Search Results

Search found 8815 results on 353 pages for 'task scheduler'.

Page 7/353 | < Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >

  • Scheduled Task to show console window when logged on but still run when not logged on

    - by HeartWare
    Is it possible (and if so, how) to set up a task (console application) in Server 2008 so that it'll run both when a user is logged in and when no user is logged in, AND - if the user is logged in (either local or via RDP) - have the console appear on the screen while the program is running? Ie. the program should run under the defined user context and it writes status messages to stdout, which goes to a standard console window. This console window is either shown (if the defined user is currently logged in locally or via RDP), or not shown (but the application is still run). I have access to the source of the console application, so if it needs some additional code (like specifically opening up a new console window or what have you), then that's not a problem. At the moment, I can set up the task as "Run only when user is logged on" which will run the application when the user is logged on (local or RDP) and I can then see the status messages, or I can set it up as "Run whether user is logged or not" and no status output is visible - not even if the user is logged on.

    Read the article

  • Running a scheduled task as SYSTEM with console window open

    - by raoulsson
    I am auto creating scheduled tasks with this line within a batch windows script: schtasks /Create /RU SYSTEM /RP SYSTEM /TN startup-task-%%i /TR %SPEEDWAY_DIR%\%TARGET_DIR%%%i\%STARTUPFILE% /SC HOURLY /MO 1 /ST 17:%%i1:00 I wanted to avoid using specific user credentials and thus decided to use SYSTEM. Now, when checking in the taskmanagers process list or, even better, directly with the C:\> schtasks command itself, all is working well, the tasks are running as intended. However in this particular case I would like to have an open console window where I can see the log flying by. I know I could use C:\> tail -f thelogfile.log if I installed e.g. cygwin (on all machines) or some proprietary tools like Baretail on Windows. But since I only switch to these machines in case of trouble, I would prefer to start the scheduled task in such a way that every user immediately sees the log. Any chance? Thanks!

    Read the article

  • Windows 8 Task Manager without elevating?

    - by Ben Voigt
    In Windows Vista and Windows 7, the task manager ran non-elevated, and you didn't face a UAC prompt unless you chose "View Processes of All Users". In Windows 8 Preview, out of the box the Task Manager starts elevated every time. How can I configure it to start non-elevated so I don't get hit with a UAC prompt every time I check CPU usage or view the list of running processes to see if an application closed completely? (I am not looking for answers which involve weakening UAC, and I ask the community's help in downvoting any such suggestions.)

    Read the article

  • Running a scheduled task as SYSTEM with console window open

    - by raoulsson
    I am auto creating scheduled tasks with this line within a batch windows script: schtasks /Create /RU SYSTEM /RP SYSTEM /TN startup-task-%%i /TR %SPEEDWAY_DIR%\%TARGET_DIR%%%i\%STARTUPFILE% /SC HOURLY /MO 1 /ST 17:%%i1:00 I wanted to avoid using specific user credentials and thus decided to use SYSTEM. Now, when checking in the taskmanagers process list or, even better, directly with the C:\> schtasks command itself, all is working well, the tasks are running as intended. However in this particular case I would like to have an open console window where I can see the log flying by. I know I could use C:\> tail -f thelogfile.log if I installed e.g. cygwin (on all machines) or some proprietary tools like Baretail on Windows. But since I only switch to these machines in case of trouble, I would prefer to start the scheduled task in such a way that every user immediately sees the log. Any chance? Thanks!

    Read the article

  • What is your best solution for task management?

    - by oo
    I have Outlook at work, Gmail at home and a BlackBerry (only syncs with work Outlook). I see that there are a number of online websites that support webbased task lists such as "remember the milk", etc. My biggest issue with Outlook is that I flag a number of emails as tasks and they show up as tasks in Outlook but NOT on my BlackBerry. I still haven't found a workaround to this. I see there is some BlackBerry sync tools but I am not sure if this will work with my corporate network. Any suggestions for getting this to work or another optimal task management solution that works at home, work and on the road?

