Search Results

Search found 35173 results on 1407 pages for 'critical path software'.

Page 684/1407 | < Previous Page | 680 681 682 683 684 685 686 687 688 689 690 691  | Next Page >

  • Tomcat deploy error

    - by David
    When deploying an application with the Tomcat manager I get the following error: FAIL - Failed to deploy application at context path /prademo Tomcat log shows: INFO: HTMLManager: install: Installing context configuration at '/home//webapps/PRA/META-INF/context.xml' from '/home//webapps/PRA' java.io.FileNotFoundException: /home/dstefan/webapps/PRA/META-INF/context.xml (Permission denied) Permission to what? Both PRA and contex.xml have -rwxrwxrwx. Thanks!

    Read the article

  • Widely-used load balancing solutions?

    - by Vimvq1987
    I asked this question http://serverfault.com/questions/124329/network-load-balancing-efficience-and-limits, and a bit disappointed that NLB was not a widely-used solution. I want to ask about widely-used solutions in the world now. Can you give me a list and a brief introduction for each? Cause of limitation of my thesis resource, I need to focus on software-only, Windows-based solution (both database level and system level are welcome). Thank you so much!

    Read the article

  • movie maker problem: re-map paths

    - by Fuxi
    hi, i've upgraded to win7 (on a new machine) and wanted to use my old moviemaker projects again. the problem is that those projects refer to files of a certain path-structure which i can't rebuild under win7 ("documents and settings" is blocked). is there a way to kind of batch-convert those projects? some file specs of the MSWMM file format (for coding a little utility) would be helpful aswell. thx

    Read the article

  • What are the Best Practices and tools for managing Windows Desktops from a linux sever ?

    - by JJ
    I know this is a loaded question! What are the best ways to manage Windows (2000, XP, Vista, Win7) workstation from a centralized linux server. I would like to replace the fuctionaility of MS SBS Server with a linux box. The following issues would need to be addressed. File Sharing Authentication, Authorization, and Access Control Software Installation Centralized Login Script Centralized Backup

    Read the article

  • Correct location of git on Mac OS X

    - by zcreem
    On Mac OS x 10.6.6 I have git installed in /usr/bin/ I wanted to update the got version however the the git installer puts it in /usr/local/git/bin/ I realise I could rearrange to path to point to the local one first but what I do not get is where the /usr/bin version came from. Could it be part of an xcode install and lastly how would I delete correct it. I have looked and looked but find nothing and I didn't install it with ports etc. thanks

    Read the article

  • Configuring only one Internet Explorer zone (IntranetZone) thru GPO without affecting other zones?

    - by MadBoy
    I need to deploy some trusted intranet sites into Intranet Zone in Internet Explorer. It works fine when using GPO at: Setting Path: Computer Configuration/Administrative Templates/Windows Components/Internet Explorer/Internet Control Panel/Security Page Supported On: At least Internet Explorer 6.0 in Windows XP Service Pack 2 or Windows Server 2003 Service Pack 1 Problem is this settings also affect other zones making it impossible for people in company to add sites to other zones themselves. Is there a way to fix this so that Intranet Zone is deployed thru GPO and rest of settings stay in gesture of users?

    Read the article

  • Oracle VM provisioning from dnsmasq

    - by Mircea Vutcovici
    I have Oracle VM 2.2.0 and a provisioning server (dhcp/tftp/http) based on dnsmasq. A VM that it is configure too boot from the network, is receiving the IP, but it is failing to boot. The error displayed by gPXE 0.9.3+ is: No filename or root path specified

    Read the article

  • Select a word using keyboard special case

    - by wataka
    I know the Ctrl+Shift+Arrow_Key to select a word. But suppose this is the case: "Hello!, my na|me is Peter" Where the cursor is where the pipe is. I'm looking for some keyboard shorcut that select the word "name". The only way I found was: Ctrl+Right, Left, Ctrl+Shift+Left. But it isn't practical. Any hint? Edit: I'm on Windows 7, and I'd like some generic solution if exists (not software dependent)

    Read the article

  • How to access shared files in two different domains

    - by Sundeep
    There are two internal domains, domainA and domainB at my workplace. I could remote into machines from either domains by using respective credentials. My doubt is if I create a shared folder on domainA with read access to everyone for e.g., \\server1.domainA.net\sharedfolder. Will I be able to access this folder by just entering the path likewise from any machine in domainB without entering credentials.

