Search Results

Search found 5 results on 1 pages for 'indignant'.

Page 1/1 | 1 

  • How do I produce a screenshot of a flash swf on the server?

    - by indignant
    I'm writing a flash app using the open source tools. I would like to load a data file in to the app and capture a screenshot of the stage on the server. The only part that seems mysterious is running the app on the server. In fact, I don't even care if it's the same app running on the server and in the browser--if I can use the flash stage and drawing routines to produce an image server-side, I'm happy. If I have to delve in to flex, fine. Right now I'm having problems finding any starting point at all. I gather Adobe has some commercial products that may fit the bill, but I'd like to stick with open source, apache, and linux. I know this is probably possible with haxe/neko, but I'd like to use more mainstream tools if possible. Am I asking too much? EDIT/CLARIFICATION: Many thanks for the responses so far, but I think I've been a bit muddy in my description. I've already written the actual stage-grabbing stuff using the same PNGEncoder class as was suggested. The problem is in actually running the swf on the server side. I don't want to let the client take the screen shot itself, because this opens up the possibility of the client maliciously submitting a screenshot which does not correspond to what is on the stage, that is, I don't want users uploading porn. If I could run the the actionscript code on the server, then I could generate the screenshot from my data files and be sure that the screenshot matches the data, but I have no idea how to run the actionscript or swf on the server.

    Read the article

  • Paranoid management, contractor checking work [closed]

    - by user833345
    Just wanted to get some opinions and experiences on an issue I'm having at work. First, a little background. I've been working at a company for some time (past any probation periods) and rewriting a horrendous system. No tests, incomplete and broken functionality everywhere, enough copypasta to feed a small village, redundant code, more unused SQL tables than used ones and terrible performance. I've never seen such bad code, pretty much all of it is worthy of being posted on TheDailyWTF. The company has been operating for a number of years and have had a string of bad developers working on this system. I made a call on rewriting instead of refactoring since I judged it to be less work overall and decided that the result will address the requirements more appropriately, since the central requirement is to have a future-proof system for the next decade with plenty of room to scale up. Refactoring would have entailed untangling a huge ball of yarn and at the same time integrating it with a proper foundation or building a foundation from scratch. I've introduced the latest spiffy framework, unit & functional testing, CI, a bug tracker and agile workflow to the environment. I've fixed most of the performance issues of the old system (there were no indexes on any of the tables, for example). I've created an automated deployment process for the old system. The CTO has been maintaining the old system while I have been building the new one and he has been advising management that everything is being done as per best practices. However, management is hiring a contractor to come in and verify my work. In my experience, this is unprecedented. I can understand their reasoning to an extent, since they've had bad luck in the past, but can't help but feel somewhat offended at the fact that they distrust two senior developers who have been working with them for some time enough that a third party is being brought in. And it's not just me who is under watch - people's emails are constantly checked, someone had a remote desktop application installed on their computer of which I was asked to check the usage logs to try to determine if they were stealing sensitive data and there are CCTV cameras in one of the rooms. It's the first time I've decided to disable my Skype history at work. Am I right to feel indignant here? Has anyone else ever encountered such a situation? If so, how did it work out in the end? Was it worth sticking around? Should I just find another job?

    Read the article

  • How To Monitor Home Wireless Network Connected Devices Bandwith

    - by GWLlosa
    (Originally posted on SuperUser, not sure if it might be better suited here) I have in my home a standard Comcast cable internet connection. I have it going from the wall to a cable modem, and from the modem to a late-series Linksys router, which provides wired and wireless networking. The vast majority of the users are wireless connections. For day-to-day tasks, this connection is fully sufficient for all my needs. However, on regular occassions, we have social gatherings that involve many people bringing laptops and other PCs and using the network and internet simultaneously, frequently for gaming. I have no administrative oversight over these machines; they have been known to be riddled with spyware and/or bloatware or be running torrents, legal or otherwise. The only reason I care is that on a regular basis, one of the machines will flatline my internet bandwith, and consume it all in order to upload/download/spam people/whatever. When this happens, the latency of the connections for gaming and the like becomes unacceptable, and everyone suffers. My question is: Is there a system I can set up whereby I can easily monitor the various systems connected to my wireless connection, see how much bandwith each one is using, and for what ends? That way, at a glance, I can spot the offending machine and kick it from the connection, without having to go from machine to machine, checking each one's "bandwith used" properties manually, and dealing with the owner's indignant protests all the while. I understand this will likely involve 3rd-party software and/or hardware; my issue is I don't even know where to begin.

