NET in my ASP.NET web application. i put the following code in a button click handler to make sure that it executes (for testing purposes): Quartz.ISchedulerFactory factory = new Quartz.Impl.StdSchedulerFactory(); Quartz.IScheduler scheduler = factory.GetScheduler(); Quartz.JobDetail job = new Quartz.JobDetail("job", null, typeof(BackupJob)); Quartz.Trigger trigger = Quartz.TriggerUtils.MakeDailyTrigger(8, 30); // i edit this each time before compilation (for testing purposes) trigger.StartTimeUtc = Quartz.TriggerUtils.GetEvenSecondDate(DateTime.UtcNow); trigger.Name = "trigger"; scheduler.ScheduleJob(job, trigger); scheduler.Start(); here's "BackupJob": public class BackupJob : IJob { public BackupJob() { } public void Execute(JobExecutionContext context) { NSG.BackupJobStart(); } } my question: why is "BackupJobStart()" not firing? i've used similar code before and it worked fine. EDIT: @Andy White, i would have it in Application_Start in Global.asax. this doesn't work which is why i moved it to a button click handler to narrow down the problem.

    Read the article

  • How is this Quartz Cron Expression executed

    - by n002213f
    I have a the following; private String cronExpression = ""; private final String jobID = "MyJObID"; ... Scheduler scheduler = ServiceLocator.getInstance().getScheduler(); CronTrigger trigger = new CronTrigger(jobID , Scheduler.DEFAULT_GROUP, cronExpression); JobDetail jobDetail = new JobDetail(jobID , Scheduler.DEFAULT_GROUP, MyJob.class); scheduler.scheduleJob(jobDetail, trigger); My question is when is this job triggered for the empty cron expression?

    Read the article

  • Lawler's Algorithm Implementation Assistance

    - by Richard Knop
    Here is my implemenation of Lawler's algorithm in PHP (I know... but I'm used to it): <?php $jobs = array(1, 2, 3, 4, 5, 6); $jobsSubset = array(2, 5, 6); $n = count($jobs); $processingTimes = array(2, 3, 4, 3, 2, 1); $dueDates = array(3, 15, 9, 7, 11, 20); $optimalSchedule = array(); foreach ($jobs as $j) { $optimalSchedule[] = 0; } $dicreasedCardinality = array(); for ($i = $n; $i >= 1; $i--) { $x = 0; $max = 0; // loop through all jobs for ($j = 0; $j < $i; $j++) { // ignore if $j already is in the $dicreasedCardinality array if (false === in_array($j, $dicreasedCardinality)) { // if the job has no succesor in $jobsSubset if (false === isset($jobs[$j+1]) || false === in_array($jobs[$j+1], $jobsSubset)) { // here I find an array index of a job with the maximum due date // amongst jobs with no sucessor in $jobsSubset if ($x < $dueDates[$j]) { $x = $dueDates[$j]; $max = $j; } } } } // move the job at the end of $optimalSchedule $optimalSchedule[$i-1] = $jobs[$max]; // decrease the cardinality of $jobs $dicreasedCardinality[] = $max; } print_r($optimalSchedule); Now the above returns an optimal schedule like this: Array ( [0] => 1 [1] => 1 [2] => 1 [3] => 3 [4] => 2 [5] => 6 ) Which doesn't seem right to me. The problem might be with my implementation of the algorithm because I am not sure I understand it correctly. I used this source to implement it: http://www.google.com/books?id=aSiBs6PDm9AC&pg=PA166&dq=lawler%27s+algorithm+code&lr=&hl=sk&cd=4#v=onepage&q=&f=false The description there is a little confusing. For example, I didn't quite get how is the subset D defined (I guess it is arbitrary). Could anyone help me out with this? I have been trying to find some sources with simpler explanation of the algorithm but all sources I found were even more complicated (with math proofs and such) so I am stuck with the link above. Yes, this is a homework, if it wasn't obvious. I still have few weeks to crack this but I have spent few days already trying to get how exactly this algorithm works with no success so I don't think I will get any brighter during that time.