    Read the article

  • Using Exception Handler in an ADF Task Flow

    - by anmprs
    Problem Statement: Exception thrown in a task flow gets wrapped in an exception that gives an unintelligible error message to the user. Figure 1 Solution 1. Over-writing the error message with a user-friendly error message. Figure 2 Steps to code 1. Generating an exception: Write a method that throws an exception and drop it in the task flow.2. Adding an Exception Handler: Write a method (example below) to overwrite the Error in the bean or data control and drop the method in the task flow. Figure 3 This method is marked as the Exception Handler by Right-Click on method > Mark Activity> Exception Handler or by the button that is displayed in this screenshot Figure 4 The Final task flow should look like this. This will overwrite the exception with the error message in figure 2. Note: There is no need for a control flow between the two method calls (as shown below). Figure 5 Solution 2: Re-Routing the task flow to display an error page Figure 6 Steps to code 1. This is the same as step 1 of solution 1.2. Adding an Exception Handler: The Exception handler is not always a method; in this case it is implemented on a task flow return.  The task flow looks like this. Figure 7 In the figure below you will notice that the task flow return points to a control flow ‘error’ in the calling task flow. Figure 8 This control flow in turn goes to a view ‘error.jsff’ which contains the error message that one wishes to display.  This can be seen in the figure below. (‘withErrorHandling’ is a  call to the task flow in figure 7) Figure 9

    Read the article

  • Introduction to Human Workflow 11g

    - by agiovannetti
    Human Workflow is a component of SOA Suite just like BPEL, Mediator, Business Rules, etc. The Human Workflow component allows you to incorporate human intervention in a business process. You can use Human Workflow to create a business process that requires a manager to approve purchase orders greater than $10,000; or a business process that handles article reviews in which a group of reviewers need to vote/approve an article before it gets published. Human Workflow can handle the task assignment and routing as well as the generation of notifications to the participants. There are three common patterns or usages of Human Workflow: 1) Approval Scenarios: manage documents and other transactional data through approval chains . For example: approve expense report, vacation approval, hiring approval, etc. 2) Reviews by multiple users or groups: group collaboration and review of documents or proposals. For example, processing a sales quote which is subject to review by multiple people. 3) Case Management: workflows around work management or case management. For example, processing a service request. This could be routed to various people who all need to modify the task. It may also incorporate ad hoc routing which is unknown at design time. SOA 11g Human Workflow includes the following features: Assignment and routing of tasks to the correct users or groups. Deadlines, escalations, notifications, and other features required for ensuring the timely performance of a task. Presentation of tasks to end users through a variety of mechanisms, including a Worklist application. Organization, filtering, prioritization and other features required for end users to productively perform their tasks. Reports, reassignments, load balancing and other features required by supervisors and business owners to manage the performance of tasks. Human Workflow Architecture The Human Workflow component is divided into 3 modules: the service interface, the task definition and the client interface module. The Service Interface handles the interaction with BPEL and other components. The Client Interface handles the presentation of task data through clients like the Worklist application, portals and notification channels. The task definition module is in charge of managing the lifecycle of a task. Who should get the task assigned? What should happen next with the task? When must the task be completed? Should the task be escalated?, etc Stages and Participants When you create a Human Task you need to specify how the task is assigned and routed. The first step is to define the stages and participants. A stage is just a logical group. A participant can be a user, a group of users or an application role. The participants indicate the type of assignment and routing that will be performed. Stages can be sequential or in parallel. You can combine them to create any usage you require. See diagram below: Assignment and Routing There are different ways a task can be assigned and routed: Single Approver: task is assigned to a single user, group or role. For example, a vacation request is assigned to a manager. If the manager approves or rejects the request, the employee is notified with the decision. If the task is assigned to a group then once one of managers acts on it, the task is completed. Parallel : task is assigned to a set of people that must work in parallel. This is commonly used for voting. For example, a task gets approved once 50% of the participants approve it. You can also set it up to be a unanimous vote. Serial : participants must work in sequence. The most common scenario for this is management chain escalation. FYI (For Your Information) : task is assigned to participants who can view it, add comments and attachments, but can not modify or complete the task. Task Actions The following is the list of actions that can be performed on a task: Claim : if a task is assigned to a group or multiple users, then the task must be claimed first to be able to act on it. Escalate : if the participant is not able to complete a task, he/she can escalate it. The task is reassigned to his/her manager (up one level in a hierarchy). Pushback : the task is sent back to the previous assignee. Reassign :if the participant is a manager, he/she can delegate a task to his/her reports. Release : if a task is assigned to a group or multiple users, it can be released if the user who claimed the task cannot complete the task. Any of the other assignees can claim and complete the task. Request Information and Submit Information : use when the participant needs to supply more information or to request more information from the task creator or any of the previous assignees. Suspend and Resume :if a task is not relevant, it can be suspended. A suspension is indefinite. It does not expire until Resume is used to resume working on the task. Withdraw : if the creator of a task does not want to continue with it, for example, he wants to cancel a vacation request, he can withdraw the task. The business process determines what happens next. Renew : if a task is about to expire, the participant can renew it. The task expiration date is extended one week. Notifications Human Workflow provides a mechanism for sending notifications to participants to alert them of changes on a task. Notifications can be sent via email, telephone voice message, instant messaging (IM) or short message service (SMS). Notifications can be sent when the task status changes to any of the following: Assigned/renewed/delegated/reassigned/escalated Completed Error Expired Request Info Resume Suspended Added/Updated comments and/or attachments Updated Outcome Withdraw Other Actions (e.g. acquiring a task) Here is an example of an email notification: Worklist Application Oracle BPM Worklist application is the default user interface included in SOA Suite. It allows users to access and act on tasks that have been assigned to them. For example, from the Worklist application, a loan agent can review loan applications or a manager can approve employee vacation requests. Through the Worklist Application users can: Perform authorized actions on tasks, acquire and check out shared tasks, define personal to-do tasks and define subtasks. Filter tasks view based on various criteria. Work with standard work queues, such as high priority tasks, tasks due soon and so on. Work queues allow users to create a custom view to group a subset of tasks in the worklist, for example, high priority tasks, tasks due in 24 hours, expense approval tasks and more. Define custom work queues. Gain proxy access to part of another user's tasks. Define custom vacation rules and delegation rules. Enable group owners to define task dispatching rules for shared tasks. Collect a complete workflow history and audit trail. Use digital signatures for tasks. Run reports like Unattended tasks, Tasks productivity, etc. Here is a screenshoot of what the Worklist Application looks like. On the right hand side you can see the tasks that have been assigned to the user and the task's detail. References Introduction to SOA Suite 11g Human Workflow Webcast Note 1452937.2 Human Workflow Information Center Using the Human Workflow Service Component 11.1.1.6 Human Workflow Samples Human Workflow APIs Java Docs

