Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 677/1407 | < Previous Page | 673 674 675 676 677 678 679 680 681 682 683 684  | Next Page >

  • Home entertainment karaoke system

    - by Mehper C. Palavuzlar
    Here is what I have: 40" Sony Bravia LCD TV, 5+1 speaker system, lots of original Karaoke CDs, and of course, a microphone. To set up a karaoke entertainment system, what kind of hardware do I need? Are there any standalone karaoke players out there? I hope my only option is not having to connect my laptop to TV. I already have karaoke software on my laptop but I wanna step up to a higher level without the help of a computer.

    Read the article

  • Command line FTPS ?

    - by user32810
    I need to write a batch file to auto upload a backup every day. I'm restricted to windows, can anyone suggest any free software to do this? I was looking at Filezilla, the command line interface doesn't let you auto upload files and I need to buy a license for CuteFTP. Thanks, Teja

    Read the article

  • Error 1720 with Virtuozzo Trying to Install Containers 4.6

    - by Kort Pleco
    So, somehow my virtuozzo installation was corrupted, and it didn't fully uninstall. I'm trying to reinstall Virtuozzo Containers 4.6 and it fails with this error: Error 1720.There is a problem with this Windows Installer package. A script required for this install to complete could not be run. Contact your support personnel or package vendor. Custom action SetFolders_x64 script error -2147024894, WshShell.RegRead: Invalid root in registry key "HKLM\SOFTWARE\SWSoft\Virtuozzo\VZINSTALL". Line 7, Column 2 Help?

    Read the article

  • Disable header/footer printing from Chrome

    - by Toby
    The Chrome browser doesn't have any settings for changing or disabling header and footer data that gets printed when you go File Print. Apparently this is being developed but until it is does anyone know how to disable this in Windows XP. Chrome on the Mac and Ubuntu doesn't do it so I assume it is down to a system setting that by default doesn't print header/footer information unless software over-rides this?

    Read the article

  • Connect a PC to MAC OSX Server

    - by Paul Sheldrake
    I'm trying to connect to a server at work which is run on a Mac but I have a PC (windows 7) at home. I have path to connect in the format of afp://server.com/files. Is there a client that I need to install on my PC that I can use to login? Thanks, Paul

    Read the article

  • Linux installation analysis

    - by blunders
    "Ending company IT Admin relationship" has a good checklist for taking over an existing IT system, but I'm wondering as it relates to Linux: What is the most effective way to assess the scope of existing custom configurations, installs, scripts, etc done? Is there any software that will check if the kernel, system files, etc mirror the default files for the version installed? At this point I don't know what distro of Linux the server (though using Netcraft I do know the server appears to be Linux) -- so it's possible without knowing that information that this would be a hard question to answer.

    Read the article

  • How to insert registry entries from a .reg file into 32-bit registry, on 64-bit Windows

    - by garyo
    In 64-bit windows (Vista/7), there's HKLM/Software/Wow6432Node where all the 32-bit registry stuff is. If I have a .reg file with some keys in it, how can I tell regedit to import it into the 32-bit registry (under Wow6432Node) rather than the 64-bit registry? Even if I put the Wow6432 path into the registry keys in the .reg file, Windows "cleverly" ignores them and puts them in the main 64-bit registry.

    Read the article

  • MySQL and PostgreSQL on the same hardware

    - by Kamil Kisiel
    We recently bought some new hardware for a database server which we were intending to dedicate to the operation of PostgreSQL. However now we have the requirement to also run MySQL as some software we want to use only supports that database. Since the storage on this machine is the most suitable for hosting a DB, and we don't currently have the budget for more hardware,we're thinking of running both of them on the same server. Are there any caveats or best practices we should be aware of?

