Search Results

Search found 4174 results on 167 pages for 'tasks'.

Page 11/167 | < Previous Page | 7 8 9 10 11 12 13 14 15 16 17 18  | Next Page >

  • Automatically delete old files from a specified folder?

    - by davr
    I want to set up an automatic task that will automatically delete files older than X days from a specific folder. I'd prefer to do it without having to install any 3rd party software, but I'll be ok if it's a very small and simple utility. I want this to force me to keep my files organized. I am setting my browser to download to a standard folder, and then with this script to automatically delete files older than a week, I will be forced to move & organize downloaded files I want to keep.

    Read the article

  • Outlook 2010 cheaper/free replacement

    - by Andrei Rinea
    I am very pleased with Outlook 2010 but since I can't use it anymore I have two big options : buy it or search for a decent cheaper/free replacement. What I need from that programa/suite is : POP/SMTP good management (I have Yahoo mail plus which uses SSL for SMTP and POP3 - not all clients support these) Task management RSS feed reading Calendar / scheduling This is for personal use. Any suggestions?

    Read the article

  • Running an Automator task at night

    - by Roberto Aloi
    I've just created an Automator workflow and I'm using crontab to execute it at night. The problem is that, after a while, the machine is going to sleep and a password is required (this is the intended behaviour). Unfortunately, Automator seems to be unable to perform the task when the password is required. It works like a charm if the "password required" dialog is not displayed (before the sleep). Any suggestion on how to solve this?

    Read the article

  • How to go about scheduling a task in windows 7 to change wireless connection

    - by Skindeep2366
    This may or not be something that can be done. I cannot find anything on the wireless connection manager built into windows 7 let alone methods for passing params into it. Problem is as follows: I have 2 wireless routers. One provides internet access, the other provides sole access to the local network. Every day at 4am the main system creates a backup in 2 locations. One is a External usb drive, the other is a location on the network. This is all cool if it is remembered to change over to the local network router before leaving. But if it is forgotten the roof will collapse, the walls will burn, and I will be... well you get the idea. Solution: there is already a custom event that fires a automated backup program at 4am everyday. I need someway to force the wireless network to use the correct connection at say 3:58am everyday. Any ideas????

    Read the article

  • it opens "open with" prompt whenever scheduled task run

    - by Shashwat Tripathi
    I am trying to run a .vbs file on every five minutes. I am trying to do this using windows task scheduler. In Actions tab - New Action, I select the file ("D:\Documents\FC3 Savegames\FC3.vbs") using open file dialog I have made all other setting properly. But whenever the task begin, It opens open with dialog every time. Once I choose Notepad to in open with dialog. Then Another dialog opens from Notepad saying Can not find D:\Documents\FC3.txt file. Do you want to create a new file with three buttons Yes, No and Cancel Help me what is wrong. I feel that white spaces in the file path causing the problem. Added later Well I just fixed this by setting path to shorthand ("D:\Documents\FC3Sav~1\FC3.vbs"). But it still opens "open with" dialog everytime. Now it has two main programs saying "Keep using Microsoft Windows Script Host" and Other Program. This dialog does not open when I run vbs file directly.

    Read the article

  • How to pass an argument to a Windows Scheduled Task with spaces in it

    - by Rodney
    I need to set up a Windows Scheduled Task. It accepts 1 parameter/argument which is a path and can contain spaces. My Scheduled task does not work - it "breaks" the parameter up at the first space. If I run it in the Command Prompt I can just wrap the argument in " " and it works fine, however, this does not work in the Scheduled Task UI. e.g. C:\Program Files\xyz\FTP File Transfer\FTPFileTransferTask.exe "C:\Program Files\xyz\The Interface\Folder Path" I have tried wrapping the argument with " " ' ' [ ] () and have tried filling in the spaces with %20, ~1 etc. with no luck. I know of one solution to make a bat file and use " " around my argument but I don't want to add more complexity. I tried it on Windows 7 and Windows 2008 Server and both failed. There seems to be no discussions on this?

    Read the article

  • powershell task scheduler or loop and sleep

    - by Paddy Carroll
    I have a job that needs to go off every minute or so, it loads a DLL written in C# that retrieves state for an SQL Server Mirror (Primary, Mirror and witness) for a number of databases; it allows us to poke DNS to show where the primary instances are. Please don't mention Clustering - We're not doing that. I can't be arsed to write a service, there simply isn't enough time do I Task Scheduler - every minute: Invoke a powershell script that loads the DLL does the business Task scheduler - At Startup : Invoke a similer powershell script that loads the DLL once but then loops and sleeps, refreshing the Object that the DLL exposes. Pros and cons?

    Read the article

  • Task scheduling Batch Files in Vista

    - by ArmoredCAvalry
    Wondering if there is some trick to scheduling a batch file to run in Vista. I have tried almost every setting/arg I can think of with no result other than an error, or the command window opening then instantly closing without executing the code. The batch files works fine when I double click to run.