    Read the article

  • Ideal data structure/techniques for storing generic scheduler data in C#

    - by GraemeMiller
    I am trying to implement a generic scheduler object in C# 4 which will output a table in HTML. Basic aim is to show some object along with various attributes, and whether it was doing something in a given time period. The scheduler will output a table displaying the headers: Detail Field 1 ....N| Date1.........N I want to initialise the table with a start date and an end date to create the date range (ideally could also do other time periods e.g. hours but that isn't vital). I then want to provide a generic object which will have associated events. Where an object has events within the period I want a table cell to be marked E.g. Name Height Weight 1/1/2011 2/1/2011 3/1/20011...... 31/1/2011 Ben 5.11 75 X X X Bill 5.7 83 X X So I created scheduler with Start Date=1/1/2011 and end date 31/1/2011 I'd like to give it my person object (already sorted) and tell it which fields I want displayed (Name, Height, Weight) Each person has events which have a start date and end date. Some events will start and end outwith but they should still be shown on the relevant date etc. Ideally I'd like to have been able to provide it with say a class booking object as well. So I'm trying to keep it generic. I have seen Javasript implementations etc of similar. What would a good data structure be for this? Any thoughts on techniques I could use to make it generic. I am not great with generics so any tips appreciated.

    Read the article

  • Task Manager always crashes..

