  • How many developers do I need to build a website like Freelancer.com in about 3-5 months? [closed]

    - by Sam
    I have been asked to make a list of people that I need to build something similar to freelancer.com. Not exactly same, has a few more features to it too but I can't really get my head around the whole freelancer.com site. I have built a social networking site from scratch which is 70% of Facebook and 20% Google+ in about 5 months with raw PHP, JS, CSS and Ajax. I dont think it will take me more than a month or something to build the whole freelancer.com from scratch. Please suggest anything that should I pay attention to. I am thinking about: 2 php developers 1 mysql engineer 1 network/server engineer 1 graphics artist 1 UI developer Time frame: 20 days Is this a good estimation?

    Read the article

  • What is better: set up underestimated or overestimated deadlines?

    - by sergdev
    Suppose you are a project manager. You can estimate an effort in days for specific task for specific developer. After performing estimation you obtain some min and max values. After this you delegate a task to developer. Actually you also set up deadline. Which estimation is better to use when set up deadline: min or max? As I see min estimation can result in stress for developer, max estimation can result in using all the time which is allocated to developer even if task can be complete faster (so called Student syndrome). Which other pros and cons of two approaches? Small clarification: I speak about setting up deadlines for subordinates when delegating the task, NOT for reporting to my boss.

    Read the article

  • Personal Software Process (PSP1)

    - by gentoo_drummer
    I'm trying to figure out an exercise but it doesn't really makes to much sense.. I'm not asking someone to provide the solution. just to try and analyse what needs to be done in order to solve this. I'm trying to understand which PSP 1.0 1.1 process I should use. PROBE? Or something else? I would greatly appreciate some help on this one from someone that has experience with the Personal Software Process Methodology.. Here is the question. For the reference case (“code1.c”), the following s/w metrics are provided: man-hours spent in implementation phase (per-module): 2,7 mh/file man-hours spent in testing phase (per-module): 4,3 mh/file estimated number of bugs remaining (per-module): 0,3 errors/function, 4 errors/module (remaining) Based on the corresponding values provided for the reference case, each of the following tasks focus on some s/w metrics to be estimated for the test case (“code2.c”): [25 marks] (estimated) man-hours required in implementation phase (per-module) [8 marks] (estimated) man-hours required in testing phase (per-module) [8 marks] (estimated) number of bugs remaining at the end of testing phase (per-module) [9 marks] Tasks 4 through 6 should use the data provided for the reference case within the context of Personal Software Process level-1 (PSP-1), using them as a single-point historic data log. Specifically, the same s/w metrics are to be estimated for the test case (“code2.c”), using PSP as the basic estimation model. In order to perform the above listed tasks, students are advised to consider all phases of the PSP software development process, especially at levels PSP0 and PSP1. Both cases are to be treated as separate case-studies in the context of classic s/w development.

    Read the article

  • HMM for perspective estimation in document image, can't understand the algorithm

    - by maximus
    Hello! Here is a paper, it is about estimating the perspective of binary image containing text and some noise or non text objects. PDF document The algorithm uses the Hidden Markov Model: actually two conditions T - text B - backgrouond (i.e. noise) It is hard to understand the algorithm itself. The question is that I've read about Hidden Markov Models and I know that it uses probabilities that must be known. But in this algorithm I can't understand, if they use HMM, how do they get those probabilities (probability of changing the state from S1 to another state for example S2)? I didn't find anything about training there also in that paper. So, if somebody understands it, please tell me. Also is it possible to use HMM without knowing the state change probabilities?

    Read the article

  • Non-graphical linearity estimation

    - by aL3xa
    In my previous post, I was looking for correlation ratio (η or η2) routines in R. I was surprised by the fact that no one uses η for linearity checking in the GLM procedures. Let's start form a simple example: how do you check linearity of bivariate correlation? Solely with scatterplot? There are several ways of doing this, one way is to compare linear and non-linear model R2, then to apply F test to seek for significant difference between them. Finally, the question is: How do you check linearity, the "non-grafical" way?