    Read the article

  • linux centos 5.6 someone installed irc

    - by Peter
    I need some help, my server provider contacted me to tell me my server was using 200mbit/s bandwidth. Upon investigation I found processes for a user that should not be there.. I found processes as follows: 26269 511 Nov27 ./stealth 58.22.68.253 53 775 511 Oct12 ./eggdrop -m botnick.conf I know eggdrop is IRC, my question is, where can I find out where the software has been installed for these processes?

    Read the article

  • Need help w/ rsync

    - by user71106
    I need some help getting my rync command syntax working. I need to clone the /home/user/public_html folder on a remote server to the server I am logged into via SSH, copying the folder into the same exact path on this local machine. I have root on the local machine I'm in session on and a user account shell on the remote machine. I'm not clear on where to put the SSH login info and how to define the folder paths.

    Read the article

  • Upgrade only one version of XP to Windows 8 on a dual boot computer

    - by Shane
    I have a computer running Windows XP Pro 32-bit and 64-bit in dual boot. I need to retain Windows XP 32-bit Pro, as I have expensive software that will only run on that specific version. I want to upgrade my 64-bit installation of XP to Windows 8 without losing the 32-bit installation. If I simply use the ISO to upgrade from within my XP 64-bit installation, will I retain dual boot for both XP 32-bit and Windows 8?

    Read the article

  • Verify burned CD image

    - by Brian
    Is there a way to verify a CD image (.iso) after it has been burned (and either the CD burning software does not have a "verify" option, or it was not used at the time of burning)? I tried ripping the CD using dd and comparing the md5sum of that image and the original, but they don't match. I didn't really expect them to, but I'm pretty sure this disc burned without errors (I just want to be sure since this is a master disc to be sent off to be duplicated).

    Read the article

  • Open a file with eclipse via terminal and focus eclipse window

    - by Rui Carneiro
    I am a webdeveloper and my current working tools are: Terminal (ssh, tailing logs, grep, git, etc) Eclipse (PDT, Javascript, etc) Firefox (Developer Toolbar + Firebug) The problem is that I hate using the eclipse navigation tree. For me it is a lot easier to go to the Terminal and do something like this: $ eclipse /var/www/myproject/long/path/lib/Driver/Sql.php The annoying part is that the eclipse window is not focused after this command. I have to manually click on the eclipse window (using mouse... :@ grrr) Anyway to force eclipse to be focused?

    Read the article

  • Video Resources to learn Ubuntu

    - by Samy
    I'm starting to learn how to run a server and decided to learn Ubuntu as I was told it's the most newbie friendly. Can the more experienced folks here suggest some good video resources to learn Ubuntu that helped you when you were starting out? I'm a total newbie to server management and only have software experience. Thanks

    Read the article

  • Very poor read performance compared to write performance on md(raid1) / crypt(luks) / lvm