    - by tallship
    This is the error report: Problem signature: Problem Event Name: APPCRASH Application Name: taskmgr.exe Application Version: 6.1.7600.16385 Application Timestamp: 4a5bc3ee Fault Module Name: hostv32.dll Fault Module Version: 0.0.0.0 Fault Module Timestamp: 4c5c027d Exception Code: c0000005 Exception Offset: 0000000000068b73 OS Version: 6.1.7600.2.0.0.256.48 Locale ID: 1033 Additional Information 1: bf4f Additional Information 2: bf4f79e8ecbde38b818b2c0e2771a379 Additional Information 3: d246 Additional Information 4: d2464c78aa97e6b203cd0fca121f9a58 Read our privacy statement online: http://go.microsoft.com/fwlink/?linkid=104288&clcid=0x0409 If the online privacy statement is not available, please read our privacy statement offline: C:\Windows\system32\en-US\erofflps.txt Whenever I open the task manager, within a few seconds it crashes, saying it has stopped working with the above report. I took the fault module (hostv32.dll) and scanned it with avast but it found no threat. I also ran a SFC /scannow from an elevated command prompt and it didn't find any corrupted files. This problem is in all two user accounts in this computer (Windows 7). There was one time where task manager seemed to work, but when I closed it and opened it again, it crashed. Any reason/solution to this problem?

    Read the article

  • windows 2008 task scheduled batch file runs forever

    - by phill
    I currently have the following batch running in windows 2008 task scheduler. mysql --user=bobdb --password=letmein --force --named-commands --local-infile=1 --execute="insert into bobdb.attendees (name) values ('bob');insert into bobdb.attendees (name) values ('rick');" It executes nicely when I run it from a command prompt and it executes when I force it to run and it executes when it is scheduled to run. My issue is when it does run, the task scheduler seems to keep it running until it hits a timeout. Is there a command to tell it when it is finished running in the batch file so it doesn't throw a timeout error? thanks in advance

    Read the article

  • When implementing a microsoft.build.utilities.task how to i get access to the various environmental

    - by Simon
    When implementing a microsoft.build.utilities.task how to i get access to the various environmental variables of the build? For example "TargetPath" I know i can pass it in as part of the task XML <MyTask TargetPath="$(TargetPath)" /> But i don't want to force the consumer of the task to have to do that if I can access the variable in code. http://msdn.microsoft.com/en-us/library/microsoft.build.utilities.task.aspx

    Read the article

  • Looking for personal scheduling software / todo list with rather particular requirements

    - by Cthulhu
    I've been scouring the web for a couple of (my boss') hours, looking for a piece of software that can organize my tasks in two ways. First, I have a list of bullet points / todo items I can do at any given time. Think of stuff like solve issue X, ask X about Y, write documentation about Z, etcetera. Second, I have a number of running projects I'd like to organize better, as in schedule for a certain part of a day of the week. Ideally (I think), my day would be organized as 50% spent on projects and 50% on the other small things. Now, I don't like most calendar applications (such as Outlook & friends), their UI is too 'official', not really easy to move stuff around (in my experience). I don't like most todo lists either, too static and things. I like new, fast and hip software. I've looked at GTD versions of Tiddlywiki, and I like mGSD for one particular feature. You can make lists of tasks and basically give them one of three statusses - Now (nothing required, you can do it right away), Waiting (you need someone or something before you can work on this), or the most gratifying of all, Done. I like that feature because it's a simple todo list, but indicates more accurately the things you can do right now and the things you depend on someone else for to do. Anyways, that's just a small aspect of that program - most of the other things in there I can't find a particularly good use for. If there's something like that (maybe something that works even snappier, cleaner UI), combined with an easy to use bit of scheduling software (optionally separated into two applications, but preferrably not), I think I'd like that. (Besides something like that, I also use several instances of Trac to monitor tasks and bugs and things for the various clients and projects I have to serve, and TaskCoach to monitor the amount of time I spend on each task / each client. An easy / low-maintenance time tracking software would be neat too) Of course, the software has to be free to use. I don't like shareware, trials, limited software and the like. I could develop my own too, but I'm lazy like that and there's a dozen other projects I'd like to do in my free time (neither of which I actually do). Edit: I like David Seah's printable CEO stuff, if something like that (with some video game / instant achievement / gratification) exists in software, it'd be awesome.