    Read the article

  • Network Logon Issues with Group Policy and Network

    - by bobloki
    I am gravely in need of your help and assistance. We have a problem with our logon and startup to our Windows 7 Enterprise system. We have more than 3000 Windows Desktops situated in roughly 20+ buildings around campus. Almost every computer on campus has the problem that I will be describing. I have spent over one month peering over etl files from Windows Performance Analyzer (A great product) and hundreds of thousands of event logs. I come to you today humbled that I could not figure this out. The problem as simply put our logon times are extremely long. An average first time logon is roughly 2-10 minutes depending on the software installed. All computers are Windows 7, the oldest computers being 5 years old. Startup times on various computers range from good (1-2 minutes) to very bad (5-60). Our second time logons range from 30 seconds to 4 minutes. We have a gigabit connection between each computer on the network. We have 5 domain controllers which also double as our DNS servers. Initial testing led us to believe that this was a software problem. So I spent a few days testing machines only to find inconsistent results from the etl files from xperfview. Each subset of computers on campus had a different subset of software issues, none seeming to interfere with logon just startup. So I started looking at our group policy and located some very interesting event ID’s. Group Policy 1129: The processing of Group Policy failed because of lack of network connectivity to a domain controller. Group Policy 1055: The processing of Group Policy failed. Windows could not resolve the computer name. This could be caused by one of more of the following: a) Name Resolution failure on the current domain controller. b) Active Directory Replication Latency (an account created on another domain controller has not replicated to the current domain controller). NETLOGON 5719 : This computer was not able to set up a secure session with a domain controller in domain OURDOMAIN due to the following: There are currently no logon servers available to service the logon request. This may lead to authentication problems. Make sure that this computer is connected to the network. If the problem persists, please contact your domain administrator. E1kexpress 27: Intel®82567LM-3 Gigabit Network Connection – Network link is disconnected. NetBT 4300 – The driver could not be created. WMI 10 - Event filter with query "SELECT * FROM __InstanceModificationEvent WITHIN 60 WHERE TargetInstance ISA "Win32_Processor" AND TargetInstance.LoadPercentage 99" could not be reactivated in namespace "//./root/CIMV2" because of error 0x80041003. Events cannot be delivered through this filter until the problem is corrected. More or less with timestamps it becomes apparent that the network maybe the issue. 1:25:57 - Group Policy is trying to discover the domain controller information 1:25:57 - The network link has been disconnected 1:25:58 - The processing of Group Policy failed because of lack of network connectivity to a domain controller. This may be a transient condition. A success message would be generated once the machine gets connected to the domain controller and Group Policy has successfully processed. If you do not see a success message for several hours, then contact your administrator. 1:25:58 - Making LDAP calls to connect and bind to active directory. DC1.ourdomain.edu 1:25:58 - Call failed after 0 milliseconds. 1:25:58 - Forcing rediscovery of domain controller details. 1:25:58 - Group policy failed to discover the domain controller in 1030 milliseconds 1:25:58 - Periodic policy processing failed for computer OURDOMAIN\%name%$ in 1 seconds. 1:25:59 - A network link has been established at 1Gbps at full duplex 1:26:00 - The network link has been disconnected 1:26:02 - NtpClient was unable to set a domain peer to use as a time source because of discovery error. NtpClient will try again in 3473457 minutes and DOUBLE THE REATTEMPT INTERVAL thereafter. 1:26:05 - A network link has been established at 1Gbps at full duplex 1:26:08 - Name resolution for the name %Name% timed out after none of the configured DNS servers responded. 1:26:10 – The TCP/IP NetBIOS Helper service entered the running state. 1:26:11 - The time provider NtpClient is currently receiving valid time data at dc4.ourdomain.edu 1:26:14 – User Logon Notification for Customer Experience Improvement Program 1:26:15 - Group Policy received the notification Logon from Winlogon for session 1. 1:26:15 - Making LDAP calls to connect and bind to Active Directory. dc4.ourdomain.edu 1:26:18 - The LDAP call to connect and bind to Active Directory completed. dc4. ourdomain.edu. The call completed in 2309 milliseconds. 1:26:18 - Group Policy successfully discovered the Domain Controller in 2918 milliseconds. 1:26:18 - Computer details: Computer role : 2 Network name : (Blank) 1:26:18 - The LDAP call to connect and bind to Active Directory completed. dc4.ourdomain.edu. The call completed in 2309 milliseconds. 1:26:18 - Group Policy successfully discovered the Domain Controller in 2918 milliseconds. 1:26:19 - The WinHTTP Web Proxy Auto-Discovery Service service entered the running state. 1:26:46 - The Network Connections service entered the running state. 1:27:10 – Retrieved account information 1:27:10 – The system call to get account information completed. 1:27:10 - Starting policy processing due to network state change for computer OURDOMAIN\%name%$ 1:27:10 – Network state change detected 1:27:10 - Making system call to get account information. 1:27:11 - Making LDAP calls to connect and bind to Active Directory. dc4.ourdomain.edu 1:27:13 - Computer details: Computer role : 2 Network name : ourdomain.edu (Now not blank) 1:27:13 - Group Policy successfully discovered the Domain Controller in 2886 milliseconds. 1:27:13 - The LDAP call to connect and bind to Active Directory completed. dc4.ourdomain.edu The call completed in 2371 milliseconds. 1:27:15 - Estimated network bandwidth on one of the connections: 0 kbps. 1:27:15 - Estimated network bandwidth on one of the connections: 8545 kbps. 1:27:15 - A fast link was detected. The Estimated bandwidth is 8545 kbps. The slow link threshold is 500 kbps. 1:27:17 – Powershell - Engine state is changed from Available to Stopped. 1:27:20 - Completed Group Policy Local Users and Groups Extension Processing in 4539 milliseconds. 1:27:25 - Completed Group Policy Scheduled Tasks Extension Processing in 5210 milliseconds. 1:27:27 - Completed Group Policy Registry Extension Processing in 1529 milliseconds. 1:27:27 - Completed policy processing due to network state change for computer OURDOMAIN\%name%$ in 16 seconds. 1:27:27 – The Group Policy settings for the computer were processed successfully. There were no changes detected since the last successful processing of Group Policy. Any help would be appreciated. Please ask for any relevant information and it will be provided as soon as possible.

    Read the article

  • How to get the output of a php script executed by a piped mail?

    - by xun2
    I've configured an email address to pipe (forward) all emails to /path/to/script.php I thought I'll receive the output of the script as an email reply but it doesn't work. How can I get the output of the script and send a reply email with the output as the email content? (*) I know I can use mail() inside the script but I don't have permissions to edit the script, and I can't copy the script because it's being updated from time to time.

    Read the article

  • Which file system to use for portable hard drive shared among different operating systems?

    - by Jonathon Watney
    Something similar has been asked already but my criteria is a little different. I need to share a portable hard drive (USB/Firewire) between Mac OSX, Linux and Windows XP systems where the files being shared are sometimes 4GB. Is there a file system that is available out of the box on all these operating systems that support this and allows read/write access? If not, what's the next best solution in terms of installing additional software on these operating systems?