    - by Android5360
    I'm experiencing very poor read performance over raid1/crypt/lvm. In the same time, write speeds are about 2x+ faster on the same setup. On another raid1 setup on the same machine I get normal read speeds (maybe because I'm not using cryptsetup). OS related disks: sda + sdb. I have raid1 configuration with two disks, both are in place. I'm using LVM over the RAID. No encryption. Both disks are WD Green, 5400 rpm. IO test results on this raid1: dd if=/dev/zero of=/tmp/output.img3 bs=8k count=256k conv=fsync - 2147483648 bytes (2.1 GB) copied, 22.3392 s, 96.1 MB/s sync echo 3 > /proc/sys/vm/drop_caches dd if=/tmp/output.img3 of=/dev/null bs=8k - 2147483648 bytes (2.1 GB) copied, 15.9 s, 135 MB/s And here is the problematic setup (on the same machine). Currently I have only one sdc (WD Green, 5400rpm) configured in software raid1 + crypt (luks, serpent-xts-plain) + lvm. Tomorrow I will attach another disk (sdd) to complete this two-disk raid1 setup. IO tests results on this raid1: dd if=/dev/zero of=output.img3 bs=8k count=256k conv=fsync 2147483648 bytes (2.1 GB) copied, 17.7235 s, 121 MB/s sync echo 3 > /proc/sys/vm/drop_caches dd if=output.img3 of=/dev/null bs=8k 2147483648 bytes (2.1 GB) copied, 36.2454 s, 59.2 MB/s We can see that the read performance is very very bad (59MB/s compared to 135MB/s when using no encryption). Nothing is using the disks during benchmark. I can confirm this because I checked with iostat and dstat. Details on the hardware: disks: all are WD green, 5400rpm, 64mb cache. cpu: FX-8350 at stock speed ram: 4x4GB at 1066Mhz. Details on the software: OS: Debian Wheezy 7, amd64 mdadm: v3.2.5 - 18th May 2012 LVM version: 2.02.95(2) (2012-03-06) LVM Library version: 1.02.74 (2012-03-06) LVM Driver version: 4.22.0 cryptsetup: 1.4.3 Here is how I configured the slow raid1+crypt+lvm setup: parted /dev/sdc mklabel gpt type: ext4 start: 2048s end: -1 Now the raid, crypt and the lvm configuration: mdadm --create /dev/md1 --level=1 --raid-disks=2 missing /dev/sdc cryptsetup --cipher serpent-xts-plain luksFormat /dev/md1 cryptsetup luksOpen /dev/md1 md1_crypt vgcreate vg_sql /dev/mapper/md1_crypt lvcreate -l 100%VG vg_sql -n lv_sql mkfs.ext4 /dev/mapper/vg_sql-lv-sql mount /dev/mapper/vg_sql-lv_sql /sql So guys, can you help me identify the reason and fix it? It has to be something with the cryptsetup as there is no such read slowdown on the other setup (sda+sdb) where no encryption is present. But I have no idea what to do. Thanks!

    Read the article

  • Script to reorder ACLs in Windows server 2008?

    - by zimdawg
    I have ran a tool called admnalow.exe that re-grants access to the local administrators (BUILTIN\Administrators) group for all directories and subdirectories in a given path. The problem is it seems to have caused the ACL's to be ordered improperly. I've been looking everywhere and have been unable to find a .vbs or any other script that will parse through a set of directories and reorder the ACLs. This can be done manually but would be incomprehensible for thousands of directories. Can anyone help?!?!

    Read the article

  • Fedora 15 liveCD for most common wireless and wired network interfaces [closed]

    - by user800133
    I've created a Fedora 15 liveCD that is customized for my application. On the first laptop I tried, it didn't have the driver for the Broadcom BCM43224 wireless network interface. This software will be used on a wide variety of laptops. Is there are reasonable way to add drivers for the all most common wireless and wired network interfaces available today? If it's not much trouble I'd also like to add support for the common 3G/4G USB dongles.

    Read the article

  • IPv6 tunnel broker setup

    - by fred basset
    I'm working on a solution to allow remote Linux nodes that are behind firewalls to be accessible for SSH and web server. Can anyone suggest an IPv6 tunnel scheme that would work with NAT firewalls? And what software would be needed on the remote nodes and the central server? Also I do not believe the ISP at either side does native IPv6. A solution where we could have static IPv6 addresses on the remote Linux nodes would be ideal. Thank you, Fred

    Read the article

  • Good DVD ripper - for Divx

    - by alex
    I'm currently going through my DVD collection, and digitising it, to allow me to watch it on a media streamer (I'm NOT a filesharer!!) I want to know what software i should use, to convert my DVD's to AVI divx format. I currently use Xilisoft DVD ripper, however this creates a "letterbox" at the top and bottom of the file - and there doesn't seem to be a way to turn this off. I'm a novice at video encoding, so would need something fairly simple / well documented.

    Read the article

< Previous Page | 680 681 682 683 684 685 686 687 688 689 690 691  | Next Page >