    Read the article

  • Robocopy failure with Windows Server 2008 Scheduled Task

    - by CC
    So I have a batch script for robocopy. Running this from the command line does exactly what I want. robocopy "D:\SQL Backup" \\server1\Backup$\daily /mir /s /copyall /log:\\lmcrfs4g\NavBackup$\robocopyLog.txt /np Then I create a Scheduled Task in Windows Server 2008. If I set up the task to use my Domain Admin account, great. But I'm trying to get it to run as a separate domain account for Scheduled Tasks. If I use that account, folders get created, but files aren't copied. I get the following error: 2011/02/17 15:41:48 ERROR 1307 (0x0000051B) Copying NTFS Security to Destination Directory D:\SQL Backup\folder\ This security ID may not be assigned as the owner of this object. I've verified my domain\Scheduled Tasks account has Full Control NTFS permissions on both the source and destination, and the Full Control Sharing on my hidden \server1\backup$ share. Just for giggles, I've tried adding the domain account to the local Administrators group on both servers. This works fine, but that seems like a lot of privileges just to copy files. Any ideas on what I'm missing?

    Read the article

  • How to calculate a RTOS task's time

    - by Adnan
    Hello all, I have written a code in c for Arm7 using RTOS. There are multiple tasks who's priority is set to same level. So the tasks executes on round-robin base. There is an exception that one task (Default) has set to lower priority then the other task in rtos. So that if no task is running, the default or lower priority task runs. Now i want to calculate the exact total timing (time duration) for that default task runs. Can any one give some idea what to do .... and how to do in code.. Regards Dani

    Read the article

  • How does Windows Task Scheduler in Win7 recognize a failed task?

    - by lakeman
    Hello, I am working with Windows 7 and I have an application that returns zero (0x0) when successful and one (0x1) on error situations. I have scheduled this app using Windows Task Scheduler. I have checked the option boxes "If the task fails, restart every" and "Attempt to restart up to:". I thought that a non-zero return code from the app would be enough to trigger the task to be restarted after the given interval. But nothing happens. Any ideas what could be the issue? I tried to google it but did not found anything relevant.

    Read the article

  • "Task Manager" addon for Firefox?

    - by eidylon
    Hello all... I'm wondering if there is an addon for Firefox that would basically replicate the performance monitoring of Task Manager in Windows - seeing memory and cpu used - but for all the tabs in your current Firefox session. I want to be able to see which tabs are taking up the most memory or hitting hardest on the CPU. Thanks in advance!

    Read the article

  • Task manager: Windows XP RAM usage doesn't add up

    - by David Oneill
    When using the task manager in Windows XP Pro, the amount of RAM that is listed as being used by the individual processes is not adding up to the total memory used (as listed by the total commit on the performance page). The total sum of all the RAM being used the the processes: 195604 K The amount in use as listed by performance page and the status bar: 280028 K 1) Why is this? 2) How do I reduce the amount of memory used?

    Read the article

  • Monitoring the Server load In Windows NT and triggering a scheduled task

    - by Gnanesh
    Hi, I am having the following problem. I am running a Windows NT server. I need to monitor the server utilization continuously (automated process) and need to know if the server load is high. And if it high I need to trigger a scheduled task. Can we write a VB script in order to do this? Can someone please help me? Kindly let me know in case you require more info on this Thanks

    Read the article

  • Why is the Task Manager Total Physical Memory not 2048 MB or 2 GB

    - by Dorothy
    I found 3 numbers for the Total Physical Memory: In the Task Manager under the Performance tab: 1978 MB In Computer Properties: 2 GB And running wmic computersystem get TotalPhysicalMemory /format:list in the command line: 2074554368 Bites Number 1 matches Number 3 except Number 1 is rounded. When I convert Number 3 to GB 2074554368 / 1024 / 1024 / 1024 I don't quite get 2 GB. I get 1.93207932 GB. Why does Number 1 and Number 3 not match Number 2?

    Read the article

  • How to print out information about Task Scheduler in powershell script?

    - by Jimboy
    I am trying to print out information from the Task Scheduler from the local computer in a powershell script so other users can print out this information as well and not have to access the Task Scheduler. I need the script to print out the name, status, triggers, next run time, last run time, last run result, author and created. I can print out the information about the name, next run time, and last run time, but the rest wont print out when i run the script. I have already got a little start on my script and got the fields down. $schedule = new-object -com("Schedule.Service") $schedule.connect() $tasks = $schedule.getfolder("\").gettasks(0) $tasks | select Name,Status,Triggers,NextRunTime,LastRunTime,LastRunResult,Author,Created | ft foreach ($t in $tasks) { foreach ($a in $t.Actions) { $a.Path } } Any help or suggestions would be appreciated.