    Read the article

  • Linux - How to run Firefox with AT command

    - by conualfy
    I try to run a specified command on a desired time. I found at for this, and it seems to work fine if I run: echo "ls -al / > /home/florin/test.txt" | at 4:21am But I want to run a different thing: /usr/bin/firefox -new-tab http://google.ro I tried adapting the first line with my action (running it in terminal opens a new Firefox tab with http://google.ro, so the command is correct), but with at, it does not work: echo "firefox -new-tab http://google.ro" | at 4:23am The task seems to be scheduled, but it does not run. When running the previous line I get the default reply from at: warning: commands will be executed using /bin/sh Should my Firefox command be differently run in sh? Is there a way to do my action with at, or some other way? Thanks a lot!

    Read the article

  • How to shedule time machine backup

    - by AntonAL
    Hi, the standard backup interval for Time Machine is 1 hour. In plist-file, i changed it to one day. But, i need more tweak - to launch Time Machine backup at the specified time of day. I prefer making backup, when my work day is completed. How can i customize Time Machine do to so ? Thanks!

    Read the article

  • Vista - perform scheduled actions only if screen is not locked

    - by Syntax Error
    Ok, here's the general idea of what I want to do. After a certain time, I would like the computer to nag me to go to sleep. Maybe every five minutes or so. But I don't want the messages to pop up if the screen is locked, because I leave it like that all night. Ideally I would like to be able to do more things like shut down running instances the web browser, or lock my user session if I ignore the notices for too long. But I'm happy with just popup messages if that's all I can do. So, how much of this is possible and where do I start? I'm not too well versed with task scheduler, and I'm assuming I'll use that to at least start whatever script I have to put together.

    Read the article

  • Way to wake up win-xp pc, without hibernate or network?

    - by crosenblum
    I have no need to wake up a remote pc, just the pc I use at work. I want to wake it up, by itself, without having to use hibernate, which I am not comfortable with, or have ever used. Then I can have the "System Scheduler" freeware that I use, to automatically do anti-virus updates, anti-malware updates, ccleaner /auto of course... It just would make my day's easier if it was already on by the time I arrived, I usually always turn my pc off when I am done with work, or if I didn't, I have a scheduled task to auto-shutdown pc 1 hour after my normal work hours... Without using hibernate, can i get my pc to wake up on it's own at a certain time each weekday?

    Read the article

  • Scheduled task giving last run result 0x80041324

    - by SteveC
    I've got a scheduled task set up in my Windows 7 machine which is meant to run a BAT file when I'm not around, i.e. the machine has been idle for 15 minutes. Does anyone know how to track down the cause of the error code ? Checked on MSDN and it says ... SCHED_E_TASK_ATTEMPTED 0x80041324 The Task Scheduler service attempted to run the task, but the task did not run due to one of the constraints in the task definition. And to confuse me even further, I've just noticed it has run while I'm at the machine with last result (0x0)

    Read the article

  • Running batch file through a service.

    - by wallz
    I'm trying to schedule a batch file to run through a third party application, however the output file doesn't get created in the directory. If I run the .BAT file from the command line, it works and the file gets created. Also using the Windows Schedule will also succeed. Basically, the 3rd party software will schedule the .BAT file and it shows success within the 3rd party user interface. The difference between running from the command prompt and the software, is that the software will use its Windows service to launch the batch. The 3rd party software will show success since it was able to successfully call the .BAT file to run, however it has no control of the other EXE's that's being called within the script. I'm able to run a simple .BAT file in the 3rd party software, for example a copy command. The .BAT I'm having problems with calls a compiled EXE which launches Excel to create a file to a location. The .bat file calls something.exe, which then calls Excel.exe: C:\something.exe -o D:\filename.xlsm C:\filename.xlsm refresh_pivot Do you think it's a permissions issue? I used Process Monitor to verify any Access Denied errors but everything seems to be working according to the trace. It worked on a non-64-bit OS, I'm currently using Win2008 64-bit.

    Read the article

  • .bat script doesn't work by using window scheduler

    - by user332640
    i created a .bat script to perform daily folder compression. it is working fine when i double click the .bat file. However, it doesnt work when i include it in window scheduler. Below is the script: rem **************************** rem ** To create back up file ** rem **************************** "C:\Program Files\WinZip\WINZIP32.EXE" -a -r -p "E:\Backup\Daily\sst.zip" "P:\SST\*.*" When i run it via window scheduler, the status is always "running" but nothing is generated. Can someone explain the situation?

    Read the article

  • Update Windows Defender schedule via command line or gpo?