    Read the article

  • BAD DC transfering FSMO Roles to ADC

    - by Suleman
    I have a DC (FQDN:server.icmcpk.local) and an ADC (FQDN:file-server.icmcpk.local). Recently my DC is facing a bad sector problem so I changed the Operation Masters to file-server for all five roles. but when ever i turn off the OLD DC the file-server also stops wroking with AD and GPMC further i m also unable to join any other computer to this domain. For Test purpose i also added a new ADC (FQDN:wds-server.icmcpk.local) but no succes with the old DC off i had to turn the old DC on and then joined it. I m attaching the Dcdiags for all three servers. Kindly help me so that i b able to reinstall new HDD and it can go online again. --------------------------------------- Server --------------------------------------- C:\Program Files\Support Tools>dcdiag Domain Controller Diagnosis Performing initial setup: Done gathering initial info. Doing initial required tests Testing server: Default-First-Site-Name\SERVER Starting test: Connectivity ......................... SERVER passed test Connectivity Doing primary tests Testing server: Default-First-Site-Name\SERVER Starting test: Replications [Replications Check,SERVER] A recent replication attempt failed: From FILE-SERVER to SERVER Naming Context: DC=ForestDnsZones,DC=icmcpk,DC=local The replication generated an error (1908): Could not find the domain controller for this domain. The failure occurred at 2012-05-04 14:07:13. The last success occurred at 2012-05-04 13:48:39. 1 failures have occurred since the last success. Kerberos Error. A KDC was not found to authenticate the call. Check that sufficient domain controllers are available. [Replications Check,SERVER] A recent replication attempt failed: From WDS-SERVER to SERVER Naming Context: DC=ForestDnsZones,DC=icmcpk,DC=local The replication generated an error (1908): Could not find the domain controller for this domain. The failure occurred at 2012-05-04 14:07:13. The last success occurred at 2012-05-04 13:48:39. 1 failures have occurred since the last success. Kerberos Error. A KDC was not found to authenticate the call. Check that sufficient domain controllers are available. [Replications Check,SERVER] A recent replication attempt failed: From FILE-SERVER to SERVER Naming Context: DC=DomainDnsZones,DC=icmcpk,DC=local The replication generated an error (1908): Could not find the domain controller for this domain. The failure occurred at 2012-05-04 14:07:13. The last success occurred at 2012-05-04 13:48:39. 1 failures have occurred since the last success. Kerberos Error. A KDC was not found to authenticate the call. Check that sufficient domain controllers are available. [Replications Check,SERVER] A recent replication attempt failed: From WDS-SERVER to SERVER Naming Context: DC=DomainDnsZones,DC=icmcpk,DC=local The replication generated an error (1908): Could not find the domain controller for this domain. The failure occurred at 2012-05-04 14:07:13. The last success occurred at 2012-05-04 13:48:39. 1 failures have occurred since the last success. Kerberos Error. A KDC was not found to authenticate the call. Check that sufficient domain controllers are available. [Replications Check,SERVER] A recent replication attempt failed: From FILE-SERVER to SERVER Naming Context: CN=Schema,CN=Configuration,DC=icmcpk,DC=local The replication generated an error (1908): Could not find the domain controller for this domain. The failure occurred at 2012-05-04 14:07:13. The last success occurred at 2012-05-04 13:48:39. 1 failures have occurred since the last success. Kerberos Error. A KDC was not found to authenticate the call. Check that sufficient domain controllers are available. [Replications Check,SERVER] A recent replication attempt failed: From WDS-SERVER to SERVER Naming Context: CN=Schema,CN=Configuration,DC=icmcpk,DC=local The replication generated an error (1908): Could not find the domain controller for this domain. The failure occurred at 2012-05-04 14:07:13. The last success occurred at 2012-05-04 13:48:39. 1 failures have occurred since the last success. Kerberos Error. A KDC was not found to authenticate the call. Check that sufficient domain controllers are available. [Replications Check,SERVER] A recent replication attempt failed: From WDS-SERVER to SERVER Naming Context: DC=icmcpk,DC=local The replication generated an error (1908): Could not find the domain controller for this domain. The failure occurred at 2012-05-04 14:07:13. The last success occurred at 2012-05-04 13:48:39. 1 failures have occurred since the last success. Kerberos Error. A KDC was not found to authenticate the call. Check that sufficient domain controllers are available. ......................... SERVER passed test Replications Starting test: NCSecDesc ......................... SERVER passed test NCSecDesc Starting test: NetLogons ......................... SERVER passed test NetLogons Starting test: Advertising ......................... SERVER passed test Advertising Starting test: KnowsOfRoleHolders ......................... SERVER passed test KnowsOfRoleHolders Starting test: RidManager ......................... SERVER passed test RidManager Starting test: MachineAccount ......................... SERVER passed test MachineAccount Starting test: Services ......................... SERVER passed test Services Starting test: ObjectsReplicated ......................... SERVER passed test ObjectsReplicated Starting test: frssysvol ......................... SERVER passed test frssysvol Starting test: frsevent There are warning or error events within the last 24 hours after the SYSVOL has been shared. Failing SYSVOL replication problems may cause Group Policy problems. ......................... SERVER failed test frsevent Starting test: kccevent ......................... SERVER passed test kccevent Starting test: systemlog An Error Event occured. EventID: 0x80001778 Time Generated: 05/04/2012 14:05:39 Event String: The previous system shutdown at 1:26:31 PM on An Error Event occured. EventID: 0x825A0011 Time Generated: 05/04/2012 14:07:45 (Event String could not be retrieved) An Error Event occured. EventID: 0x00000457 Time Generated: 05/04/2012 14:13:40 (Event String could not be retrieved) An Error Event occured. EventID: 0x00000457 Time Generated: 05/04/2012 14:14:25 (Event String could not be retrieved) An Error Event occured. EventID: 0x00000457 Time Generated: 05/04/2012 14:14:25 (Event String could not be retrieved) An Error Event occured. EventID: 0x00000457 Time Generated: 05/04/2012 14:14:38 (Event String could not be retrieved) An Error Event occured. EventID: 0xC1010020 Time Generated: 05/04/2012 14:16:14 Event String: Dependent Assembly