    Read the article

  • get mail, Fire Job, Asp.Net, C#.Net

    - by AjmeraInfo
    I live in India and My hosting server at US. I am using MSSQL, ASP.Net and C#.Net I want to fire job when i will get email. ex. someone send mail on my address. then i want to get sms for email description. it not possible to install any desktop or console application on US hosting server. I don't have that type of rights.

    Read the article

  • Quartz job fires multiple times

    - by GustlyWind
    Hi, I have a building block which sets up a Quartz job to send out emails every morning. The job is fired three times every morning instead of once. We have a hosted instance of Blackboard, which I am told runs on three virtual servers. I am guessing this is what is causing the problem, as the building block was previously working fine on a single server installation. Does anyone have Quartz experience, or could suggest how one might prevent the job from firing multiple times? Thanks,

    Read the article

  • Cron syntax with Java EE 5?

    - by marabol
    Timer Tasks in Java EE are not very comfortable. Is there any util, to configure timer with cron syntax like "0 20 20 * * "? I wonder, if it would be a good way to use Quartzinside (clustered) JEE application. According to http://www.prozesse-und-systeme.de/serverClustering.html (german page) there limits with Quartz and Java EE clustering: JDBC must be used as job store for Quartz Only cluster associated Quartz instances are allowed to use this JDBC job store All cluster nodes must be synchronized to the split second All cluster nodes must use the same quartz.properties file I would prefer an easier way for configuration of timer service, instead an not Java EE managed scheduler.

    Read the article

  • How can I schedule tasks in a WinForms app?

    - by Greg
    QUESTION: How can I schedule tasks in a WinForms app? That is either (a) what is the best approach / .NET classes/methods to use of (b) if there is an open source component that does this well which one would be recommended. BACKGROUND: Winforms app (.NET v3.5, C#, VS2008) I'm assuming I will run the winforms application always, and just minimise to the system tray when not in use Want a simple approach (didn't want to get into separate service running that UI winforms app talks to etc) Want to be able to let the user select how often to schedule the sync (e.g. hourly, daily - pick time, etc) Ability to at the times when the scheduler fires to run a chunk of code (assume it could be wrapped as a backgroundworker task for example) The application is always running & appears in the system tray

    Read the article

  • Heuristic algorithm for load balancing among threads.

    - by Il-Bhima
    I'm working on a multithreaded program where I have a number of worker threads performing tasks of unequal length. I want to load-balance the tasks to ensure that they do roughly the same amount of work. For task T_i I have a number c_i which provides a good approximation to the amount of work that is required for that task. I'm looking for an efficient (O(N) N = num tasks or better) algorithm which will give me "roughly" a good load balance given the values of c_i. It doesn't have to be optimal, but I would like to be able to have some theoretical bounds on how bad the resulting allocations are. Any ideas?

    Read the article

  • "Work stealing" vs. "Work shrugging (tm)"?

    - by John
    Why is it that I can find lots of information on "work stealing" and nothing on a "work shrugging(tm)" as a load-balancing strategy? I am surprised because work-stealing seems to me to have an inherent weakness when implementating efficient fine-grained load-balancing. Vis:- Relying on consumer processors to implement distribution (by actively stealing) begs the question of what these processors do when they find no work? None of the work-stealing references and implementations I have come across so far address this issue satisfactorarily for me. They either:- 1) Manage not to disclose what they do with idle processors! [Cilk] (?anyone know?) 2) Have all idle processors sleep and wake periodically and scatter messages to the four winds to see if any work has arrived [e.g. JAWS] (= way too latent & inefficient for me). 3) Assume that it is acceptable to have processors "spinning" looking for work ( = non-starter for me!) Unless anyone thinks there is a solution for this I will move on to consider a "Work Shrugging(tm)" strategy. Having the task-producing processor distribute excess load seems to me inherently capable of a much more efficient implementation. However a quick google didn't show up anything under the heading of "Work Shrugging" so any pointers to prior-art would be welcome. tx Tags I would have added if I was allowed to [work-stealing]

    Read the article

  • PHP queue jobs in centOS

    - by Soe Naung Win
    I wrote a PHP shell script which include queuing jobs in centOS with 'at' command. The queue jobs may vary in time and contents which means the system need to keep quite a large number of jobs. The application logic will also be a bit difficult to setup with cronjob. Is there a limit in number of queue jobs in centOS or is there any alternative way of queuing jobs?