    Read the article

  • Using Completed User Stories to Estimate Future User Stories

    - by David Kaczynski
    In Scrum/Agile, the complexity of a user story can be estimated in story points. After completing some user stories, a programmer or team of programmers can use those experiences to better estimate how much time it might take to complete a future user story. Is there a methodology for breaking down the complexity of user stories into quantifiable or quantifiable attributes? For example, User Story X requires a rich, new view in the GUI, but User Story X can perform most of its functionality using existing business logic on the server. On a scale of 1 to 10, User Story X has a complexity of 7 on the client and a complexity of 2 on the server. After User Story X is completed, someone asks how long would it take to complete User Story Y, which has a complexity of 3 on the client and 6 on the server. Looking at how long it took to complete User Story X, we can make an educated estimate on how long it might take to complete User Story Y. I can imagine some other details: The complexity of one attribute (such as complexity of client) could have sub-attributes, such as number of steps in a sequence, function points, etc. Several other attributes that could be considered as well, such as the programmer's familiarity with the system or the number of components/interfaces involved These attributes could be accumulated into some sort of user story checklist. To reiterate: is there an existing methodology for decomposing the complexity of a user story into complexity of attributes/sub-attributes, or is using completed user stories as indicators in estimating future user stories more of an informal process?

    Read the article

  • quick approach to migrate classic asp project to asp.net

    - by Buzz
    Recently we got a requirement for converting a classic asp project to asp.net. This one is really a very old project created around 2002/2003. It consists of around 50 asp pages. I found very little documentation for this project, FSD and design documents for only a few modules. Just giving a quick look into this project my head start to hurt. It is really a mess. I checked the records and found none of the developers who worked on this project work for the company anymore. My real pain is that this is an urgent requirement and I have to provide an estimated deadline to my supervisor. I found a similar question classic-asp-to-asp-net, but I need some more insight on how to convert this classic asp project to asp.net in the quickest possible way.

    Read the article

  • Freelancing - Getting paid for the quote or estimate

    - by jah
    It is often necessary to spend time designing a solution, breaking down the design into tasks and sub tasks and estimating the time it will take to complete each task in order to produce a reasonable estimate or quote for a programming task. This process can be a serious investment of time, often without any guarantee that the estimate/quote will be acceptable to the potential client and more often that not the time was 'wasted' with no hope of getting paid for it (in the event of not winning the job). Is it the case that this is a cost of doing business and what can be done to minimise this unpaid time?

    Read the article

  • Should you ever re-estimate user stories?

    - by f1dave
    My current project is having a 'discussion' which is split down the middle- "this story is more complex than we originally thought, we should re-estimate" vs "you should never re-estimate as you only ever estimate up and never down". Can anyone shed some light on whether you ever should re-estimate? IMHO I'd imagine you could bring up an entirely new card for a new requirement or story, but going back and re-estimating on backlog items seems to skew the concept of relative sizing and will only ever 'inflate' your backlog.

    Read the article

  • Project Manager that wants to lock in time estimate with a signed contract

    - by sunpech
    At a previous employment, a project manager (PM) wasn't satisfied with the delivery time of the code on a project I was on. I was told by my project lead that that the PM was considering having me sign a contract to lock-in my time estimates I gave for tasks and delivery dates. The situation on the project was that we were working with new technologies, codebase, coding standards, and very prone-to-change requirements. I was learning new things and applying them the best I could on requirements that kept on changing. The requirements throughout the iterations grew by 2-3 times, with my estimate-to-complete growing by roughly 5-8 times. The only things that didn't change were the estimates and delivery dates. Yes, I did end up missing most deadlines. And I was working on some very new technologies that no one else on the entire development team could really help out on because they wouldn't be familiar with it. At least not easily. It seemed to me then, that the PM wanted his numbers to add up-- and thus wanted me to sign a contract to "ensure" that I would always deliver working code on time. I suppose with a signed contract the PM could use it against me if I couldn't deliver on time. I believe what happened next was that other project managers and/or project leads defended me, and didn't let this happen. My question is, should this raise a red flag about the manager? Is it common practice for a manager to lock-in time estimates of a software developer with a signed contract? Or in this case, try to. Please note, I was a full time employee, not an independent consultant. Update: I want to add that I did give new estimates weekly, but it seems the original estimates and delivery dates were what the PM was fixated on.

    Read the article

  • Tool to track time estimations vs, actual time

    - by mb1
    Following these two questions: How to respond when asked for Estimate, What's the best project management software for small team I am looking for a tool that combines project management with the ability to plan all tasks for a project, give time estimates and afterwards track actual time spent on items and have comparison between estimate and actual time. I am going to try TargetProcess since I see it has time tracking capabilities. Anyone have a tool they use?

    Read the article

  • Can I trust the Basic schedule equation?