Microsoft.VC80.MFCLOC could An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:16:14 Event String: Resolve Partial Assembly failed for An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:16:14 Event String: Generate Activation Context failed for An Error Event occured. EventID: 0xC1010020 Time Generated: 05/04/2012 14:16:14 Event String: Dependent Assembly Microsoft.VC80.MFCLOC could An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:16:14 Event String: Resolve Partial Assembly failed for An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:16:14 Event String: Generate Activation Context failed for An Error Event occured. EventID: 0x825A0011 Time Generated: 05/04/2012 14:22:57 (Event String could not be retrieved) An Error Event occured. EventID: 0xC1010020 Time Generated: 05/04/2012 14:22:59 Event String: Dependent Assembly Microsoft.VC80.MFCLOC could An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:22:59 Event String: Resolve Partial Assembly failed for An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:22:59 Event String: Generate Activation Context failed for An Error Event occured. EventID: 0xC1010020 Time Generated: 05/04/2012 14:22:59 Event String: Dependent Assembly Microsoft.VC80.MFCLOC could An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:22:59 Event String: Resolve Partial Assembly failed for An Error Event occured. EventID: 0xC101003B Time Generated: 05/04/2012 14:22:59 Event String: Generate Activation Context failed for ......................... SERVER failed test systemlog Starting test: VerifyReferences ......................... SERVER passed test VerifyReferences Running partition tests on : ForestDnsZones Starting test: CrossRefValidation ......................... ForestDnsZones passed test CrossRefValidation Starting test: CheckSDRefDom ......................... ForestDnsZones passed test CheckSDRefDom Running partition tests on : DomainDnsZones Starting test: CrossRefValidation ......................... DomainDnsZones passed test CrossRefValidation Starting test: CheckSDRefDom ......................... DomainDnsZones passed test CheckSDRefDom Running partition tests on : Schema Starting test: CrossRefValidation ......................... Schema passed test CrossRefValidation Starting test: CheckSDRefDom ......................... Schema passed test CheckSDRefDom Running partition tests on : Configuration Starting test: CrossRefValidation ......................... Configuration passed test CrossRefValidation Starting test: CheckSDRefDom ......................... Configuration passed test CheckSDRefDom Running partition tests on : icmcpk Starting test: CrossRefValidation ......................... icmcpk passed test CrossRefValidation Starting test: CheckSDRefDom ......................... icmcpk passed test CheckSDRefDom Running enterprise tests on : icmcpk.local Starting test: Intersite ......................... icmcpk.local passed test Intersite Starting test: FsmoCheck ......................... icmcpk.local passed test FsmoCheck ---------------------- File-Server ---------------------- C:\Users\Administrator.ICMCPK>dcdiag Directory Server Diagnosis Performing initial setup: Trying to find home server... Home Server = FILE-SERVER * Identified AD Forest. Done gathering initial info. Doing initial required tests Testing server: Default-First-Site-Name\FILE-SERVER Starting test: Connectivity ......................... FILE-SERVER passed test Connectivity Doing primary tests Testing server: Default-First-Site-Name\FILE-SERVER Starting test: Advertising Warning: DsGetDcName returned information for \\Server.icmcpk.local, when we were trying to reach FILE-SERVER. SERVER IS NOT RESPONDING or IS NOT CONSIDERED SUITABLE. ......................... FILE-SERVER failed test Advertising Starting test: FrsEvent ......................... FILE-SERVER passed test FrsEvent Starting test: DFSREvent ......................... FILE-SERVER passed test DFSREvent Starting test: SysVolCheck ......................... FILE-SERVER passed test SysVolCheck Starting test: KccEvent ......................... FILE-SERVER passed test KccEvent Starting test: KnowsOfRoleHolders ......................... FILE-SERVER passed test KnowsOfRoleHolders Starting test: MachineAccount ......................... FILE-SERVER passed test MachineAccount Starting test: NCSecDesc Error NT AUTHORITY\ENTERPRISE DOMAIN CONTROLLERS doesn't have Replicating Directory Changes In Filtered Set access rights for the naming context: DC=ForestDnsZones,DC=icmcpk,DC=local Error NT AUTHORITY\ENTERPRISE DOMAIN CONTROLLERS doesn't have Replicating Directory Changes In Filtered Set access rights for the naming context: DC=DomainDnsZones,DC=icmcpk,DC=local ......................... FILE-SERVER failed test NCSecDesc Starting test: NetLogons Unable to connect to the NETLOGON share! (\\FILE-SERVER\netlogon) [FILE-SERVER] An net use or LsaPolicy operation failed with error 67, The network name cannot be found.. ......................... FILE-SERVER failed test NetLogons Starting test: ObjectsReplicated ......................... FILE-SERVER passed test ObjectsReplicated Starting test: Replications ......................... FILE-SERVER passed test Replications Starting test: RidManager ......................... FILE-SERVER passed test RidManager Starting test: Services ......................... FILE-SERVER passed test Services Starting test: SystemLog An Error Event occurred. EventID: 0x00000469 Time Generated: 05/04/2012 14:01:10 Event String: The processing of Group Policy failed because of lack of network con nectivity to a domain controller. This may be a transient condition. A success m essage would be generated once the machine gets connected to the domain controll er and Group Policy has succesfully processed. If you do not see a success messa ge for several hours, then contact your administrator. An Warning Event occurred. EventID: 0x8000A001 Time Generated: 05/04/2012 14:07:11 Event String: The Security System could not establish a secured connection with th e server ldap/icmcpk.local/[email protected]. No authentication protocol was available. An Warning Event occurred. EventID: 0x00000BBC Time Generated: 05/04/2012 14:30:34 Event String: Windows Defender Real-Time Protection agent has detected changes. Mi crosoft recommends you analyze the software that made these changes for potentia l risks. You can use information about how these programs operate to choose whet her to allow them to run or remove them from your computer. Allow changes only if you trust the program or the software publisher. Windows Defender can't undo changes that you allow. An Warning Event occurred. EventID: 0x00000BBC Time Generated: 05/04/2012 