    Read the article

  • Time tracking solution for Windows / Eclipse PHP

    - by Industrial
    Hi everybody, After seeing this movie and the introduction to Lapsus (http://synapticmishap.co.uk/synapticmishap/lapsuspromo/) I really felt that I had missed this feature in my own daily work. Are there any time tracking solution for windows that can monitor a set folder and its changes to the content files that may or may not integrate with Eclipse PHP? Thanks!

    Read the article

  • Quartz Thread Execution Parallel or Sequential?

    - by vikas
    We have a quartz based scheduler application which runs about 1000 jobs per minute which are evenly distributed across seconds of each minute i.e. about 16-17 jobs per second. Ideally, these 16-17 jobs should fire at same time, however our first statement, which simply logs the time of execution, of execute method of the job is being called very late. e.g. let us assume we have 1000 jobs scheduled per minute from 05:00 to 05:04. So, ideally the job which is scheduled at 05:03:50 should have logged the first statement of the execute method at 05:03:50, however, it is doing it at about 05:06:38. I have tracked down the time taken by the scheduled job which comes around 15-20 milliseconds. This scheduled job is fast enough because we just send a message on an ActiveMQ queue. We have specified the number of threads of quartz to be 100 and even tried with increasing it to 200 and more, but no gain. One more thing we noticed is that logs from scheduler are coming sequential after first 1 minute i.e. [Quartz_Worker_28] <Some log statement> .. .. [Quartz_Worker_29] <Some log statement> .. .. [Quartz_Worker_30] <Some log statement> .. .. So it suggesting that after some time quartz is running threads almost sequential. May be this is happening due to the time taken in notifying the job completion to persistence store (which is a separate postgres database in this case) and/or context switching. What can be the reason behind this strange behavior? EDIT: More detailed Log [06/07/12 10:08:37:192][QuartzScheduler_Worker-34][INFO] org.quartz.plugins.history.LoggingTriggerHistoryPlugin - Trigger [<trigger_name>] fired job [<job_name>] scheduled at: 06-07-2012 10:08:33.458, next scheduled at: 06-07-2012 10:34:53.000 [06/07/12 10:08:37:192][QuartzScheduler_Worker-34][INFO] <my_package>.scheduler.quartz.ScheduledLocateJob - execute begin--------- ScheduledLocateJob with key: <job_name> started at Fri Jul 06 10:08:37 EDT 2012 [06/07/12 10:08:37:192][QuartzScheduler_Worker-34][INFO] <my_package>.scheduler.quartz.ScheduledLocateJob <some log statement> [06/07/12 10:08:37:192][QuartzScheduler_Worker-34][INFO] <my_package>.scheduler.quartz.ScheduledLocateJob <some log statement> [06/07/12 10:08:37:192][QuartzScheduler_Worker-34][INFO] <my_package>.scheduler.quartz.ScheduledLocateJob <some log statement> [06/07/12 10:08:37:220][QuartzScheduler_Worker-34][INFO] <my_package>.scheduler.quartz.ScheduledLocateJob - execute end--------- ScheduledLocateJob with key: <job_name> ended at Fri Jul 06 10:08:37 EDT 2012 [06/07/12 10:08:37:220][QuartzScheduler_Worker-34][INFO] org.quartz.plugins.history.LoggingTriggerHistoryPlugin - Trigger [<trigger_name>] completed firing job [<job_name>] with resulting trigger instruction code: DO NOTHING. Next scheduled at: 06-07-2012 10:34:53.000 I am doubting on this section of the above log scheduled at: 06-07-2012 10:08:33.458, next scheduled at: 06-07-2012 10:34:53.000 because this job was scheduled for 10:04:53, but it fired at 10:08:33 and still quartz didn't consider it as misfire. Shouldn't it be a misfire?

    Read the article

< Previous Page | 2 3 4 5 6 7 8 9 10 11 12 13  | Next Page >