    - by Steve Campbell
    I've been reading Steve McConnell's demystifying the black art of estimating book, and he gives an equation for estimating nominal schedule based on Person-months of effort: ScheduleInMonths = 3.0 x EffortInMonths ^ (1/3) Per the book, this is very accurate (within 25%), although the 3.0 factor above varies depending on your organization (typically between 2 and 4). It is supposedly easy to use historical projects in your organization to derive an appropriate factor for your use. I am trying to reconcile the equation against Agile methods, using 2-6 week cycles which are often mini-projects that have a working deliverable at the end. If I have a team of 5 developers over 4 weeks (1 month), then EffortInMonths = 5 Person Months. The algorithm then outputs a schedule of 3.0 x 5^(1/3) = 5 months. 5 months is much more than 25% different than 1 month. If I lower the 3.0 factor to 0.6, then the algorthim works (outputs a schedule of approx 1 month). The lowest possible factor mentioned in the book through is 2.0. Whats going on here? I want to trust this equation for estimating a "traditional" non-agile project, but I cannot trust it when it does not reconcile with my (agile) experience. Can someone help me understand?

    Read the article

  • How should I log time spent on multiple tasks?

    - by xenoterracide
    In Joel's blog on evidence based scheduling he suggests making estimates based on the smallest unit of work and logging extra work back to the original task. The problem I'm now experiencing is that I'll have create object A with subtask method A which creates object B and test all of the above. I create tasks for each of these that seems to be resulting in ok-ish estimates (need practice), but when I go to log work I find that I worked on 4 tasks at once because I tweak method A and find a bug in the test and refactor object B all while coding it. How should I go about logging this work? should I say I spent, for example, 2 hours on each of the 4 tasks I worked on in the 8 hour day?

    Read the article

  • Estimating time for planning and technical design using Evidence Based Scheduling

    - by Turgs
    I'm at the beginning of a development project in a large organization. The Functional Requirements are currently being worked out and documented with our business stakeholders by our Enterprise Design department. I'm required to produce Technical Design Documents and manage the team to actually build the solution. I'm wanting to try Evidence Based Scheduling, but as I understand, part of that is breaking the job down into small tasks that are less than 14 hours in duration, which requires me to have already done the Technical Design. Therefore, can Evidence Based Scheduling only be used after the Technical Design has been done? How do you then plan and estimate the time it may take to come up with the Technical Design?

    Read the article

  • How do freelancers know how much their work is worth?

    - by Qmal
    I want to start a bit of freelancing in web development using ASP.NET MVC3 and PHP and I already have some people who are interested in hiring me, but I still can't figure out how much to charge for projects since I have never done it. For example how much would this site cost? Would it cost more if the author built it from scratch instead of using WordPress as the CMS? Or what about a simpler site like this? How much time spent is considered good/normal for building sites like these? And maybe some freelancers with experience can tell me what the usual requests are that they get from clients. What sites are the most in demand? I'm asking because I'm a student and I really can't work every day in a full-time job but I need the money so I guess a little freelancing would help me out.

    Read the article

  • Encouraging software engineers to track time

    - by M. Dudley
    How can I encourage my coworkers to track the time they spend resolving issues and implementing features? We have software to do this, but they just don't enter the numbers. I want the team to get better at providing project estimates by comparing our past estimates to actual time spent. I suspect that my coworkers don't see the personal benefit, since they're not often involved in project scheduling.

    Read the article

  • How to explain to non-technical person why the task will take much longer then they think?

    - by Mag20
    Almost every developer has to answer questions from business side like: Why is going to take 2 days to add this simple contact form? When developer estimates this task, they may divide it into steps: make some changes to Database optimize DB changes for speed add front end HTML write server side code add validation add client side javascript use unit tests make sure SEO is setup is working implement email confirmation refactor and optimize the code for speed ... These maybe hard to explain to non-technical person, who basically sees the whole task as just putting together some HTML and creating a table to store the data. To them it could be 2 hours MAX. So is there a better way to explain why the estimate is high to non-developer?

    Read the article

  • How is time calculation performed by a computer?

    - by Jorge Mendoza
    I need to add a certain feature to a module in a given project regarding time calculation. For this specific case I'm using Java and reading through the documentation of the Date class I found out the time is calculated in milliseconds starting from January 1, 1970, 00:00:00 GMT. I think it's safe to assume there is a similar "starting date" in other languages so I guess the specific implementation in Java doesn't matter. How is the time calculation performed by the computer? How does it know exactly how many milliseconds have passed from that given "starting date and time" to the current date and time?

    Read the article

  • On what basis would you split donation money among your open source team members without any strife?

    - by Vigneshwaran
    I am a developer of an open source project which is hosted in SourceForge. It started out as a little app then after some releases, it got more and more popular and it started consuming more time and responsibility from me. So I have enabled the donation option in SourceForge. I'm passionate to continue developing it for free but if (ever) any money comes in, how should I split it with my team? Should I split the amount equally among the number of team members? (50-50 as it is two-member team now) Number of classes, commits or any other valuable submissions by team members? Any other idea? What would you do in such situation? Please give your opinions. I hope this question will be useful for others.