    - by Zenox
    I'm looking to find a way to update some Windows Defender settings via command line, gpo etc. From my research it looks like windows defender creates a hidden scheduled task named 'MP Scheduled Scan', but modifying this task does not seem to make a difference as to what shows up in the Windows Defender UI. I have also done some process monitoring to see what data Windows Defender uses and I can see that it reads/writes to the 'HKLM:\SOFTWARE\Microsoft\Windows Defender\Scan' ScheduleDay key, but if I attempt to modify this key, I get an "Error Writing the new values contents" error message.

    Read the article

  • Calling nested batch files in Windows 2008 R2 task scheduler

    - by Nisha
    I am trying to schedule a batch file in Windows 2008 R2 Server. My batch file internally calls two other batch files. I am trying to schedule this on hourly basis. The schedular calls my batch file correctly but it does not run the other batch files which I am calling internally! Any idea why this is not working? When I run my batch file manually outside the scheduler... it works! Its only with the scheduler that it cannot run the other batch files. I have already tried the UCA option.

    Read the article

  • Black screen after scheduled resume from sleep

    - by macbirdie
    I have a problem with my two Windows 7 setups at home. Whenever a scheduled task wakes up the machines from sleep, a black screen with a mouse cursor appears. If I move the mouse or press any key, desktop appears. The biggest problem is that during that black screen phase the display, sometimes even the PC too, doesn't go to stand by after a set period of time in power settings. If I get the desktop to show up, standby functions work fine. Display goes blank after a few minutes and as soon as the task doesn't need the PC, it goes back to sleep. It's frustrating that this "feature" is wasting energy and keeps lighting up the pc in the middle of the night for me to find it that way after I wake up. I found a handful of threads on the intertubes about the issue, but there were no answers in any of them. It sometimes happens in my XP machine at work as well.

    Read the article

  • Agile: User Stories for Machine Learning Project?

    - by benjismith
    I've just finished up with a prototype implementation of a supervised learning algorithm, automatically assigning categorical tags to all the items in our company database (roughly 5 million items). The results look good, and I've been given the go-ahead to plan the production implementation project. I've done this kind of work before, so I know how the functional components of the software. I need a collection of web crawlers to fetch data. I need to extract features from the crawled documents. Those documents need to be segregated into a "training set" and a "classification set", and feature-vectors need to be extracted from each document. Those feature vectors are self-organized into clusters, and the clusters are passed through a series of rebalancing operations. Etc etc etc etc. So I put together a plan, with about 30 unique development/deployment tasks, each with time estimates. The first stage of development -- ignoring some advanced features that we'd like to have in the long-term, but aren't high enough priority to make it into the development schedule yet -- is slated for about two months worth of work. (Keep in mind that I already have a working prototype, so the final implementation is significantly simpler than if the project was starting from scratch.) My manager said the plan looked good to him, but he asked if I could reorganize the tasks into user stories, for a few reasons: (1) our project management software is totally organized around user stories; (2) all of our scheduling is based on fitting entire user stories into sprints, rather than individually scheduling tasks; (3) other teams -- like the web developers -- have made great use of agile methodologies, and they've benefited from modelling all the software features as user stories. So I created a user story at the top level of the project: As a user of the system, I want to search for items by category, so that I can easily find the most relevant items within a huge, complex database. Or maybe a better top-level story for this feature would be: As a content editor, I want to automatically create categorical designations for the items in our database, so that customers can easily find high-value data within our huge, complex database. But that's not the real problem. The tricky part, for me, is figuring out how to create subordinate user stories for the rest of the machine learning architecture. Case in point... I know that the algorithm requires two major architectural subdivisions: (A) training, and (B) classification. And I know that the training portion of the architecture requires construction of a cluster-space. All the Agile Development literature I've read seems to indicate that a user story should be the "smallest possible implementation that provides any business value". And that makes a lot of sense when designing a piece of end-user software. Start small, and then incrementally add value when users demand additional functionality. But a cluster-space, in and of itself, provides zero business value. Nor does a crawler, or a feature-extractor. There's no business value (not for the end-user, or for any of the roles internal to the company) in a partial system. A trained cluster-space is only possible with the crawler and feature extractor, and only relevant if we also develop an accompanying classifier. I suppose it would be possible to create user stories where the subordinate components of the system act as the users in the stories: As a supervised-learning cluster-space construction routine, I want to consume data from a feature extractor, so that I can exist. But that seems really weird. What benefit does it provide me as the developer (or our users, or any other stakeholders, for that matter) to model my user stories like that? Although the main story can be easily divided along architectural-component boundaries (crawler, trainer, classifier, etc), I can't think of any useful decomposition from a user's perspective. What do you guys think? How do you plan Agile user stories for sophisticated, indivisible, non-user-facing components?

    Read the article

< Previous Page | 7 8 9 10 11 12 13 14 15 16 17 18  | Next Page >