14:30:36 Event String: Windows Defender Real-Time Protection agent has detected changes. Mi crosoft recommends you analyze the software that made these changes for potentia l risks. You can use information about how these programs operate to choose whet her to allow them to run or remove them from your computer. Allow changes only if you trust the program or the software publisher. Windows Defender can't undo changes that you allow. ......................... FILE-SERVER failed test SystemLog Starting test: VerifyReferences ......................... FILE-SERVER passed test VerifyReferences Running partition tests on : ForestDnsZones Starting test: CheckSDRefDom ......................... ForestDnsZones passed test CheckSDRefDom Starting test: CrossRefValidation ......................... ForestDnsZones passed test CrossRefValidation Running partition tests on : DomainDnsZones Starting test: CheckSDRefDom ......................... DomainDnsZones passed test CheckSDRefDom Starting test: CrossRefValidation ......................... DomainDnsZones passed test CrossRefValidation Running partition tests on : Schema Starting test: CheckSDRefDom ......................... Schema passed test CheckSDRefDom Starting test: CrossRefValidation ......................... Schema passed test CrossRefValidation Running partition tests on : Configuration Starting test: CheckSDRefDom ......................... Configuration passed test CheckSDRefDom Starting test: CrossRefValidation ......................... Configuration passed test CrossRefValidation Running partition tests on : icmcpk Starting test: CheckSDRefDom ......................... icmcpk passed test CheckSDRefDom Starting test: CrossRefValidation ......................... icmcpk passed test CrossRefValidation Running enterprise tests on : icmcpk.local Starting test: LocatorCheck ......................... icmcpk.local passed test LocatorCheck Starting test: Intersite ......................... icmcpk.local passed test Intersite --------------------- WDS-Server --------------------- C:\Users\Administrator.ICMCPK>dcdiag Directory Server Diagnosis Performing initial setup: Trying to find home server... Home Server = WDS-SERVER * Identified AD Forest. Done gathering initial info. Doing initial required tests Testing server: Default-First-Site-Name\WDS-SERVER Starting test: Connectivity ......................... WDS-SERVER passed test Connectivity Doing primary tests Testing server: Default-First-Site-Name\WDS-SERVER Starting test: Advertising Warning: DsGetDcName returned information for \\Server.icmcpk.local, when we were trying to reach WDS-SERVER. SERVER IS NOT RESPONDING or IS NOT CONSIDERED SUITABLE. ......................... WDS-SERVER failed test Advertising Starting test: FrsEvent There are warning or error events within the last 24 hours after the SYSVOL has been shared. Failing SYSVOL replication problems may cause Group Policy problems. ......................... WDS-SERVER passed test FrsEvent Starting test: DFSREvent ......................... WDS-SERVER passed test DFSREvent Starting test: SysVolCheck ......................... WDS-SERVER passed test SysVolCheck Starting test: KccEvent ......................... WDS-SERVER passed test KccEvent Starting test: KnowsOfRoleHolders ......................... WDS-SERVER passed test KnowsOfRoleHolders Starting test: MachineAccount ......................... WDS-SERVER passed test MachineAccount Starting test: NCSecDesc Error NT AUTHORITY\ENTERPRISE DOMAIN CONTROLLERS doesn't have Replicating Directory Changes In Filtered Set access rights for the naming context: DC=ForestDnsZones,DC=icmcpk,DC=local Error NT AUTHORITY\ENTERPRISE DOMAIN CONTROLLERS doesn't have Replicating Directory Changes In Filtered Set access rights for the naming context: DC=DomainDnsZones,DC=icmcpk,DC=local ......................... WDS-SERVER failed test NCSecDesc Starting test: NetLogons Unable to connect to the NETLOGON share! (\\WDS-SERVER\netlogon) [WDS-SERVER] An net use or LsaPolicy operation failed with error 67, The network name cannot be found.. ......................... WDS-SERVER failed test NetLogons Starting test: ObjectsReplicated ......................... WDS-SERVER passed test ObjectsReplicated Starting test: Replications ......................... WDS-SERVER passed test Replications Starting test: RidManager ......................... WDS-SERVER passed test RidManager Starting test: Services ......................... WDS-SERVER passed test Services Starting test: SystemLog An Error Event occurred. EventID: 0x0000041E Time Generated: 05/04/2012 14:02:55 Event String: The processing of Group Policy failed. Windows could not obtain the name of a domain controller. This could be caused by a name resolution failure. Verify your Domain Name Sysytem (DNS) is configured and working correctly. An Error Event occurred. EventID: 0x0000041E Time Generated: 05/04/2012 14:08:33 Event String: The processing of Group Policy failed. Windows could not obtain the name of a domain controller. This could be caused by a name resolution failure. Verify your Domain Name Sysytem (DNS) is configured and working correctly. ......................... WDS-SERVER failed test SystemLog Starting test: VerifyReferences ......................... WDS-SERVER passed test VerifyReferences Running partition tests on : ForestDnsZones Starting test: CheckSDRefDom ......................... ForestDnsZones passed test CheckSDRefDom Starting test: CrossRefValidation ......................... ForestDnsZones passed test CrossRefValidation Running partition tests on : DomainDnsZones Starting test: CheckSDRefDom ......................... DomainDnsZones passed test CheckSDRefDom Starting test: CrossRefValidation ......................... DomainDnsZones passed test CrossRefValidation Running partition tests on : Schema Starting test: CheckSDRefDom ......................... Schema passed test CheckSDRefDom Starting test: CrossRefValidation ......................... Schema passed test CrossRefValidation Running partition tests on : Configuration Starting test: CheckSDRefDom ......................... Configuration passed test CheckSDRefDom Starting test: CrossRefValidation ......................... Configuration passed test CrossRefValidation Running partition tests on : icmcpk Starting test: CheckSDRefDom ......................... icmcpk passed test CheckSDRefDom Starting test: CrossRefValidation ......................... icmcpk passed test CrossRefValidation Running enterprise tests on : icmcpk.local Starting test: LocatorCheck ......................... icmcpk.local passed test LocatorCheck Starting test: Intersite ......................... icmcpk.local passed test Intersite