    Read the article

  • How to monitor bandwidth use of each device on wifi network

    - by GWLlosa
    I have in my home a standard Comcast cable internet connection. I have it going from the wall to a cable modem, and from the modem to a late-series Linksys router, which provides wired and wireless networking. The vast majority of the users are wireless connections. For day-to-day tasks, this connection is fully sufficient for all my needs. However, on regular occassions, we have social gatherings that involve many people bringing laptops and other PCs and using the network and internet simultaneously, frequently for gaming. I have no administrative oversight over these machines; they have been known to be riddled with spyware and/or bloatware or be running torrents, legal or otherwise. The only reason I care is that on a regular basis, one of the machines will flatline my internet bandwith, and consume it all in order to upload/download/spam people/whatever. When this happens, the latency of the connections for gaming and the like becomes unacceptable, and everyone suffers. My question is: Is there a system I can set up whereby I can easily monitor the various systems connected to my wireless connection, see how much bandwith each one is using, and for what ends? That way, at a glance, I can spot the offending machine and kick it from the connection, without having to go from machine to machine, checking each one's "bandwith used" properties manually, and dealing with the owner's indignant protests all the while. I understand this will likely involve 3rd-party software and/or hardware; my issue is I don't even know where to begin.

    Read the article

  • How to tell whether your programmers are under-performing?

    - by A Team Lead
    I am a team lead with 5+ developers. I have a developer (let's call him A) who is a good programmer, who writes good clean, easy to understand code. However he is somewhat difficult to manage, and sometimes I wonder whether he is really under-performing or not. Our company requires the developers to indicate the work progress in the bug tracker we use, not so much as to monitor the programmers but to let the stackholders know the progress. The thing is, A only updates a task progress when it is done ( maybe 3 weeks after it is first worked on) and this leaves everyone wondering what is going on in the middle of the development week. He wouldn't change his habit despite repeated probing. ( It's OK, developers hate paperwork, I do, too) Recent 2-3 months he on leave quite often due to various events-- either he is sick, or have to attend a lot of personal events etc. ( It's OK, bad things happen in a string. It's just a coincidence) We define sprints, or roadmaps for each month. And in the beginning of the sprint, we will discuss the amount of work each of the developers have to do in a sprint and the developers get to set the amount of time they need for each task. He usually won't be able to complete all of them. (It's OK, the developers are regularly missing deadlines not due to their fault). If only one or two of the above events happen, I won't feel that A is under-performing, but they all happen together. So I have the feeling that A is under-performing and maybe-- God forbid--- slacking off. This is just a feeling based on my years of experience as programmer. But I could be wrong. It is notoriously hard to measure the work of a programmer, given that not all two tasks are alike, and there lacks a standard objective to measure the commitment of a programmer to your company. It is downright impossible to tell whether the programmer is doing his job or slacking off. All you can do, is to trust them-- yeah, trusting and giving them autonomy is the best way for programmers to work, I know that, so don't start a lecture on why you need to trust your programmers, thank you every much-- but if they abuse your trust, can you know? My question is, how can you tell whether your programmers are under-performing? Surely there are experience team leads who know better than me on this? Outcome: I've a straight talk with him regarding my perception on his performance. He was indignant when I suggested that I had the feeling that he wasn't performing at his best level. He felt that this was a completely unfair feeling. I then replied that this was my feeling and I didn't know whether my feeling was right or not. He would have none of this and ended the discussion immediately. Before he left he said that he "would try to give more to the company" in a very cold tone. I was taken aback by his reaction. I am sure that I offended him in some ways. Not too sure whether that was the right thing to do for me to be so frank with him, though. Extra notes: I hate micromanaging. So all that we have for our software process is Sprint ( where tasks get prioritized and assigned, and at the end of the month, a review of the amount of work done). Developers would require to update the tasks as they go along everyday. There is no standup meeting, or anything of the sort. Mainly because we have the freedom to work from home and everyone cherishes this freedom. Although I am the one who sets the deadline, but the developers will provide the estimate for each tasks and I will decide-- based on the estimate-- the tasks that go into a particular sprint. If they can't finish the tasks at the end of the sprint, I will push them to the next. So theoretically one can just do only 1 or 2 tasks during the whole sprint and then push the remaining 99 tasks to the next sprint and still he will be fine as long as justifies this-- in the form of daily work progress updates

    Read the article

1