    Read the article

  • Presenting agile estimates for Pivotal Tracker project

    - by Tom Styles
    I've been developing for 6-7 years but never in a particularly agile way. With the latest project I'm trying to make our development process more professional, and more agile. We're using Pivotal Tracker to track the project and have gathered some pretty well thought out stories. We're also trying to keep some of our (Prince2/Waterfall mindset) project managers happy. So far I've got them to accept that requirements always change priorities always change some of the requirements won't be delivered if you fix the time scale you should fix the time scale short sprints and regular review is good However they still feel like they need to get a better grip of roughly how much will be delivered within a certain time. I've come up with a spreadsheet to demonstrate what we might expect to get done in a range of 4 different timescales. Questions Are we setting ourselves up to fail Are there better ways to do this

    Read the article

  • How to handle estimates for programmers joining the team?

    - by Jordan
    Iteration has already started, new programmer joins the team, task X has already been estimated to be 30 hours by a different developer. What is the best practice in this situation? new developer runs with the given estimate (the idea being that any discrepancy will be corrected for when velocity is calculated?) new developer re-estimates task? (if so, what if it's significantly higher and no longer fits in the iteration?) throw our hands up and go back to waterfall? something else entirely?

    Read the article

  • Quantitfying a cost for a software project

    - by The Elite Gentleman
    Disclaimer: I didn't know exactly where to put this question. If you feel that this question is not suitable for Programmers @ StackExchange, feel free to migrate it. Background: Broadening my last question, there is a request for tender for a software system that's open and I have decided to take it on. I am a software developer & engineer by profession and, in this tender process, I have to put on the pricing for my bid. I have been provided a documentation consisting of functional and non-functional requirements only. I have to put a project manager's cap on and think of all aspects, e.g. cost for implementation for the project, resources needed, etc. My question is: Is there a project framework that I can follow that breaks the project cycle into steps and corresponding cost aspect or how would I go about best calculating/approximating the cost for the project?

    Read the article

  • Finishing an iteration early

    - by f1dave
    I'd like some input on this on those working with agile methodologies... A current project is finding that development on our planned user stories is finishing some time before the end of the iteration, and that the testing effort and business acceptance is what's actually dragging us out longer towards the end. This means that the devs in question have spare time, and they're essentially going out to the iteration+1 backlog and starting work on cards there before our current iteration cards are 'done'. As iteration manager, I want to put a stop to this - I want a more team-orientated approach where the group takes ownership of getting all the cards done, as opposed to "Well, dev's done so what do I dev next?" The problem I face is convincing the team of this. On one hand, I understand why the devs don't want to test the code they've written (there are unit tests they write of course, but the manual testing to be done could be influenced by their bias). The team sees working ahead as making our next iterations easier, because a lot of the work is done before we start. I see this as screwing with the whole system of planning/actuals - but it's difficult to convince the team as to why this matters. What advice can you guys and girls give? How do we stop devs reaching ahead? What should they be doing instead? How much of a problem is this in the scheme of things, if things are still getting done?

    Read the article

  • Scrum - how to carry over a partially complete User Story to the next Sprint without skewing the backlog

    - by Nick
    We're using Scrum and occasionally find that we can't quite finish a User Story in the sprint in which it was planned. In true Scrum style, we ship the software anyway and consider including the User Story in the next sprint during the next Sprint Planning session. Given that the User Story we are carrying over is partially complete, how do we estimate for it correctly in the next Sprint Planning session? We have considered: a) Adjusting the number of Story Points down to reflect just the work which remains to complete the User Story. Unfortunately this will mess up reporting the Product Backlog. b) Close the partially-completed User Story and raise a new one to implement the remainder of that feature, which will have fewer Story Points. This will affect our ability to retrospectively see what we didn't complete in that sprint and seems a bit time consuming. c) Not bother with either a or b and continue to guess during Sprint Planning saying things like "Well that User Story may be X story points, but I know it's 95% finished so I'm sure we can fit it in."

    Read the article

  • Kernel module implementation estimate

    - by Ivan Teterevkov
    I have a very abstract question about a kernel module writing estimate. How much dev-hours/months may required to write or, especially, port an existant kernel driver for a new PCI HBA from one operating system to another (with different kernel API)? I am porting an already written kernel module for 82599 for Linux kernel to OS X's IOKit and try to get a working alpha. I can't imagine for how long this task may expand in time.

    Read the article