    Read the article

  • How to connect Home Folder using PowerShell

    - by Maximus
    I tried to create user using New-QADUser cmdlet. I know this cmdlet has -HomeDrive switch. But the problem is that cmdlet is just applying path string to user's account and not creating user's home directory on the fileserver like it happens when you use ADUC console. How can I do it corerctly?

    Read the article

  • Microsoft DNS :: Review Traffic Data?

    - by BSI Support
    I have primary and secondary (public) DNS servers running Microsoft DNS. Windows 2003. Would like any suggestions on software for DNS log analysis. At the moment, I'm curious to see which domains are being requested, in an effort to clean-up old Registrar-based name server settings (which I do not have access to change, myself.) Any help would be appreciated.

    Read the article

  • Ubuntu server has slow performance

    - by Rich
    I have a custom built Ubuntu 11.04 server with a 6 disk software RAID 10 primary drive. On it I'm primarily running a PostgreSQL and a few other utilities that stream data from the web. I often find after a few hours of uptime the server starts to lag with all kinds of processes. For example, it may take 10-15 seconds after log-in to get a shell prompt. It might take 5-10 seconds for top to come up. An ls might take a second or two. When I look at top there is almost no CPU usage. There's a fair amount of memory used by the PostgreSQL server but not enough to bleed into swap. I have no idea where to go from here, other than to suspect the RAID10 (I've only ever had software RAID 1's before). Edit: Output from top: top - 11:56:03 up 1:46, 3 users, load average: 0.89, 0.73, 0.72 Tasks: 119 total, 1 running, 118 sleeping, 0 stopped, 0 zombie Cpu(s): 0.2%us, 0.0%sy, 0.0%ni, 93.5%id, 6.2%wa, 0.0%hi, 0.0%si, 0.0%st Mem: 16325596k total, 3478248k used, 12847348k free, 20880k buffers Swap: 19534176k total, 0k used, 19534176k free, 3041992k cached PID USER PR NI VIRT RES SHR S %CPU %MEM TIME+ COMMAND 1747 woodsp 20 0 109m 10m 4888 S 1 0.1 0:42.70 python 357 root 20 0 0 0 0 S 0 0.0 0:00.40 jbd2/sda3-8 1 root 20 0 24324 2284 1344 S 0 0.0 0:00.84 init 2 root 20 0 0 0 0 S 0 0.0 0:00.00 kthreadd 3 root 20 0 0 0 0 S 0 0.0 0:00.24 ksoftirqd/0 6 root RT 0 0 0 0 S 0 0.0 0:00.00 migration/0 7 root RT 0 0 0 0 S 0 0.0 0:00.01 watchdog/0 8 root RT 0 0 0 0 S 0 0.0 0:00.00 migration/1 10 root 20 0 0 0 0 S 0 0.0 0:00.02 ksoftirqd/1 12 root RT 0 0 0 0 S 0 0.0 0:00.01 watchdog/1 13 root RT 0 0 0 0 S 0 0.0 0:00.00 migration/2 14 root 20 0 0 0 0 S 0 0.0 0:00.00 kworker/2:0 15 root 20 0 0 0 0 S 0 0.0 0:00.00 ksoftirqd/2 16 root RT 0 0 0 0 S 0 0.0 0:00.01 watchdog/2 17 root RT 0 0 0 0 S 0 0.0 0:00.00 migration/3 18 root 20 0 0 0 0 S 0 0.0 0:00.00 kworker/3:0 19 root 20 0 0 0 0 S 0 0.0 0:00.02 ksoftirqd/3 20 root RT 0 0 0 0 S 0 0.0 0:00.01 watchdog/3 21 root 0 -20 0 0 0 S 0 0.0 0:00.00 cpuset 22 root 0 -20 0 0 0 S 0 0.0 0:00.00 khelper 23 root 20 0 0 0 0 S 0 0.0 0:00.00 kdevtmpfs 24 root 0 -20 0 0 0 S 0 0.0 0:00.00 netns 26 root 20 0 0 0 0 S 0 0.0 0:00.00 sync_supers df -h rpsharp@ncp-skookum:~$ df -h Filesystem Size Used Avail Use% Mounted on /dev/sda3 1.8T 549G 1.2T 32% / udev 7.8G 4.0K 7.8G 1% /dev tmpfs 3.2G 492K 3.2G 1% /run none 5.0M 0 5.0M 0% /run/lock none 7.8G 0 7.8G 0% /run/shm /dev/sda2 952M 128K 952M 1% /boot/efi /dev/md0 5.5T 562G 4.7T 11% /usr/local free -m psharp@ncp-skookum:~$ free -m total used free shared buffers cached Mem: 15942 3409 12533 0 20 2983 -/+ buffers/cache: 405 15537 Swap: 19076 0 19076 tail -50 /var/log/syslog Jul 3 06:31:32 ncp-skookum rsyslogd: [origin software="rsyslogd" swVersion="5.8.6" x-pid="1070" x-info="http://www.rsyslog.com"] rsyslogd was HUPed Jul 3 06:39:01 ncp-skookum CRON[14211]: (root) CMD ( [ -x /usr/lib/php5/maxlifetime ] && [ -d /var/lib/php5 ] && find /var/lib/php5/ -depth -mindepth 1 -maxdepth 1 -type f -cmin +$(/usr/lib/php5/maxlifetime) ! -execdir fuser -s {} 2>/dev/null \; -delete) Jul 3 06:40:01 ncp-skookum CRON[14223]: (smmsp) CMD (test -x /etc/init.d/sendmail && /usr/share/sendmail/sendmail cron-msp) Jul 3 07:00:01 ncp-skookum CRON[14328]: (woodsp) CMD (/home/woodsp/bin/mail_tweetupdate # email an update) Jul 3 07:00:01 ncp-skookum CRON[14327]: (smmsp) CMD (test -x /etc/init.d/sendmail && /usr/share/sendmail/sendmail cron-msp) Jul 3 07:00:28 ncp-skookum sendmail[14356]: q63E0SoZ014356: from=woodsp, size=2328, class=0, nrcpts=2, msgid=<[email protected]>, relay=woodsp@localhost Jul 3 07:00:29 ncp-skookum sm-mta[14357]: q63E0Si6014357: from=<[email protected]>, size=2569, class=0, nrcpts=2, msgid=<[email protected]>, proto=ESMTP, daemon=MTA-v4, relay=localhost [127.0.0.1] Jul 3 07:00:29 ncp-skookum sendmail[14356]: q63E0SoZ014356: to=Spencer Wood <[email protected]>,Martin Lacayo <[email protected]>, ctladdr=woodsp (1004/1005), delay=00:00:01, xdelay=00:00:01, mailer=relay, pri=62328, relay=[127.0.0.1] [127.0.0.1], dsn=2.0.0, stat=Sent (q63E0Si6014357 Message accepted for delivery) Jul 3 07:00:29 ncp-skookum sm-mta[14359]: STARTTLS=client, relay=mx3.stanford.edu., version=TLSv1/SSLv3, verify=FAIL, cipher=DHE-RSA-AES256-SHA, bits=256/256 Jul 3 07:00:29 ncp-skookum sm-mta[14359]: q63E0Si6014357: to=<[email protected]>,<[email protected]>, ctladdr=<[email protected]> (1004/1005), delay=00:00:01, xdelay=00:00:00, mailer=esmtp, pri=152569, relay=mx3.stanford.edu. [171.67.219.73], dsn=2.0.0, stat=Sent (Ok: queued as 8F3505802AC) Jul 3 07:09:08 ncp-skookum CRON[14396]: (root) CMD ( [ -x /usr/lib/php5/maxlifetime ] && [ -d /var/lib/php5 ] && find /var/lib/php5/ -depth -mindepth 1 -maxdepth 1 -type f -cmin +$(/usr/lib/php5/maxlifetime) ! -execdir fuser -s {} 2>/dev/null \; -delete) Jul 3 07:17:01 ncp-skookum CRON[14438]: (root) CMD ( cd / && run-parts --report /etc/cron.hourly) Jul 3 07:20:01 ncp-skookum CRON[14453]: (smmsp) CMD (test -x /etc/init.d/sendmail && /usr/share/sendmail/sendmail cron-msp) Jul 3 07:39:01 ncp-skookum CRON[14551]: (root) CMD ( [ -x /usr/lib/php5/maxlifetime ] && [ -d /var/lib/php5 ] && find /var/lib/php5/ -depth -mindepth 1 -maxdepth 1 -type f -cmin +$(/usr/lib/php5/maxlifetime) ! -execdir fuser -s {} 2>/dev/null \; -delete) Jul 3 07:40:01 ncp-skookum CRON[14562]: (smmsp) CMD (test -x /etc/init.d/sendmail && /usr/share/sendmail/sendmail cron-msp) Jul 3 08:00:01 ncp-skookum CRON[14668]: (smmsp) CMD (test -x /etc/init.d/sendmail && /usr/share/sendmail/sendmail cron-msp) Jul 3 08:09:01 ncp-skookum CRON[14724]: (root) CMD ( [ -x /usr/lib/php5/maxlifetime ] && [ -d /var/lib/php5 ] && find /var/lib/php5/ -depth -mindepth 1 -maxdepth 1 -type f -cmin +$(/usr/lib/php5/maxlifetime) ! -execdir fuser -s {} 2>/dev/null \; -delete) Jul 3 08:17:01 ncp-skookum CRON[14766]: (root) CMD ( cd / && run-parts --report /etc/cron.hourly) Jul 3 08:20:01 ncp-skookum CRON[14781]: (smmsp) CMD (test -x /etc/init.d/sendmail && /usr/share/sendmail/sendmail cron-msp) Jul 3 08:39:01 ncp-skookum CRON[14881]: (root) CMD ( [ -x /usr/lib/php5/maxlifetime ] && [ -d /var/lib/php5 ] && find /var/lib/php5/ -depth -mindepth 1 -maxdepth 1 -type f -cmin +$(/usr/lib/php5/maxlifetime) ! -execdir fuser -s {} 2>/dev/null \; -delete) Jul 3 08:40:01 ncp-skookum CRON[14892]: (smmsp) CMD (test -x /etc/init.d/sendmail && /usr/share/sendmail/sendmail cron-msp) Output of hdparm -t /dev/sd{a,b,c,d,e,f} This looks suspicious? /dev/sda: Timing buffered disk reads: 2 MB in 4.84 seconds = 423.39 kB/sec /dev/sdb: Timing buffered disk reads: 420 MB in 3.01 seconds = 139.74 MB/sec /dev/sdc: Timing buffered disk reads: 390 MB in 3.00 seconds = 129.87 MB/sec /dev/sdd: Timing buffered disk reads: 416 MB in 3.00 seconds = 138.51 MB/sec /dev/sde: Timing buffered disk reads: 422 MB in 3.00 seconds = 140.50 MB/sec /dev/sdf: Timing buffered disk reads: 416 MB in 3.01 seconds = 138.26 MB/sec