    Read the article

  • Using SSIS Web Service Task with WCF

    - by Omri
    Hello, I am using SQL Server 2008 SSIS for importing data to the DB and .Net 3.5 SP1 for Creating the WCF service. In the import task I am trying to use the Web Service Task to report to a WCF service. At first I encountered a problem with the WCF WSDL, the Web Service task couldn't get their code generated from the metadata exposed by the WCF service. So I found a blog post at Christian Weyer's Blog talking just about that. Now after I can successfully load a WCF service to the Web Service Task and get the functions generated just fine from the WSDL I encountered another problem. I get an error from the SSIS package at runtime saying that "Method 'ProxyNamespace.MyService.GetData' not found." The full Error is: Error: 0xC002F304 at Web Service Task False, Web Service Task: An error occurred with the following error message: "Microsoft.SqlServer.Dts.Tasks.WebServiceTask.WebserviceTaskException: Could not execute the Web method. The error is: Method 'ProxyNamespace.MyService.GetData' not found.. at Microsoft.SqlServer.Dts.Tasks.WebServiceTask.WebMethodInvokerProxy.InvokeMethod(DTSWebMethodInfo methodInfo, String serviceName, Object connection) at Microsoft.SqlServer.Dts.Tasks.WebServiceTask.WebServiceTaskUtil.Invoke(DTSWebMethodInfo methodInfo, String serviceName, Object connection, VariableDispenser taskVariableDispenser) at Microsoft.SqlServer.Dts.Tasks.WebServiceTask.WebServiceTask.executeThread()". I know that the simple solution is going back to regular Web Service, but I really don't want to go there. Thanks, Omri.

    Read the article

  • How To Easily Send Emails From The Windows Task Scheduler

    - by Chris Hoffman
    The Windows Task Scheduler can automatically send email at a specific time or in response to a specific event, but its integrated email feature won’t work very well for most users. Instead of using the Task Scheduler’s email feature to send emails, you can use the SendEmail utility. It allows you to construct a single-line command that authenticates with an SMTP server and sends an email. How To Create a Customized Windows 7 Installation Disc With Integrated Updates How to Get Pro Features in Windows Home Versions with Third Party Tools HTG Explains: Is ReadyBoost Worth Using?

    Read the article

  • HTG Explains: How Windows Uses The Task Scheduler for System Tasks

    - by Chris Hoffman
    While you can use the Windows Task Scheduler to schedule your own automatic tasks, Windows also uses it behind the scenes to perform many system tasks – defragmenting your hard disks when you’re not using your computer, for example. You can even modify these system tasks to tweak Windows to your liking – for example, you can change how often Windows creates system restore points. Third-party programs also often use the Task Scheduler for their own tasks. HTG Explains: Why Do Hard Drives Show the Wrong Capacity in Windows? Java is Insecure and Awful, It’s Time to Disable It, and Here’s How What Are the Windows A: and B: Drives Used For?

    Read the article

  • Cocos2d: Using single timer/scheduler for multiple sprites

    - by Shailesh_ios
    want to know if is it possible to use single timer or scheduler method for multiple sprites ? Like I am now working on a game and there could be any number of sprites and i want to perform some actions on all of that sprites, So do I have to use as many timers or schedulers as sprites ? Or How can the job be done using only a single timer or scheduler ? What is I schedule a method and use it for, Say 10 sprites ? Will it affect the performance..?

    Read the article

  • Schedule Task run Without Being Logged in

    - by Webs
    I have seen similar threads here and on the net, but I think my question is slightly different than what I can find... I have a script that runs perfectly when logged in with a service account I created specifically to run this script. But when I schedule it to run it hangs when trying to launch IE (the first part of my script). Without being logged in with that account I can watch the processes with task manager and see the processes running, but the script never finishes. I want to be able to run this script without needing to be logged in at all or even have the account be locked all the times. Is this possible? Or do I have to have the user account logged in? Any help would be greatly appreciated!

    Read the article

< Previous Page | 3 4 5 6 7 8 9 10 11 12 13 14  | Next Page >