    Read the article

  • VMware Workstation reboot 32-bit host when starting 32/64-bit guest using VT-x

    - by Powerman
    I'm trying to start 64-bit guest (MacOSX and Windows7) on 32-bit host (Hardened Gentoo Linux, kernel 2.6.28-hardened-r9) using VMware Workstation (6.5.3.185404 and 7.0.1.227600). If VT-X disabled in BIOS, VMware refuse to start 64-bit guest (as expected). If VT-X enabled in BIOS, VMware start guest without complaining, but then, in about a second (I suppose as soon as guest try to switch on 64-bit) my host reboots (actually, it's more like reset - normal reboot procedure skipped and BIOS POST start immediately). My hardware is Core 2 Duo 6600 on ASUS P5B-Deluxe with latest stable BIOS 1101. I've power-cycled system, then enabled Vanderpool in BIOS. My CPU doesn't support Trusted Execution Technology, and there no way to disable it in BIOS. I've rebooted several times after that, sometimes with power-cycled, and ensure Vandertool is enabled in BIOS. I've also run VMware-guest64check-5.5.0-18463 tool, and it report "This host is capable of running a 64-bit guest operating system under this VMware product.". About a year ago I tried to disable hardened in kernel to ensure this isn't because of PaX/GrSecurity, but that doesn't help. I have not checked 32-bit guests with VT-X enabled yet, but without VT-X they works ok. ASUS provide "beta" BIOS updates, but according to their descriptions these updates doesn't fix this issue, so I'm not sure is it good idea to try it. My best guess now it's motherboard/BIOS bug. Any ideas? Update 1: I've tried to boot vt.iso provided at http://communities.vmware.com/docs/DOC-8978 and here is it report: CPU 0: VT is enabled on this core CPU 1: VT is enabled on this core Update 2: I've just tried to boot 32-bit guests (Windows7, Ubuntu9.04 and Gentoo) using all possible virtualization modes. In Automatic, Automatic with Replay, Binary translation everything works, in Intel VT-x/EPT or AMD-V/RVI I got message "This host does not support EPT. Using software virtualization with a software MMU." and everything works. BUT in Intel VT-x or AMD-V mode all 32-bit guests reset host just like 64-bit guests! So, this issue is not specific to 64-bit guests. One more thing. Using Intel VT-x or AMD-V mode for both 32/64-bit guests my host reset right after starting VM, i.e. before VM BIOS POST and before guest even start booting. But using Intel VT-x/EPT or AMD-V/RVI VM BIOS runs ok, then 64-bit guests start booting (Windows7 completed "Loading files" progressbar), and only after that host reset.

    Read the article

  • Advantages of Ubuntu LTS versions over regular Ubuntu?

    - by Adam Matan
    Do the LTS versions of Ubuntu have any advantages for the non-paying customers (who don't get any support?) From the tech spec only, these versions seem outdated in many aspects - mainly drivers and installed software versions. For instance, My previous (bounty!) problem regarding the AGN 5100 drivers would have been solved under Ubuntu 9.04.

    Read the article

  • How do I reset my BIOS password on a Advent 4211 Netbook?

    - by SocialAddict
    The title says it all really but I was hoping for a software solution to remove the password or find out what it is or even change it. It's my laptop but I can't remember what I set the BIOS password too. I know on a PC to take out the battery and clear it with the jumpers but on a laptop I'm slightly scared of breaking something. Any help would be appreciated as I'm currently without a machine!

    Read the article

  • Windows explorer locks files

    - by John Prince
    I'm using Office 2010 & Windows 7 Home Premium 64-bit. My problem starts when I attempt to save e-mail messages to my PC that I have received via Outlook (my ISP is Comcast). I'm using the default .msg file extension option when I attempt to save these e-mails. The resultant files are locked and do not show the normal "envelope" icon. Instead, it’s a “blank page” icon with the right upper corner folded in. These files refuse to open either by double clicking on them or right clicking and trying to open them with Outlook. And when I return to Outlook, I discover that Outlook is now hung up and I have to close it via the Task Manager. To make matters worse, I’ve also discovered that every e-mail message that I've saved on my PC over the years has also somehow become locked and their original "envelope" icon has been replaced with the "blank page" icon. I found and installed an application called LockHunter. As a result, when I right click on a saved and locked e-mail message, I’ve given an option to find out what's locking it. Each time I'm told that the culprit is Windows explorer.exe. When I unlock the file the normal envelope icon is sometimes displayed (but not always) but at least the file can then be opened. But the file is still “squirrely” as it can’t be moved or saved to a folder until it’s unlocked again. On this second attempt, LockHunter says it’s now locked by Outlook.exe. By the way, I don't have this issue when I save Word, Excel & PowerPoint files; only with Outlook. I've exhausted every remedy that I can think of including: making sure that the file and folder options are checked to always show icons and not thumbnails; running the Windows 7 & Office 2010 repair options which find nothing amiss; running a complete system scan with Windows Malicious Software Removal Tool with negative results; verifying that Outlook is the default for opening e-mails; updating all of my applications via Secunia Personal Software Inspector; uninstalling every application that I felt was unnecessary; doing a registry cleanup via CC Cleaner; having Windows Security Essentials always on (it did find one Java Trojan recently which was quarantined and then deleted); uninstalling a bunch of non-Microsoft shell extensions; and deactivating all of the Outlook Add-ins and then re-activating each one. None of this solves the problem. I’d welcome any advice on how to resolve this.

    Read the article

  • PHP ignores upload_tmp_dir?

    - by Matthias Vance
    LS, I am using IIS7 with PHP (FastCGI). I set up the upload_tmp_dir to "X:\Temp" instead of leaving it empty, but it's still using "C:\Windows\Temp" for some reason. I did give the following users full rights : NETWORK SERVICE, (application pool user), IIS_IUSRS. I also restarted IIS after I made the change. I tried to create a directory inside the correct temp path using PHP, and that did work, so it's not a security issue. Kind regards, Matthias Vance

    Read the article

  • Cannot install g++ on ubuntu

    - by Erel Segal
    I don't have g++: erelsgl@ubuntu:/etc/apt$ which g++ erelsgl@ubuntu:/etc/apt$ erelsgl@ubuntu:/etc/apt$ g++ The program 'g++' can be found in the following packages: * g++ * pentium-builder Try: sudo apt-get install <selected package> So I try to install it: erelsgl@ubuntu:~/srilm$ sudo apt-get install g++ Reading package lists... Done Building dependency tree Reading state information... Done g++ is already the newest version. 0 upgraded, 0 newly installed, 0 to remove and 5 not upgraded. 2 not fully installed or removed. After this operation, 0B of additional disk space will be used. Setting up g++ (4:4.4.3-1ubuntu1) ... update-alternatives: error: alternative path /usr/bin/g++ doesn't exist. dpkg: error processing g++ (--configure): subprocess installed post-installation script returned error exit status 2 dpkg: dependency problems prevent configuration of build-essential: build-essential depends on g++ (>= 4:4.3.1); however: Package g++ is not configured yet. dpkg: error processing build-essential (--configure): dependency problems - leaving unconfigured No apport report written because the error message indicates its a followup error from a previous failure. Errors were encountered while processing: g++ build-essential E: Sub-process /usr/bin/dpkg returned an error code (1) I also try to install build-essential, and get same results. I also tried "sudo apt-get update" - didn't help. This is my apt-cache: erelsgl@ubuntu:/etc/apt$ apt-cache policy g++ build-essential g++: Installed: 4:4.4.3-1ubuntu1 Candidate: 4:4.4.3-1ubuntu1 Version table: *** 4:4.4.3-1ubuntu1 0 500 http://il.archive.ubuntu.com/ubuntu/ lucid/main Packages 100 /var/lib/dpkg/status build-essential: Installed: 11.4build1 Candidate: 11.4build1 Version table: *** 11.4build1 0 500 http://il.archive.ubuntu.com/ubuntu/ lucid/main Packages 100 /var/lib/dpkg/status erelsgl@ubuntu:/etc/apt$ I also tried this and got the same error: erelsgl@ubuntu:~/Ace/Files/corpus$ sudo dpkg --configure -a Setting up g++ (4:4.4.3-1ubuntu1) ... update-alternatives: error: alternative path /usr/bin/g++ doesn't exist. dpkg: error processing g++ (--configure): subprocess installed post-installation script returned error exit status 2 dpkg: dependency problems prevent configuration of build-essential: build-essential depends on g++ (>= 4:4.3.1); however: Package g++ is not configured yet. dpkg: error processing build-essential (--configure): dependency problems - leaving unconfigured Errors were encountered while processing: g++ build-essential

    Read the article

  • Using (Squid) Caching Proxy with (HideMyAss) OpenVPN VPN

    - by wajed
    I've set up Squid proxy, and I confirmed it's working on my PC. Note: To be able to use the Internet with better speed, I have to forward to another parent proxy (my university's proxy). Now I'm using HideMyAss VPN (OpenVPN protocol), but without the squid, since I don't know how to configure them to work correctly. Note: I'm using the university's proxy in HideMyAss VPN software so that I get good Internet connection, but if I use squid's proxy, it doesn't work.

    Read the article

< Previous Page | 673 674 675 676 677 678 679 680 681 682 683 684  | Next Page >